Risk management plan – a template to fill in and a pre-trade checklist
Previous lessons separately covered risk per trade and limits, invalidation, volume, drawdown and halts, correlated exposure, and events and VaR limitations. Now you will transfer the results into one document with space for your own numbers. Each field identifies its source lesson and recalculation condition. We will combine eleven decisions into seven working groups while retaining every definition and scope. Shared calculations will check percentage-to-currency conversions and whether summed losses fit period limits; cards support entry checks, reviews and version changes. A plan written in advance does not itself improve decision quality. It establishes criteria before a loss and lets you check afterwards whether they were followed.

Make one line of the plan reconcile to the account
A plan becomes usable when another person can reproduce its number from a dated account record. “Some room remains” is hard to audit. “This is the current equity, this loss is already included, and this debit is still ahead” lets you check both the arithmetic and the decision.
Consider a hypothetical EUR account with session-opening equity of 20,000 EUR, no deposits or withdrawals and a fixed daily equity floor of 19,700 EUR. At 10:42:08 UTC its recorded equity is 19,820 EUR. The account record reconciles that amount as follows. The figures are invented; they are not a proposed daily limit or a statement about any particular platform’s fee booking.
| Component already included | EUR amount |
|---|---|
| Session-opening equity | 20,000 |
| Net result of closed positions | −70 |
| Open-position price P&L at the recorded mark | −106 |
| Open-position entry commission already booked | −4 |
| Current equity | 19,820 |
Keep the valuation time and price convention alongside the number. MetaTrader’s account-field documentation distinguishes balance, equity and margin-related fields. The worksheet must still reconcile the actual service statement, including its own posting and valuation conventions.
Reserve only the debits that are still ahead
From the current mark to an assumed exit fill, the open position would lose another 90 EUR on price. Assume a further exit commission of 3 EUR and estimated financing of 2 EUR, with no other future changes in this variant. The remaining scenario debit is 90+3+2=95 EUR. Projected equity becomes 19,820−95=19,725 EUR.
The distance from current equity to the written floor is 19,820−19,700=120 EUR. Reserving 95 EUR for the open position leaves 25 EUR of uncommitted room under this particular scenario. Do not subtract the existing floating price loss of 106 EUR or the paid entry commission of 4 EUR again: both are already in the current equity. Starting from session-opening equity would require those earlier components, but starting from current equity does not.
A second check reaches the same endpoint: the total session debit is 70+106+4+90+3+2=275 EUR, and 20,000−275=19,725 EUR. If the two routes disagree, resolve the definitions before deciding. This is a scenario calculation, not a promise that closing costs or price losses cannot be larger.
A passed budget test is one recorded decision, not blanket approval
Suppose a proposed addition needs another 35 EUR of future scenario debit. It does not fit the 25 EUR left. Record the reason for rejection against the version of the plan and the account observation used. A different cost estimate or exit assumption needs a new calculation; an attractive entry signal does not supply additional budget.
Passing a loss-budget check also would not establish that margin requirements are satisfied. That requires the instrument specification, account conditions and current margin figures. Nor does it establish that a stop or close request will execute at its assumed price. Keep an explicit status for each check: calculated and passed, calculated and failed, or not calculable because an input is missing. The last status is not a pass.
Save the account timestamp, confirmed quantities, price basis, paid-cost treatment, future-cost estimate, chosen scenario and decision together. When updating the document, retain the old version and its effective time.
After closing, explain the difference instead of replacing the estimate
Suppose the actual remaining price loss is 101 EUR rather than the estimated 90 EUR. The actual exit commission is 4 EUR rather than 3 EUR, and financing is 3 EUR rather than 2 EUR. The actual remaining debit is 101+4+3=108 EUR, so final equity is 19,820−108=19,712 EUR.
The estimate missed by 108−95=13 EUR. Reconcile the difference as 11 EUR of additional price loss, 1 EUR of commission and 1 EUR of financing. The recorded outcome is still 12 EUR above the written floor, but that does not erase the deviation. Keep both the original estimate and actual result; overwriting the estimate would remove the evidence needed to assess it.
One such record does not show that the allowance or execution assumptions are reliable. The detailed template below supplies the wider fields for sizing, correlated exposure, event handling and halts. This introductory ledger shows how to make one of its decisions reproducible.
Three exercises with worked answers
The exercise data are hypothetical. Choose an answer, then check the calculation.
From a reconciled decision to a complete written risk plan
The full template preserves the original diagrams, worked fields, consistency tests and source references. Use it to give each limit a definition, each missing input a status and each version a clear effective time.
1. Why write it down when the rules are already known
The answer "I have rules" rarely survives a request for detail. What percentage per position – "around 1–2%". Measured against what? Against the settled balance or against equity? When do you stop trading for the day – "when I lose too much". How much is "too much", in currency, measured from what? Every one of these gaps is a place where a decision is deferred to the moment when it will have to be made quickly and under load.
Writing it down does not improve the quality of the rule. It does something narrower and verifiable: it moves the moment of decision from the moment of loss to a moment of calm, and it leaves a trace from which you can see whether the rule was actually followed. The function of this document is evidential, not motivational.
Why rules get broken despite being written down, and what happens to a decision taken in the middle of a drawdown, is the subject of the trading psychology section. This article is concerned solely with the content of the record.

Three things an unwritten rule does not have
- A reference point. On Monday the rule reads "risk 1%". On Thursday, after two winning positions, it reads "2% on this one, because the setup is clear". Without a document there is nothing to compare against. The document will not prevent the deviation – it only provides evidence that it was a deviation and not a better reading of the market.
- An execution history. A rule held in memory has no violation counter. A written record lets you count how many times the threshold was crossed and under what circumstances. How such records are kept, their format and their metrics belong to course section 15.
- Testability. "I close when the loss is too big" is not a rule, because you cannot check whether it was followed. "I close when the loss for the day, measured from equity at the session open, reaches 1,200 PLN" – that you can check.
2. The structure of the plan — eleven fields in seven groups
The plan has to be short enough to be read under pressure and unambiguous enough that it cannot be worked around with the sentence "just this once". Once filled in, the fields listed in this article fit on two or three printed pages. The editorial rule is simple: where risk is decided, you enter a number; where the number depends on conditions, you enter the condition under which it changes. The entry "1–2%" is not a rule, only a range to negotiate with yourself.
The plan covers eleven fields arising from the section's decisions; the table below identifies their owners. For daily use, these are then combined into seven operating groups. Group numbers are not lesson numbers: group 1, for example, uses the 9.3 budget and 9.5 volume. This keeps the working document short without losing model assumptions, costs or update rules.
You can scroll the diagram horizontally or open it at full size.
| Plan field | The question it answers | When it is used | Source article |
|---|---|---|---|
| 1. Risk base and risk per position | What quantity do I take the percentage of, and how large is it? | Every position | 9.3, 9.5 |
| 2. Loss limits and the stop threshold | How much may I lose in a day, a week and a month? | Every day | 9.3 |
| 3. Invalidation and defensive exit | Where does the hypothesis stop holding, and how far away is the exit? | Every position | 9.4 |
| 4. Correlated exposure | How large is the risk concentrated on a single currency? | Before every new position | 9.9 |
| 5. Event handling | What do I do before a data release and before a break in quoting? | Before an event and before the weekend | 9.10 |
| 6. Stop and resume | What do I do after crossing the drawdown threshold, and when do I come back? | When a threshold is crossed | 9.8 |
| 7. Plan update mode | When do I recalculate parameters, what forces a recalculation outside the schedule, and from when does the new version of the plan apply? | Periodically and after an event | This article |
One rule does not get a field of its own, because it enters two at once: changing exposure during the life of a position – moving to break-even, trailing the exit and partial closes – is recorded in fields 3 and 5, next to the operations it concerns. Each of these operations changes the distribution of the position's outcomes, so it has to be written down before entry rather than chosen along the way; the direction of those changes and the comparative calculation are given in 9.7.
Eleven decisions the plan must retain
| Field | What you record | Owner |
|---|---|---|
| 1. Meaning of risk | net budget, price-move R₀ and measured DD — separately | 9.1 |
| 2. Survival | allowable loss, streak scenario and barrier | 9.2 |
| 3. Limits | base, measurement time, remaining amount and action | 9.3 |
| 4. Invalidation | price or time condition; trigger side | 9.4 |
| 5. Volume | cost-adjusted result, minimum, step and reverse check | 9.5 |
| 6. Outcome model | net p, RR and E, with assumptions or data source | 9.6 |
| 7. Open position | permitted changes, reading time and remaining loss | 9.7 |
| 8. Drawdown | definition, threshold, halt and resumption | 9.8 |
| 9. Portfolio | signed notional legs and group-scenario limit | 9.9 |
| 10. Events | full stress loss and action before a break | 9.10 |
| 11. Updates | date, change trigger, version and position scope | 9.11 |
Each field's method belongs to one lesson. The daily document may group results, but should retain the budget definition, model assumptions and update condition. Field 6 holds a model result rather than a strategy-testing procedure. Field 11 defines policy applicability rather than the trade-journal format.
3. Field 1: risk base, risk per position and position size
Set the plan’s account currency. Currency code: ___ (for example USD, EUR or PLN). Every blank amount labelled [account currency] uses that code. Express budgets and costs in the same unit before comparing them. If a charge starts in another currency, retain its original amount and the conversion rate, price side and timestamp used. The numerical worked examples keep their expressly stated currencies; use your account’s specification when filling your own plan.
This field is settled first, because every amount in the plan depends on it. The base, however, is not a choice here: for the whole section it was settled in article 9.3 – the base is equity, read before opening the position, and for periodic limits at the opening of the period. So you enter two things: the moment of the reading and the size of the percentage. Why this is not an editorial detail is visible in a counterexample: the same "1%" rule calculated from the settled balance gives, with an unrealised loss open, a higher amount than the same rule calculated from equity, and the difference grows precisely when the account is already strained – which means the less cautious base permits a larger position at exactly the worst moment.
- Risk base: equity – settled for the section, not a matter of choice (9.3). Reading for risk per position: before opening the position; for periodic limits: at the opening of the period. Moment of reading recorded in my plan: ___ (e.g. a fixed time before the session)
- Value of the base today: ___ [account currency]
- Risk per position: ___% of an explicit base, as the full loss budget under the assumed cost scenario. Derive your own value from allowable drawdown and a streak scenario — 9.3. Example values are not recommendations.
- Risk amount R = base × percentage: ___ [account currency]
- Position-sizing model: ___; assumptions and limitations: ___. 9.5 compares fixed amount, fixed percentage, volatility scaling and growth models. If using Kelly, also record uncertainty in the joint p and RR estimate, loss constraints and the fraction of the model result used. The method's name alone does not justify volume.
- Result from 9.5: volume before step ___ lot; after step ___ lot; full scenario loss ___ [account currency]. Nominal V=R₀/(D·w) omits costs. The cost-adjusted variant also includes fixed fee F: V=(R−F)/[((D+S+G)·w)+c+h], where h is per-lot holding cost over the assumed horizon. Add spread and slippage only if absent from the actual-price distance. R must exceed F; after rounding, recheck full loss and minimum volume. This summarises result checks rather than deriving the method again.
- Volume step on my account: ___ lots. I round the result of the formula down and recalculate the risk after rounding
- Minimum exit distance below which I do not open a position: ___ pips
- Maximum volume on a single instrument, regardless of what the formula returns: ___ lots
- Cost components added to intended risk: spread ___ pips, commission ___ [account currency] for both sides (record whether your broker's rate is quoted per round turn or per side), assumed slippage ___ pips, swap points ___ [account currency] per day. Values from your own account specification, not from an advertisement; none of these components is constant over time
State what R includes: P&L at specified execution prices with costs included in the budget. Actual future loss is unknown. It may exceed R if execution, exchange rates or costs fall outside the scenario. Gap mechanics and stress are covered in 9.10.
A worked example, and what does not follow from it
A counterexample to detect before entry. Equity PLN 40,000; total budget 1%, or PLN 400. Long EUR/USD; D=45 pips between midprices, so with a fixed 1-pip spread its quoting cost is absent from D. Illustrative USD/PLN=4.00 gives w=40 PLN/pip/lot. Nominal 400/(45·40) with a 0.01 step gives 0.22 lot and PLN 396 of price movement. Adding spread, assumed 3-pip slippage, round-trip commission USD 7/lot and 3 holding-charge units at PLN 10/lot gives PLN 443.96. This exceeds the PLN 400 total budget by PLN 43.96. It cannot be submitted consistently with the 1% rule.
You can scroll the diagram horizontally or open it at full size.
In this example, costs change the nominal result by PLN 47.96, or 12.11%. This is not a universal markup: commission rates may stay fixed, spread and execution depend on conditions, and holding cost depends on charge schedules and the rate's sign. Three calendar days do not always mean three swap units. Record assumed charge count and scenario period according to service data. The full budget includes that cost, rather than a general declaration of “about 20%”.
The correct result: 0.19 lot rather than 0.22
For the previous section's inputs, per-lot loss is (45+1+3)·40+7·4+30=PLN 2,018. A PLN 400 budget gives 0.1982 lot, or 0.19 after the 0.01 step. Reverse check: 342.00+7.60+22.80+5.32+5.70=PLN 383.42, or 0.95855% of the base. The next step, 0.20, would cost PLN 403.60 and is rejected.
This is the 9.5 result entered into the plan. Updating the conversion rate, fee or charge count requires repeating the test. Recording that cost “roughly fits the markup” is insufficient.
4. Field 2: loss limits and the stop threshold
Risk per position refers to one position. Limits refer to a period. Deriving the thresholds, identifying the base of each of them and settling which takes precedence in a collision belong to 9.3 – here you enter the results and assign one action to each threshold.
- Daily limit: ___% = ___ [account currency]. Base set in advance by 9.3: equity at the open of the trading day. Action once crossed: ___
- Weekly limit: ___% = ___ [account currency]. Base: equity at the open of the week. Action: ___
- Monthly limit: ___% = ___ [account currency]. Base: equity at the open of the month. Action: ___
- Trading stop threshold: ___% = ___ [account currency], measured from the peak of the equity curve – the drawdown definition chosen in 9.8 and not changed during the period. Action: the procedure from field 6
- Margin condition defined separately from DD: equity / required margin ×100% below ___%. Enter the service-consistent definition and action. For covered retail CFDs, KNF uses a condition below half aggregate required initial margin,[3][4] but the agreement may impose earlier restrictions. Writing down a higher percentage does not guarantee reaction time through a gap. Control your loss threshold and margin separately.
- Precedence when thresholds collide: ___ (settled for the section by 9.3: the threshold touched first binds, and touching a higher-order threshold voids the lower ones until it is renewed – enter that, or your own stricter rule)
The boundary of this field: the thresholds describe losses that accumulate. They do not describe a single event in which price jumps several levels at once – then the day's result can pass all four thresholds in one instant and none of them has time to act as a filter. That scenario is calculated in 9.10, not in this document.
Thresholds in currency amounts
For the illustrative PLN 40,000 base, 3/6/10/15% gives PLN 1,200/2,400/4,000/6,000 only if each relevant base has exactly that value that day. Daily, weekly and monthly limits have separate measurement times, while drawdown uses the peak. Here 6% is a specified weekly threshold, rather than the exact compound loss of two 3% days: that is 1−0.97²=5.91%. Threshold derivation belongs to 9.3.
For two full 3% days with no other equity changes, the first limit is PLN 1,200 and the second PLN 1,164. Their PLN 2,364 sum leaves PLN 36 of the PLN 2,400 weekly limit. The third day does not automatically have a full new budget: those PLN 36 also constrain it. Whether any position fits requires minimum volume and full costs. Requiring two full lower periods to fit every higher threshold is optional. A second full 6% week would exceed the 10% month because 1−0.94²=11.64%; the remaining monthly budget then binds.
You can scroll the diagram horizontally or open it at full size.
5. Field 3: the invalidation point and defensive exit rules
Invalidation describes what and when disproves the hypothesis: a price crossing, candle close or elapsed time. The protective order has a separate activation condition and appropriate quote side. An operating buffer is not compulsory in every hypothesis; if used, record reference point and distance. Volume is then calculated from entry price, exit model and budget. The distinction belongs to 9.4; price-structure tools belong to section 5.
- Method for determining the invalidation point: ___ (e.g. an H4 close below the last structural low). The method belongs to 9.4; here you enter the one you chose
- Operational buffer, if used: ___ pips from ___. Quotation side and hypothesis condition: ___. Distance justification and limits of applicability: ___. Count spread once; the buffer does not automatically cover slippage after activation
- Typical distance for my style: ___ pips. Minimum below which I do not enter: ___. Maximum above which the position is too expensive: ___
- Time-based exit: I close the position after ___ if condition ___ is not met
- Move to break-even: activation condition ___; initial R₀ unit ___ [account currency]; costs and exit side handled according to ___. 9.7 shows changes to the outcome distribution. The operation may reduce planned loss on the remaining position, but its effects on win rate and average gain are not identical for every path.
- Trailing exit: activation condition ___, parameter ___, source and reading time ___, update frequency ___, permitted direction of change ___, full-loss limit ___. A volatility-derived parameter may be calculated at entry or updated under a written rule. Both are reproducible when data and measurement time are defined; 9.7 compares the choices.
This plan's rule, with its execution scope. I never move the protective exit farther from entry. I never remove it. I never open a position without an exit. The caveat belongs to the same rule: it governs my actions rather than fill price. In the chosen market-stop variant, the stop-loss order seeks market execution after activation. Price may differ from the order level, so the budget is a scenario rather than a maximum-loss guarantee. Another order type requires separate terms. The rule limits controllable distance and timing, rather than liquidity-dependent execution; 9.10 calculates a gap.
The buffer between the invalidation level and the order has an arithmetic rationale, not an aesthetic one: an order placed exactly at the invalidation level is sometimes triggered by a move that does not yet invalidate the hypothesis. How the level itself and the width of the buffer are determined is described in 9.4. The consequence for the plan is single: you enter the buffer as a number, not as a general principle.
6. Field 4: correlated exposure
Four positions at 1% risk each do not amount to four independent bets. Long positions on EUR/USD, GBP/USD and AUD/USD are three different symbols and one shared exposure: short the dollar. The method for measuring correlation, breaking positions down into component currencies and calculating combined exposure belong to 9.9. In the plan you record the limits that follow from that calculation.
- Maximum number of positions open simultaneously: ___
- Concentration limit for shared directional exposure: ___ [account currency]=___% of a specified base. Record each currency's net notional separately from the group positions' loss scenario. Summed budgets do not become nominal exposure or portfolio standard deviation. The method belongs to 9.9. This article's illustrative group limit is PLN 800; it is not a standard from lesson 9.9.
- Dependence threshold requiring an additional group check: ___; it concerns signed position outcomes, rather than price levels alone. It replaces neither notional limits nor summed loss. Two dependent positions remain two orders, with their own volumes and execution.
- Correlation measurement card: period ___, frequency ___, transformation ___ (returns, rather than price levels), observation count ___, measurement date ___
- Sum of risk amounts if all exits activate simultaneously: ___ [account currency] = ___% of the base
- Scenario after worse execution and exchange-rate changes: ___ [account currency]=___% of the base. Compare it with the remaining budget of every active limit. Record costs already in position risk so they are not added twice.
- Maximum permitted value of the above sum: ___% of the base
Summed losses at all exits form a scenario with specified prices and costs. It requires no ρ=1, assigns no probability, and is not portfolio σ. Exact execution under that scenario produces its stated value; a gap, exchange-rate change or changed cost can exceed it. A stress scenario is not a mathematical maximum loss either.
The arithmetic of the field: from a simple sum to the number you plan against
First, a separate simplified scenario: R₀=PLN 400 means price movement only, and specified markup g=20% is the full additional loss per unit. Four positions give nominal PLN 1,600 and PLN 1,920 after markup; eight give PLN 3,200 and PLN 3,840. This is an educational proportional model, rather than execution data. It is not applied again to the full PLN 400 budget in section 15's cost example, where every position already has a verified PLN 383.42 loss.
At a PLN 40,000 base, the 3% daily limit is PLN 1,200. In this simplified model, four full losses are 133.3% of the limit nominally or 160% after markup; eight are 266.7% or 320%. Maximum simultaneous full losses=floor(1,200/480)=2. This checks parameter consistency rather than inferring dependence merely from simultaneous execution. Full budgets may be summed as a specified scenario, while actual gap loss may be larger. Section 15 calculates costs directly rather than using a multiplier.
Correlations can change under stress, but not every pair must move in the same direction. Position directions and the common factor matter. Supplement quiet-period measurements with a separate stress scenario and notional currency exposure. Without those data, you cannot claim either that diversification disappears or that its earlier effect certainly persists — 9.9.
7. Field 5: event handling
Releases, the weekend break and rollover require a separate execution scenario. Spread, slippage and quote availability may differ from quiet conditions; not every release must raise every cost. Calendars and release interpretation belong to section 6, gap mechanics and loss calculation to 9.10. The plan records only your action.
- Before a top-priority release:
- I do not open new positions for ___ hours beforehand
- I close intraday positions: YES / NO
- I reduce the exposure of longer-term positions by ___%
- Move to break-even if the position is in profit by ≥ ___R – the same unit as in field 3, per 9.7. The operation lowers the intended loss; it does not protect against a gap, because the execution price need not fall at the order level
- Before the weekend break:
- I close intraday positions: ALWAYS / ___
- Positions held through the break: permissible up to ___% of the base in total
- Amount justification: gap loss includes volume × pip value × actual entry-to-exit distance, plus costs and account conversion. Actual distance differs from D by the execution deviation; the order level guarantees no price
- Rollover window: I do not open new positions between ___ and ___. On positions held overnight I treat defensive exits closer than ___ pips as exposed to being triggered by spread widening alone
- Spread regimes on my instruments (my own measurement, not an advertised figure): calm session ___, rollover window ___, release window ___, extreme conditions ___. You take the values from your own measurement or from your own account specification and record them together with the date – there is no default value in this field, because the spread is not a constant of the instrument
- Account parameters can change inside the event window: raising the margin requirement or suspending quotes is provided for in the terms and is applied precisely when volatility rises. A position that met the requirement may stop meeting it. I record this as a parameter, not as a malfunction
An event rule may reduce exposure before a break, but an ordinary protective order does not guarantee closing price. Fully closing before the event removes that position's later-move risk; reduction only reduces the effect's scale. The plan therefore distinguishes closed, partially closed and break-held positions. Times and limits are your scenario parameters; gap calculations belong to 9.10.
You can scroll the diagram horizontally or open it at full size.
8. Field 6: the stop condition and the resume condition

This is the only field of the plan written under conditions in which it will not be used. That is why it has to be laid out step by step, with no room for interpretation, and why the condition for returning has to stand in it alongside the condition for stopping. A rule that interrupts trading without a rule for returning shifts the decision about returning to the worst possible moment. Measuring drawdown by two definitions and constructing the procedure itself are carried out in 9.8.
- Trigger condition: a drawdown of ___% measured from the peak of the equity curve – the same definition and the same base as at the stop threshold in field 2, chosen in 9.8 and not changed during the period – or the margin level below ___% (the value from field 2). Whichever condition occurs first triggers it
- Scope: I close positions, I close the platform, I record in the journal the date, the value of the base, the size of the drawdown and the course of events
- Break duration: ___ sessions from closing the last position. The operating example in 9.8 uses 10 sessions; it is not a normative minimum for every policy. Record the session counter and its start time.
- Pre-return review: compare assumptions, actual execution and plan compliance. No rule breach does not prove parameters remain current. Check exposure size, costs and changes to the outcome model; assess the entry rule itself in section 8. Record the operating decision and reasons in a new plan version.
- Resume condition – stage one, permission to return (all at once, each separately decidable): ___ sessions of break elapsed; the review from the point above completed; ___ trades on a test account executed in accordance with the plan – one deviation resets the counter (9.8); the new version of the plan recorded in the version card from section 14. The test trades run during the break, so this condition can be met without opening positions on a live account; a condition requiring live trading during a no-trading period cannot be met and must not be entered here
- Stage two: return at ___% of standard budget and no more than ___ positions; next-review condition ___; full-share restoration criteria ___. Recovering part of equity can be an operating condition, but does not prove stable parameters have returned. Recalculate the full budget using current base, costs, remaining limits and review findings.
- Repetition: if within ___ sessions of returning the drawdown again exceeds ___% of the stop threshold, I go back to the review
Caveat inside the field: a stopping criterion errs in both directions – it interrupts a streak that was random, and it lets a genuine change in market conditions through. You enter it not because it settles the matter, but because it settles it earlier and verifiably.
Why the return happens at reduced exposure
After drawdown, PLN 400 is 400/34,000=1.176% of the new base, rather than 1% of PLN 40,000. A fixed percentage needs a new amount and, with other inputs unchanged, smaller volume. A further share reduction after resumption is a separate operating decision. DD/(1−DD) gives the return needed to regain the peak, rather than recovery time. Time needs an outcome, stake and barrier model; the mean alone gives no deadline.
9. The checklist and the update mode

The plan has two modes of use. The first is short and daily: a checklist before entering a position, on which you verify risk parameters only. The second is rare and arithmetical: recalculating the plan's parameters at set dates and after events that invalidate them.
The checklist before entering a position
The card has eight items and risk parameters only. It contains no assessment of the entry setup, because that is not its job, and no questions about readiness to trade – those belong to the trading psychology section.
- ☐ 1. Risk base read today: ___ [account currency]. Risk amount per position: ___ [account currency]
- ☐ 2. Invalidation point determined before the volume; distance D = ___ pips
- ☐ 3. Volume from the formula, rounded down to the step; risk recalculated after rounding: ___ [account currency]
- ☐ 4. Daily limit for today: ___ [account currency]. Used so far: ___ [account currency]. Remaining: ___ [account currency]
- ☐ 5. Full loss under the scenario for the group sharing directional exposure after this entry (currency notionals recorded separately): ___ [account currency] = ___% of the base — does it fit the limit in field 4? YES / NO
- ☐ 6. Additional full loss of existing positions from current equity plus proposed-order loss: ___ [account currency]. Does it fit every remaining budget? YES / NO. Count slippage and other costs once, consistently with the model.
- ☐ 7. Margin level after the hypothetical entry: ___% – above my threshold from field 2? YES / NO
- ☐ 8. Any event from field 5 inside the life window of this position (a release, the weekend break, the rollover window)? YES / NO – if YES, the rule from field 5 applies
Caveat on the card: the eight checks say that the position fits inside the limits you wrote down. They do not say the position is good, nor that the loss will not exceed the amount from item 3 – that amount is the intended loss on execution at the order level.
The checklist is a completeness tool here: it contains the data needed to compare a position with the plan. We attribute no percentage effect on results to it, and transfer no medical or aviation procedure effects to individual trading. Its value can be checked more simply — each required field has a value and source, or an explicit “missing” that pauses the decision.
The update mode – parameter, schedule, event
The plan's parameters age at different speeds. Amounts change with every change of the base, correlation thresholds with the market regime, cost assumptions with the account specification. The table below is the content of field 7: for each parameter it gives the moment at which the amount recalculates itself from the definition of its base, the review date for the document, and the event that forces a review outside that schedule. The review dates are an illustrative example, not a norm – you set your own frequency according to the number of trades, the stability of the parameter and the pace of change in your account specification.
| Plan parameter | Moment the amount recalculates / review date (illustrative example) | Event forcing a review outside the schedule |
|---|---|---|
| Risk amount per position (base × percentage) | Recalculates itself before every position – you read the base before opening (field 1); review of the written entry: monthly | A deposit or withdrawal; a change of percentage after the review from field 6 |
| Limit amounts: daily, weekly, monthly | Recalculate themselves at the open of their own period – from the base at the open of the day, week and month (field 2); within the period the amount does not change | A change of percentage after the review from field 6; a deposit or withdrawal – enter your own rule: does it change the base of the current period or only the next one |
| Risk percentage per position | Quarterly | Crossing the stop threshold; a change of trading style |
| Typical distance and defensive exit buffer | Quarterly | A lasting change in the instrument's volatility; a change of instrument |
| Spread regimes and assumed slippage | Quarterly | A change in the account specification; a run of executions worse than assumed |
| Exposure limit per currency and correlation threshold | Monthly | Adding an instrument to the set; a period of violent moves |
| Drawdown threshold and resume condition | Quarterly; the base of the threshold, i.e. the peak of the equity curve, moves only at a new peak | Triggering the procedure from field 6 |
| Regulatory account parameters (leverage, margin close-out threshold) | Every six months | A broker notice about changed conditions; a change in the legal position |
The scope of this list. The list of events is not exhaustive. It covers those that could be anticipated when the plan was written; every event after which it turned out that a rule was missing you add as another row, together with the parameter it concerns.
One principle organises the table: after a losing streak, the percentage need not change while amounts are recalculated, each at its own base-reading time. Position risk changes at the next entry because the base is read before opening; period-limit amounts change at the start of the next day, week and month, while current-period opening amounts remain valid until then. The halt threshold stays at the previous peak until a new one forms. Changing a percentage is a separate review decision in field 6, rather than a routine update. Records supplying these inputs, their format and metrics belong to course section 15.
Reserve budget for positions already open
A separate account-state example: remaining daily budget PLN 600, weekly PLN 900 and drawdown-threshold capacity PLN 750. The daily limit binds. If remaining scenario loss on existing positions, measured from current equity, is PLN 420, only PLN 180 remains for a new commitment. A proposed PLN 200 full loss does not fit even if its own percentage satisfies the trade limit.
Do not add entry-to-current loss already reducing equity and remaining budgets to PLN 420. The required quantity is additional loss from the current state to the exit scenario. If a tool uses another definition, convert its figures before entering the card.
10. Collisions between fields – which threshold binds first
Check all seven groups together. The following six comparisons use a separate simplified set: base PLN 40,000, nominal R₀=PLN 400 and proportional g=20%, giving full loss PLN 480 per position. 3/6/10/15% thresholds have their own bases and clocks. R in this section's formulas means pre-markup R₀. Section 15 uses a full budget with costs calculated directly, so adds no further 20%.
Risk per position against the daily limit. Risk is recorded per position, the limit per day, and nothing links them apart from a calculation the plan usually does not contain. The number of positions that can stand open simultaneously without exceeding the daily limit is n = Ld / (R × (1 + g)), where Ld is the daily limit in the account currency and g is the assumed execution overhead. Substituting: 1,200 / (400 × 1.20) = 2.5, rounded down two positions. At 0.5% risk per position the same calculation gives 1,200 / (200 × 1.20) = 5. The precedence rule: the daily limit binds, because it is a higher-order threshold and crossing it voids further trading; risk per position is not permission to open another position.
After section 4's two full days, PLN 36 remains in the weekly budget. This does not authorise a full new daily limit, but does not by definition ban every position either: compare full loss and minimum volume with those PLN 36. The weekly counter is independent; a new day does not erase used weekly loss.
The monthly limit against the stop threshold. This pair collides differently from the previous ones, because the two numbers have different bases: the monthly limit is calculated from capital at the open of the month, the stop threshold from the peak of the equity curve. The first month begins at the peak of 40,000 PLN, so the monthly limit of 4,000 PLN binds earlier than the stop threshold of 6,000 PLN and closes the month at capital of 36,000 PLN. The second month starts from a base of 36,000 PLN and its limit is now 36,000 × 0.10 = 3,600 PLN, i.e. a floor of 32,400 PLN. The peak, however, has not moved, so the stop threshold still lies at 34,000 PLN – which means it breaks after a loss of 36,000 − 34,000 = 2,000 PLN, i.e. after using 2,000 / 3,600 = 55.6% of the second month's limit. A check from the other side: two months at the full limit are 1 − 0.902 = 19% of drawdown, while the stop threshold stands at 15%. The rule: precedence between a threshold calculated from a period and a threshold calculated from the peak cannot be established once and for all, because it depends on how far from the peak the period begins. The only fixed rule reads: you check both counters before every position, not at the end of the period.
Group limit versus maximum position count. This section's separate model has nominal R₀=PLN 400 and 20% markup, giving full loss PLN 480 per position. If directions and composition define one group with a PLN 800 full budget, floor(800/480)=1 position fits; two need PLN 960. The PLN 1,200 daily limit permits two, but this group's smaller result — one — binds. Nominal 800/400=2 omits costs and does not check the full limit. PLN 800 and this group threshold are not standards copied from 9.9. Currency notionals and dependence need their own calculations; the scenario budget does not replace them.
Event handling versus an open position. The rule must also cover existing exposure. Consider a separate nominal 0.22→0.11 lot example with D=45 pips and w=40 PLN/pip/lot. Remaining price-move loss falls from PLN 396 to PLN 198. With fixed 1-pip spread and USD 3.50/lot/side commission, USD/PLN=4.00, no order fee or minimum commission, splitting the exit does not increase total turnover. Spread: entry PLN 4.40 plus two exits of PLN 2.20 gives PLN 8.80. Commission: 3.08+1.54+1.54=PLN 6.16. These two costs have zero increment in this model. Worse spread, a fixed charge, other slippage or a holding schedule may change the conclusion. Reopening 0.11 lot creates additional turnover: 4.40+3.08=PLN 7.48 before other costs. The closed part also misses later movement; partial exit need not always raise win rate and lower average reward-to-risk — 9.7 compares common paths. This example does not justify 0.22 lot under the full PLN 400 budget: its correct volume is 0.19.
Post-resumption exposure versus position count. In the simplified model after equity falls to PLN 34,000, nominal R₀=PLN 340, full loss PLN 408 and new daily limit PLN 1,020. Two positions use PLN 816, or 80% of the limit. At half the stake, full loss is PLN 204 and five positions use the entire PLN 1,020. This is 25% greater usage than PLN 816 and 6.25% more than two positions' PLN 960 before the base fell. The increase occurs here because position count also rises; volume reduction alone does not require it. Limit both parameters if resumption is intended to reduce total exposure.
| Colliding fields | Which binds first | Calculation on the illustrative set | What to enter in the plan |
|---|---|---|---|
| Risk per position (1) ↔ daily limit (2) | The daily limit, unless the execution overhead changes | 1,200 / (400 × 1.20) = 2.5 → 2 positions | A maximum number of simultaneous positions as a number, not as "common sense" |
| Daily ↔ weekly limit (2) | Whichever counter is exhausted first | PLN 1,200+1,164=2,364; after two full days, PLN 36 remains in the week | A sentence stating that exhausting the daily limit does not reset the weekly one |
| Monthly limit ↔ stop threshold (2) | Depends on the distance from the peak – cannot be settled in advance | Month 2: the threshold breaks after 2,000 of 3,600 PLN, i.e. after 55.6% of the limit | An obligation to check both counters before a position |
| Position-count limit ↔ concentrated risk (4) | Concentrated risk – the position-count limit is coarser | floor(800/480)=1 position in this group; two would need PLN 960 | Both limits separately; the number of positions does not replace the calculation |
| Event handling (5) ↔ open position (1, 3) | Field 5, if it explicitly covers open positions | 0.22 → 0.11 lots; risk 396 → 198 PLN; incremental turnover cost 0.00 PLN | The scope of field 5 extended to already-open positions |
| Exposure after returning (6) ↔ daily limit (2) | The daily limit – and it lets more through, not less | 2 × 408 = 816 PLN against 5 × 204 = 1,020 PLN, i.e. 80% → 100% of the daily limit | A smaller volume and a frozen number of positions |
The table holds for this set. The column "which binds first" describes the illustrative set from this section, not a general property of these pairs. With a different execution overhead, a different exit distance or a different ratio between thresholds, the order can reverse – which is why the output of this section is not a list of precedences to copy, but six calculations to perform on your own numbers.
Two valid orders can jointly breach the plan
Assume PLN 300 of free budget. Two prepared positions each need PLN 200 and pass individually. If both are evaluated against the same unreduced state, together they reserve PLN 400 — PLN 100 too much. After accepting the first, only PLN 100 remains, so the second requires a new reading or rejection.
State when budget becomes committed: by a pending order or only by an open position. If two orders can fill simultaneously, the limit must not assume only one entry unless the service guarantees that condition.
11. Six consistency tests on your own plan
Tests check field consistency rather than universally correct values. A monthly limit smaller than two full weeks can be coherent: the remaining month simply limits the next week. If the plan also aims to survive two full periods, check that goal separately. All following figures are illustrative and do not replace personal thresholds.
Test 1 – the cascade of limits
Goal “two full days fit the week”: 1−0.97²=5.91% versus 6% — satisfied without other changes. Goal “two full weeks fit the month”: 1−0.94²=11.64% versus 10% — not satisfied. This does not make the plan contradictory; the month may trigger action before the second full week. Record both rules and compare remaining amounts. Goal setting and threshold derivation belong to 9.3.
Test 2 – the day's budget against the number of positions
nmax = Ld / (R × (1 + g)), rounded down. Substitution: 1,200 / (400 × 1.20) = 2.5 → 2. Criterion: nmax must be no smaller than the maximum simultaneous position count declared in field 4. If the plan requires four positions with full loss of PLN 480 each while the day permits two, that requirement is infeasible — and the problem becomes practical when the market moves in one direction. On failure, reduce the position count to the calculated result or lower risk per position. Raising the daily limit also closes the test, but requires recalculating the weekly limit to avoid breaking test 1.
Test 3 – concentration on a single currency
ngroup=floor(group full-loss limit / [R₀×(1+g)]). Here floor(800/480)=1, while the day permits two. Apply the smaller remaining amount and count constraint; one binds for this group. One test's higher permitted result is not itself contradictory — another can restrict it. If the plan requires two such positions, reduce full loss or count; changing the group budget needs justification and checks against other limits. In section 15's model, full loss PLN 383.42 allows two within PLN 800; no 20% markup is added again.
Test 4 – volume feasibility
Compare the 9.5 result with minimum volume after full costs and step size. Here per-lot loss is PLN 2,018: a PLN 400 budget gives 0.19 lot and PLN 383.42 after the step. At minimum 0.01 and share 1%, equity needed to cover minimum volume is PLN 2,018, with no extra fixed fee. Nominal PLN 1,800 excludes costs and does not satisfy the full budget. Below the correct boundary, the result is “no compliant order”.
Test 5 – your threshold against the imposed one
Check current service margin conditions and your own threshold rather than comparing 15% DD with universal “stop-out DD=50%”. For a particular scenario, compute projected equity and required margin after loss, then margin level. If personal action triggers sooner, it remains under the plan in that scenario. Requirements, exchange rates, flows and contractual terms can change the order. KNF point 1b describes the parameter,[3] rather than a guaranteed barrier for every service.
Test 6 – attainability of the resume condition
With a target of 20 compliant test trades and two per session, 20/2=10 sessions is time under a uniformly satisfied assumption, rather than a guaranteed minimum or return date. No signals extend the wait. If at least 10 break sessions are also required, both conditions and the review must be satisfied. Do not remove the review merely because another counter generally takes longer: their functions differ. Tests are not performed through live trading during a prohibition.
- ☐ 1. Goal of surviving two full periods, if adopted: ___% versus ___%; remaining budgets constrain every new order
- ☐ 2. Day's budget: ___ / (___ × 1.__) = ___ positions · field 4 declares ___ · consistent: YES / NO
- ☐ 3. Group: full remaining budget ___ / full position loss ___ = ___ positions · joint maximum after all constraints: ___
- ☐ 4. Full loss at minimum volume ___ [account currency] versus my budget ___ [account currency]; stepped result ___ lot; my feasibility threshold ___ [account currency]
- ☐ 5. Scenario margin level ___% versus contractual ___% and personal ___% thresholds; action ___
- ☐ 6. Resumption: ___ test trades / ___ per day = ___ sessions · binding condition: time-based / trade-based
Caveat on the card: six passed tests say only that the plan's parameters do not exclude one another. They do not say the parameters are cautious, nor that they follow from a calculation – an internally consistent set can at the same time be too aggressive, if the risk percentage itself was adopted without being derived from an acceptable drawdown and a losing-streak length (9.3). The tests check consistency, not correctness.
A deposit does not recover a loss, and midnight does not end a halt
After a PLN 600 daily loss, a PLN 1,000 deposit raises equity but is not trading profit. The plan must specify how the flow changes base and remaining limit without erasing used loss. Otherwise the deposit may appear to replenish the budget. 9.8 separates cash flows and results.
The same conflict occurs at the day change. A new daily limit does not disable a weekly block or drawdown halt. State time zone, period-change moment and still-active conditions. If the current state cannot be determined, a new date alone does not authorise entry.
12. The plan on a small account – the feasibility threshold of every parameter
The same percentage rule behaves differently on PLN 2,000 and PLN 40,000 accounts; this concerns feasibility rather than proportions. With small equity, three plan parameters successively become infeasible, each with a calculable threshold. The following three calculations use the article's inputs: exit distance 45 pips, pip value PLN 40 per lot, 0.01 step and minimum, and per-lot cost (45+1+3)×40+28+30=PLN 2,018. No separate 1.20 multiplier is used. Minimum and step are account-specification parameters, rather than market constants — obtain yours from account documents. Pip, lot and margin mechanics belong to section 2, the full volume chain to 9.5. Here they are inputs; we calculate relationships between plan fields: which parameter becomes infeasible at which equity.
Threshold one: the volume from the formula falls below the minimum
In this scenario, minimum 0.01 lot needs a full PLN 20.18 loss budget. At 1%, that requires equity of at least PLN 2,018; price movement alone would need PLN 1,800. Use the boundary matching the recorded R definition. Derivation, fixed fees, minimum and step effects belong to 9.5. Raising the percentage just to open minimum volume changes policy rather than correcting rounding.
Threshold two: rounding eats the precision
The nominal example excluding costs illustrates granularity: at PLN 40,000 and R₀=PLN 400, 0.2222 rounds to 0.22 and price-move risk to PLN 396. At PLN 2,000 and R₀=PLN 20, 0.0111 rounds to 0.01 and PLN 18. But the minimum's full cost scenario is PLN 20.18, so it already fails a total 1% budget of PLN 2,000. These definitions cannot be combined into a positive feasibility verdict.
A nominal 0.01-lot step at D=45 and w=40 gives PLN 18 of price movement. The full step in this cost example is PLN 20.18. At a PLN 2,000 base, minimum volume costs 1.009%, exceeding the full 1% limit; the next step would cost 2.018%. Rounding the written percentage is insufficient. The card holds full amount and volume; percentage checks budget consistency. Granularity also depends on cost components and instrument minimum.
Threshold three: the daily limit smaller than the risk of a single position
The minimum's full loss is PLN 20.18. An initial 3% daily limit covers it from equity 20.18/0.03=PLN 672.67. But the 1% position limit needs PLN 2,018, so it binds sooner. The earlier PLN 720 would concern a separate 20% markup on nominal PLN 18. Use one cost model to evaluate an order; do not transfer results between models. During the day, use remaining budget rather than initial budget alone.
What a small account does not have: an imposed threshold that binds before your own
With constant required margin M, no flows and no earlier service thresholds, equity<0.5M may occur only after substantial loss. If initial M≤equity≤peak H, then 0.5M≤0.5H. This is a conditional inequality, rather than a promise that “every DD threshold below 50% acts first” on a real account. Alongside worse execution, M changes, flows and other agreement terms can occur. Control equity/M separately.
For illustrative EUR/USD minimum 0.01 lot, notional is EUR 1,000. At EUR/PLN=4.28 and an exactly specified 30:1 ratio, model margin=4,280/30=PLN 142.67. The literal regulatory minimum of 3.33% gives PLN 142.52, a different exact fraction. At PLN 2,000 equity, model margin level is about 1,402%; at PLN 1,700, about 1,192%. These are calculations for one illustration, rather than comparisons of “distance” to a guaranteed threshold. Margin compliance alone does not admit the position: full minimum loss PLN 20.18 exceeds 1% of PLN 2,000.
Recalculate margin conditions after changes in notional, exchange rates or requirements. Include flows and contractual thresholds too: relevant events extend beyond rate increases and currency movements. The KNF parameter does not establish one service's reading method or closing order. Your action condition must specify measurement time and response even when present equity is far from the threshold.
| Equity (PLN) | Total 1% limit | Volume consistent with costs and step | Full scenario loss | Conclusion |
| 2000 | 20 PLN | below minimum | PLN 20.18 at 0.01 | Does not fit the 1% limit |
| 2018 | PLN 20.18 | 0.01 lots | PLN 20.18 (1%) | This scenario's boundary |
| 1500 | 15 PLN | below the minimum | — | No compliant order |
| 700 | 7 PLN | below the minimum | — | The position limit binds; the PLN 21 daily limit alone is insufficient to permit entry |
Inputs behind these thresholds. The table uses D=45 pips, w=40 PLN/pip/lot, minimum and step 0.01, and the stated costs. Changed data require recalculation; a changed step alone need not change minimum. D=90 with other components unchanged gives PLN 3,818/lot and a PLN 3,818 equity threshold at 1%, rather than PLN 2,018. This is not double because some costs do not rise with D. These are model boundaries, insufficient alone for a trading decision. 9.5 rechecks volume, margin and remaining limits.
13. When the plan and the records diverge
The plan as written and the plan as executed are two different things, and the difference is visible only in the records. Three divergences occur regularly enough that it is worth having a numerical condition and a separate remedy for each – because they hit three different fields, and confusing them leads to changing a parameter that happened to be working correctly. The format of the records, their metrics and how they are kept belong to course section 15; here the concern is solely what the reading implies for the plan.
Divergence one: realised risk higher than intended
Separate changed costs, worse execution and rule changes in the records. The median of full loss divided by nominal R₀ may show a typical difference but measures neither tail nor stress loss. Illustratively, 1.35 at R₀=PLN 400 means full loss PLN 540. This is 35% larger than R₀, while R₀ is 25.93% smaller than full loss. The ratio alone does not establish that all the difference is slippage. Do not add costs again if the denominator already was full budget R.
Correct the identified cause rather than automatically treating every difference as slippage. Update the appropriate cost component and recalculate volume and scenarios. In a separate simplified model with R₀=PLN 400 and multiplier 1.35, a PLN 1,200 limit fits two positions because 1,200/540=2.22. At R₀=PLN 200, it fits four rather than five because 1,200/270=4.44. This checks a new assumption's effect rather than estimating worst execution.
Divergence two: a drawdown deeper than the parameters explain
A deep drawdown can trigger a budget threshold even when the model allows that path. It does not automatically prove failure. The 9.8 review separates compliance, current costs and possible distribution changes. It records actions and resumption conditions; strategy assessment requires section 8's procedure.
150 and 300 can be reproduced as missing PLN 6,000 divided by model mean gain of PLN 40 or PLN 20 with fixed stakes. They are not expected first-return times. With fixed percentage and independent unchanged outcomes, mean equity satisfies E[Cₙ]=C₀(1+rE[X])ⁿ. Starting at PLN 34,000, E[X]=0.10 and r=1%, mean equity reaches PLN 40,000 after ln(1/0.85)/ln(1.001)=162.60, or at least 163 whole trades. At r=0.5%, it takes 325.12, or 326 whole trades. This is the horizon of mean equity, rather than a real rebound deadline or median barrier-hitting time. 9.2 separates barriers and horizons.[1] The required 17.65% return is a separate 9.2 calculation.
Divergence three: the daily limit never bound once
Zero recorded breaches do not prove rule quality. Two simultaneous positions with nominal PLN 400 and illustrative 1.20 multiplier give a PLN 960 scenario versus a PLN 1,200 limit. That scenario does not reach the threshold, but later positions, earlier loss, a gap or out-of-model execution can. Do not call PLN 960 the day's maximum loss. A limit can be an intentional reserve; it need not trigger regularly to be useful.
The remedy is a choice, not an obvious step. You can lower the daily limit to the level at which it begins to bind – with these parameters to 960 PLN, i.e. 2.4% of the base – and then it recovers its function as a threshold for the day, but the cascade has to be recalculated, because test 1 then gives 2,400 / 960 = 2.5 and remains passed. You can also leave the limit unchanged and state outright that it is a reserve for a day with a streak rather than an everyday rule. What you must not do is leave it undescribed and count a zero violation counter as a result.
One missing input should produce an explicit decision
The card records a PLN 400 budget and 0.19-lot volume, but omits conversion rate, holding-charge count and whether D includes spread. The result is not yet reproducible. The plan requires no guessing: a missing budget-relevant input pauses submission until verified.
This also applies to inconsistent reading times. Hour-old equity, a current price and costs from before a specification change do not automatically form one current card. The reading time is part of the data rather than decorative information.
14. Versioning the plan – what to record with every change
The table from field 7 says when you recalculate parameters. It does not say what remains after the recalculation – and without that record, results from the period before the change and after it look comparable when they are not. The version card closes that gap and is not an eighth field of the plan: it is a record of what field 7 produces, just as the checklist is a record of what fields one to six require.
R compares outcomes with each trade's initial risk, even when amounts differ. It does not create one common PLN multiplier. At fixed R₀=PLN 400, +5R means +PLN 2,000; at fixed R₀=PLN 170, +5R means +PLN 850. Combined, this is +10R and +PLN 2,850, rather than +10 times an arbitrarily chosen amount. If R changes across trades, monetary P&L is ΣxᵢR₀ᵢ. Versions identify cost or policy changes rather than making outcomes automatically incomparable.
The second settlement concerns positions open at the moment of the change and is recorded as the field 7 entry in the table in section 2 – which keeps the version card purely a record rather than a source of a new rule. The new version applies to positions opened after it takes effect; positions already open are settled under the version they were created under. Otherwise the intended risk of such a position would change after the fact, and the calculation that justified its volume would stop holding mid-flight – the same mechanism by which moving the defensive exit invalidates the position-size calculation (9.4). The exception is a change forced by field 5 or field 6: the stop procedure and the event rule act on everything that is open, because that is what they exist for.
- Version number: ___ · day it takes effect: ___ · plan field: ___
- Parameter changed: ___ · value before: ___ · value after: ___
- Base on the day of the change: ___ [account currency] · risk amount before: ___ [account currency] · after: ___ [account currency]
- Reason for the change (tick one): review date from field 7 / forcing event from field 7 / result of the review from field 6 / change in account conditions
- Parameters recalculated with this change: ___. Each amount has its own base and reset time; an equity change does not automatically refresh every limit.
- Consistency tests repeated after the change: 1 ☐ 2 ☐ 3 ☐ 4 ☐ 5 ☐ 6 ☐ · result: ___
- Positions open at the moment of the change: ___ – settled under version ___
A version card separates policy, data and execution changes. Report comparisons in both PLN and each trade's individual initial R₀; do not divide every old trade by the current amount without explicitly labelling that new normalisation. A recorded version does not prove the change was necessary or beneficial.
Frequent changes make fixed-policy periods harder to compare, but a two-week interval alone does not prove the plan wrong. A specification change may require an immediate update. Distinguish updated data from changed decisions, and record cause and open-position effects. This permits later assessment rather than judging solely by version count.
What a new version changes for an open position
A new 0.5% share does not retroactively change initial R₀ of a position opened at 1%. Its history remains measured against the original unit. Meanwhile, a shared account limit and halt procedure can apply to it immediately. Define both scopes: the entry-calculation version and current action rules for all exposure.
After a forced specification change, check current feasibility first, even if the periodic review is a month away. A new version records its effective date and cause; an ordinary equity refresh does not imply that the entire policy has changed.
15. A full example – one set of numbers through seven fields
All the calculations in this article have so far stood separately. Below is one set carried through the seven fields in order, showing how each field constrains the next, and with the six consistency tests at the end. This is not a model to copy – the values are illustrative, and they pass the tests because they were chosen to; yours will come out of your capital, your exit distance and your own cost measurements. The value of the example lies elsewhere: in showing that the fields are not independent and that filling them in one after another without looking back gives a contradictory set.
Field 1 – base and risk
Equity PLN 40,000; full scenario-loss budget R=PLN 400. Fixed-percentage model, minimum and step 0.01 lot, nominal instrument cap 0.50 lot. Illustrative inputs: 1-pip spread absent from D, round-trip commission USD 7/lot at USD/PLN=4.00, 3-pip slippage and holding cost PLN 30/lot for the specified schedule. These are exercise assumptions rather than live-account readings. Add no further 1.20 multiplier to R because full costs already belong to the budget. Additional stress is a separate scenario that may require volume reduction.
Field 3 – invalidation, and only from it the volume
The illustrative invalidation point is 40 pips from entry on the midpoint; a 5-pip buffer gives D=45. With costs, per-lot loss is PLN 2,018. The 9.5 result is 400/2,018=0.1982 lot, stepped to 0.19. Full loss is PLN 383.42, or 0.95855% of the base, while nominal price movement is PLN 342. 0.20 lot would give PLN 403.60 and exceed the limit. Here price-move R₀ is PLN 342; position-change triggers use that unit with defined costs — 9.7.
Field 2 – the limits that will constrain field 4
Illustrative 3/6/10/15% thresholds give PLN 1,200/2,400/4,000/6,000 from the stated bases: start of day, week, month and peak. A personal 150% margin-level threshold is a separate decision, without guaranteed precedence through a gap or requirement change. Before entry, check every remaining budget and contractual condition; a higher-period block does not disappear with a new day — 9.3.[2]
Field 4 – the place where field 2 cuts the declaration down
Four positions were initially declared. The daily limit fits three full losses of PLN 383.42, but the PLN 800 shared-group limit fits two. Reduce the declaration to two; their full scenario is PLN 766.84. PLN 800 is also an illustration parameter. Defined directions and composition determine the group; its budget is not nominal currency exposure. Used daily loss may allow fewer positions. Additional dependence measurement requires actual data or an explicitly synthetic 9.9 model — 90 sessions are not presented as an analysis actually performed.
After two compliant positions, planned full loss is PLN 766.84, or 1.9171% of the initial base. With an unused PLN 1,200 daily limit, PLN 433.16 remains. This sums planned losses; it is neither sigma nor a guaranteed amount. Before another decision, read used budget and remaining-exposure loss from current equity; do not recount an entry-to-current decline already in equity. R=PLN 400 is the limit; PLN 383.42 is the verified stepped result.
Field 5 – the events that change the two previous numbers
Illustrative event rule: no new positions four hours before the selected event, day positions closed, retained exposure reduced. At 0.19 lot and a 0.01 step, closing exactly half is impossible: close 0.10 and leave 0.09 lot after rechecking minimum and costs. Record the break condition and clock separately. For this example only, assume a server fixed at UTC+02:00 and a service break from 15 January 2026 at 23:00 to 16 January at 00:30 on that server: 15 January 2026, 21:00–22:30 UTC. This is a stipulated service window; an actual product’s dates and clock come from its specification. Before the weekend, limit the full stress scenario rather than nominal R₀ alone.
Field 6 – the stop and what applies after the return
Illustrative halt: 15% peak-based drawdown or a personal 150% margin-level threshold, reacting to the first condition met. At least 10 break sessions, review, 20 compliant test trades and a new plan version are explicit operating parameters. Fewer than two tests per session extend collection time. Resumption at 0.5% with no more than two positions needs a new cost calculation. PLN 37,000, recovering half the original loss, triggers another review rather than restoring full share automatically. Resumption depends on the complete procedure and current budgets — 9.8.
Field 7 – dates and the version card
The review dates and the events forcing a recalculation come straight from the table in section 9. Added to that is the version card from section 14, filled in with every parameter change – including the change that has just occurred in field 4, because lowering the number of positions from four to two is a parameter change and has its own row.
| Test | Calculation on this set | Result | What follows from it |
|---|---|---|---|
| 1. Cascade | 5.91% versus 6%; 11.64% versus 10% | The first two-period goal is met; the second is not | The monthly limit may constrain the second week; the plan remains consistent |
| 2. Day's budget | floor(1,200/383.42)=3 | Three such full losses fit within an unused daily limit | The daily limit alone rejects four; the group limit permits two |
| 3. Shared-group budget | floor(800/383.42)=2 | Two positions in this scenario | The group binds before the day; calculate nominal legs separately |
| 4. Volume | 400/2,018 → 0.19; full loss PLN 383.42 | Passed | Minimum 0.01 needs PLN 2,018 equity at a 1% share |
| 5. Margin | scenario level versus personal and contractual thresholds | Requires current M and equity | DD15% does not prove margin compliance for every service |
| 6. Resumption | 20/2 = 10 sessions at exactly two test trades per session | The two conditions may be completed on the same day | Less frequent test trades extend the period; a review and current limits are also required |
Changing distance to 90 pips with costs unchanged gives per-lot loss (90+1+3)·40+28+30=PLN 3,818. A PLN 400 budget gives 0.10477 lot, stepped to 0.10 with full loss PLN 381.80. Minimum volume needs PLN 3,818 equity at 1%. This is not exactly twice PLN 2,018 because some costs do not increase with D. The nominal conclusion “always half the volume and twice the threshold” requires omitting those costs. Check every active constraint after changing inputs.
Four originally declared positions would need 4×383.42=PLN 1,533.68, above the unused PLN 1,200 daily limit. The day permits three, but the PLN 800 group only two. Joint checks therefore allow at most two compliant positions. The plan takes two passes: gather inputs, then check consistency. Correct calculations for individual positions do not determine the whole account.
16. Self-check exercise
The test for this article has two parts. The first is a demonstration on illustrative data – different from the data used in the text – with a model solution for self-checking. The second is the real test of this article: the same steps on your own numbers, with no ready-made parameters and no model solution.
Risk base: equity at session opening, PLN 25,000. Position risk: 0.8% of the base. Daily limit: 2.5%. Weekly limit: 5%. Halt threshold: 10% from the equity-path peak. Assumed execution markup: 20%, specified here as a full entry-to-fill distance 20% greater than D, rather than a measured average. Sections 6 and 10 use a separate currency simplification, R₀×1.20. Section 15 calculates cost components without that multiplier. In this exercise, PLN 200 is nominal price movement and PLN 240 full loss under the markup. All values are illustrative.
- Fill in fields 1 and 2 of the plan with amounts: risk amount per position, daily limit, weekly limit, stop threshold.
- Three positions at 0.8% risk each are open simultaneously. Calculate the sum of risk amounts if all three exits trigger at once, and the same sum increased by the execution overhead. Express both as percentages of the base.
- Determine whether the second of those figures fits inside the daily limit, and calculate how many positions carrying the same risk fit inside the daily limit at the adopted overhead.
- After a losing streak the base falls by 10%. Identify which amounts change and at which moment each of them does – before the next entry, at the open of the period, or at a new peak – recalculate them, and explain why the percentages do not need changing at the same moment.
1. Amounts. Risk amount per position R = 25,000 × 0.008 = 200 PLN. Daily limit = 25,000 × 0.025 = 625 PLN. Weekly limit = 25,000 × 0.05 = 1,250 PLN. Stop threshold = 25,000 × 0.10 = 2,500 PLN, measured from the peak of the equity curve – with the base equal to the peak both figures are the same today, but after the first profit they will stop being so.
2. Three positions at once. Sum of risk amounts: 3 × 200 = 600 PLN, i.e. 600 / 25,000 = 2.4% of the base. This is the sum of nominal losses in the specified all-exits scenario, irrespective of correlation. It is neither σ nor a probability estimate. With execution overhead: 600 × 1.20 = 720 PLN, i.e. 2.88% of the base. That second figure is the basis for planning – and it too is not the worst case, because in a gap the execution price has no upper bound arising from this calculation.
3. Collision with the daily limit. 720 PLN > 625 PLN, so three exits triggering at once exceed the daily limit by 95 PLN – the parameter set is internally contradictory. The number of positions fitting inside the limit: 625 / (200 × 1.20) = 625 / 240 = 2.60, i.e. rounded down two positions. Check: two positions are 480 PLN with overhead (1.92% of the base) and fit inside the limit; three do not. The conclusion for field 4 of the plan: at these thresholds the maximum number of these positions in the full-exit scenario is two – or else risk per position has to be lowered, or the daily limit raised and the weekly limit recalculated along with it.
After a 10% loss, equity is PLN 22,500. A 0.8% share would be PLN 180 before another permitted entry; today, however, the PLN 2,500 halt threshold from the PLN 25,000 peak has been reached, so ordinary new entry is blocked. With unchanged equity, the next day would have a PLN 562.50 limit and next week PLN 1,125; calendar resets do not disable the halt procedure. Exercise percentages are specified rather than derived from an unstated streak length. Review justifies any change; recalculating amounts alone does not.
Solution check: 0.8% of PLN 25,000 is PLN 200; three full losses under multiplier 1.20 give PLN 720, above the PLN 625 day. After equity falls, period limits change at their own measurement times, while the peak threshold remains PLN 2,500. This checks neither sigma nor “correlated risk”. Monetary and decision consistency matters more than uniform base decline alone.
Repeat steps 1–4 on your own data and enter the results into the plan: base ___ [account currency] (moment of reading: ___), risk per position ___% = ___ [account currency], daily limit ___% = ___ [account currency], weekly ___% = ___ [account currency], stop threshold ___% from the peak = ___ [account currency], execution overhead ___ – from your own measurement or as an openly adopted margin. Then calculate how many positions at your risk fit inside your daily limit at your overhead, and compare the result with the number declared in field 4; next to every amount, note the moment at which it recalculates itself: before an entry, at the open of the period, or at a new peak. Finally, identify one parameter that a losing streak does not change automatically, and record what result of the review from field 6 would be grounds for changing it. This part has no model solution by construction – the correctness check is the consistency tests from section 11 performed on the numbers you entered.
17. Closing the section – what comes next
The articles in this section supply definitions, models and results for the plan’s eleven fields. This article connects them operationally: it reveals conflicts between limits, costs, measurement times and versions. That is a separate function of the document. Correct individual calculations can produce an inconsistent set when each uses a different budget or counts a cost again.
A completed plan has a number or change condition in each of seven fields. This is enough to avoid making decisions already settled in this section at the moment of loss. It does not do two things: determine whether your rules have positive expectancy, or ensure that a written rule is executed.
What comes next — course section 10
The first gap belongs to section 8, the second to section 10. The difference between a written rule and an executed rule is a separate subject that a document cannot settle. Section 10 begins where this article ends: what happens at 16:30 on Friday after two losses, with a legible plan lying on the desk.
FAQ – Frequently asked questions
How many fields should the plan cover?
What should I check before placing an order?
Does 1% always mean the entire possible loss?
When should amounts and versions be updated?
Does a new day permit a return after a halt?
Does my threshold replace margin conditions?
Sources and references
- Plan calculations: explicit educational scenarios, without live-account data. Per-lot full cost loss PLN 2,018, checks of 0.19 and 0.20 lot, and reduction step are given in the text.
- Method ownership: 9.5 — volume, 9.3 — budgets and 9.8 — halt and resumption. This article attributes no statistical performance effect to the checklist.
- KNF, decision DAS.456.2.2019, points 1–7 and 15; announced 1 August, effective from 2 August 2019. Normative terms checked on 5 October 2026. Service parameters require separately reading the agreement.
- KNF, product interventions. Scope covers activity in Poland, including from another country; read on 5 October 2026. Historical gap calculation belongs to 9.10.