Value at Risk (VaR)
Specify the model
State the horizon, confidence level, portfolio, data window and estimation method. Changes in volatility, dependence and liquidity can make historical estimates misleading. Backtest exceedances without treating their expected frequency as a guarantee for any short sequence.
Beyond the threshold
Expected shortfall describes an average in the loss tail under its stated convention; stress tests examine specified scenarios. These answer different questions from VaR. None removes uncertainty about events outside the model.
Confidence and repeated observations
A 95% model quantile does not imply exactly five exceedances in every block of 100 days. Sampling variation, dependence and model error matter. A continuous normal-loss model would use a different quantile for 99%; changing confidence is a change of question, not a guarantee of complete tail coverage.
FAQ
Is VaR the largest possible loss?
No. It is a modelled quantile. Losses beyond the threshold remain possible and can be much larger.
Can a 95% daily VaR be multiplied by ten to get ten-day VaR?
Not generally. Horizon scaling needs explicit assumptions about returns, dependence and the model; even square-root scaling is conditional.