Swing trading — the cost of holding a position through successive nights
In swing trading, a position stays open for several days or weeks. During that time, the result depends not only on the exchange rate, but also on financing and how orders execute after a break in quoting. Eight nights do not always mean eight financing days: the weights of covered rollovers, the rates and the instrument terms matter. The examples show how to calculate holding costs, compare them with the target, and assess what a time exit changes. They also explain why a stop does not guarantee its fill price and why fewer trades slow the evaluation of a rule. All figures are illustrations, rather than promises of performance.

Count the exposure at each financing event
A swing position can cross several financing events without keeping the same volume throughout. Counting nights and multiplying by the final position size would lose part of that history. Start with the actual sequence of events, the weight assigned to each event and the volume present at that instant. The instrument specification documentation lists different swap calculation types and weekday multipliers. It does not supply a universal calendar for every instrument.
Our hypothetical EUR/USD position opens at 1.1840 for 60,000 EUR. A pip is 0.0001 USD per EUR. After event B, 40,000 EUR is closed, leaving 20,000 EUR through event C. Assume a constant charge of 0.70 pips per weighted financing day. The event weights below are stipulated contract inputs, not a rule inferred from weekday names or the length of the holding period.
Keep volume and multiplier in the same row
| Event | Weight | Volume | Pip value | Charge |
|---|---|---|---|---|
| A | 1 | 60,000 EUR | 6 USD | −4.20 USD |
| B | 3 | 60,000 EUR | 6 USD | −12.60 USD |
| C | 1 | 20,000 EUR | 2 USD | −1.40 USD |
At A the charge is −0.70×1×6=−4.20 USD. At B it is −0.70×3×6=−12.60 USD. At C it is −0.70×1×2=−1.40 USD. Adding the rows gives −18.20 USD. The sum of weights is 5, but there is no single unchanged pip value across those weights.
Using only the final volume would give −0.70×5×2=−7.00 USD and omit earlier exposure. Keeping the original volume throughout would give −0.70×5×6=−21.00 USD. Neither shortcut matches this ledger. Reducing the volume before C changes that event’s charge by 2.80 USD; it does not rewrite the charges already posted at A and B.
A protective level and a later fill are different prices
For the remaining 20,000 EUR, suppose the entry was 1.1840 and an ordinary protective exit was set at 1.1805, a distance of 35 pips. After a quotation break, the first received Bid is 1.1788. Separately, stipulate that the closing deal also fills at 1.1788. That equality is an assumption of this example, not a promise that a first quote always becomes a fill.
The remaining component’s price loss is (1.1788−1.1840)/0.0001=−52 pips, or −104 USD at its pip value of 2 USD. The assumed fill is 17 pips beyond the protective level. A stop condition does not itself state the final execution price. The platform’s trading principles identify order conditions and deals separately; actual execution rules belong in the instrument and provider terms.
Do not call a partial calculation the complete trade result
We know the financing total and the remaining component’s price loss. We have not stated the price at which the earlier 40,000 EUR was closed or the commissions. Consequently, −104 USD plus the financing ledger is not the complete position result. Filling that gap with zero would invent an observation. The missing partial-close price could materially change the total.
Build a review sheet with separate rows for changes in volume, financing entries and realised price results. If the rate changes later, apply the new rate to the relevant later events rather than to already recorded entries. A projected holding budget remains conditional on future rates, event weights and execution. The full lesson develops calendars, time exits and gap cases; this example shows why the history of one position cannot be replaced by its final volume.
Three exercises with worked answers
The exercise data are hypothetical. Choose an answer, then check the calculation.
Follow the calculation into the full lesson
The sections below retain the detailed models and illustrations. Use the complete contents to examine different assumptions, execution conditions, evidence and limitations.
1. An operational definition: what exactly rollover changes
Swing trading is a style of holding positions for several days or weeks. Its boundaries are conventional. An operational strategy description should specify entry and exit rules, evaluation times and planned horizon; article 8.1 develops that specification. The label alone defines neither a system nor a signal.
For the calculation here, a position can remain open through several rollovers and quote breaks. Less frequent entry assessment can reduce observation needs, but required supervision also depends on exit rules and events that can trigger them.
Carrying a position through rollover adds a time-dependent component whose total depends on successive rates and settlement weights. Positive rates produce income; negative rates produce debits. At unchanged volume, this component is not multiplied by the number of new trades.
Three operational questions for this lesson
Horizon distinguishes ways of working, while cost accounting evaluates specific assumptions. Holding cost can be small even on a long position or material within a few days. It therefore does not independently define swing trading.
| Question | Answer for an intraday rule | Answer for a multi-day rule | Consequence for the calculation |
|---|---|---|---|
| Is the position ever open at the moment of rollover? | No, if the closing rule works | Yes, many times | Settles whether swap points enter the cost |
| What is the dominant cost component multiplied by? | By the number of trades | By the number of weighted financing days | Determines which quantity has to be controlled in the written rule |
| Do events outside the hours of observation find exposure open? | Not over the weekly break, yes inside the trading window | Yes in both cases | Decides whether a calculation on a fixed defensive-exit distance describes every path |
Protective distance does not guarantee realised loss. A gap can be included in average loss if present in the sample, but the mean alone shows neither frequency nor size of extreme losses. Section 6 therefore distinguishes activation price from fill. Article 8.8 develops events around releases.
What does not belong to the definition
Quantities are frequently dragged into the description of this style that are parameters of a system or subjects belonging to other sections of the course. Separating them is not an editorial formality: some of them can be changed without changing the style, and some do not enter any calculation in this text.
| Quantity | Does it belong to the definition of the style | Justification |
|---|---|---|
| Carrying the position through rollover | Yes | Settles the presence of a time-dependent cost component, that is, everything this article calculates |
| Order of magnitude of holding time | Yes, though the boundaries are conventional | Determines the number of weighted financing days, and through it the size of the time-dependent component |
| Mode of work: assessing the condition without continuous observation | Yes | Decides which constructions of rules are workable, and sets the rate of sample accumulation from section 8 |
| Chart interval | No | The interval determines on what data the condition is assessed. A rule assessed on M15 may hold a position for two weeks, and one assessed on D1 may close it the same day |
| Distance of the defensive exit | No | That is a system parameter following from the condition that invalidates the scenario, not from the horizon. Its arithmetical consequences are broken down in section 7 |
| Position size | No | A system remains the same system regardless of the volume with which it is executed; the rules for setting size belong to section 9 and are not converted here |
| The way levels and entry setups are identified | No | The tools of analysis are described by section 5, and the families of entry logic by article 8.7; a multi-day horizon occurs in every one of them |
| Presumed size of risk | No | Risk on a single trade follows from the distance of the defensive exit and from position size. The horizon enters that calculation neither as a multiplier nor as a divisor |
Less frequent decisions do not prove lower risk. Longer holding changes exposure to events and quote breaks, while realised loss also depends on execution. Position size and risk measures remain in Section 9.
Decision frequency must be distinguished from the time its consequences remain in the market. Less frequent entry assessment can reduce activity, but an open position still responds to quotes between assessments. A rule can specify automatic exit, scheduled review or a response to new information; these have different execution requirements. The style name alone does not identify the chosen construction.
Planned stop distance is another separate fact. It establishes neither account-currency loss nor guaranteed execution at the stop. Here we examine distance changes, cost and fill conditions. Capital assessment also requires exposure size and the appropriate risk measure, developed in Section 9. Keeping these separate prevents equating fewer decisions with less exposure.
The horizon is not the interval
The fourth row of the table above calls for elaboration, because equating the horizon with the chart interval is almost reflexive in descriptions of this style. The sentence "I trade swing, so I work on D1" joins two things that have no common denominator: the interval determines on what data the condition is assessed, and the horizon determines how long the position stays open once it has been met. A rule assessing its condition on fifteen-minute candles may hold a position for two weeks, if its exit rule requires it. A rule assessing its condition on daily candles may close a position after an hour, if that is how its exit reads.
Weighted financing days depend on opening and closing instants and the adjustment calendar, rather than the signal interval. A D1 rule closing before rollover may accumulate no swap; an M1 rule held for two weeks includes the relevant weights. Their sum and sign are calculated separately from signal data.
An elapsed-time exit allows the closing instruction time to be planned. It is not the only possible horizon limit: the rule can specify a final date. Neither guarantees execution before the next financing event if quotations stop or an order is rejected.
The boundary with the neighbouring numbers
On the side of the shorter horizon the boundary is sharp and binary: either the position is sometimes open at the moment of rollover, or it is not. Three borderline cases around that moment — a position closed a dozen minutes before it and without a charge, a ten-minute position covering that moment and with a charge, and a position lasting from local midnight for more than an hour and likewise without a charge — are broken down into their parts by article 8.4, and there is no reason to repeat them here. For a multi-day rule that matter is settled in advance: the charge will occur, the only question is how many times.
Over longer holding periods, also compare financing with exchange-rate risk. Article 8.6 develops that calculation. There is no day count after which swap automatically becomes the dominant source of the result.
2. Interest days and the moment of the triple charge
The charge at rollover is not a fee for the time a position is held measured by the clock. It is the consequence of shifting the settlement date of open exposure by a further day, carried out at one designated moment of the day. The consequence is that the quantity entering the calculation is the number of weighted financing days charged at successive moments of rollover. Neither the number of hours nor the number of calendar nights enters that calculation.
Swap points are not the interest-rate differential
The interest-rate differential is not a ready-made CFD swap rate. Market conditions and contract rules affect financing price. BIS describes wholesale parity deviations,[1] while the instrument specification gives the relevant contract’s rates and method.[2] Splitting two rates into “market” and “markup” requires additional assumptions and is not a measurement of markup.
For the calculation carried on below, two things follow from this. The sign of the charge cannot be derived from the direction of the position or from which currency carries the higher interest rate; it is read off the instrument specification, separately for the long and the short side.[2] The size of the charge, on the other hand, cannot be given universally, because it is a parameter of a particular broker and a particular day. A table of swap points copied out of one price list does not describe conditions at another and does not describe conditions at the same broker a month later. All the figures in this article are for that reason illustrative values adopted to show the mechanism, and not data to be copied out.
Where the triple charge comes from
In the illustrative week, four adjustments have weight 1 and one has weight 3. The triple adjustment corresponds to a three-day settlement-date shift. A particular specification can give different weekday multipliers, including 0; this calendar must not be transferred to every instrument.[2]
First: the moment of the triple charge falls earlier in the week than the weekend itself, because what counts is business days before the settlement date, not after it. Under a two-day settlement convention and rollover at 00:00 server time it falls on the night from Wednesday to Thursday, but this is not a general rule: there are instruments for which the specification indicates another day, and the day itself is capable of being shifted around holidays that change the settlement calendar. The day and the hour are read off the instrument specification at one's own broker, not off a description of the mechanism.[2]
The position’s covered rollover determines the weight. A position closed after Wednesday’s event can accumulate three days without remaining open over the weekend. One opened later can miss that weight despite crossing the weekend. This allocates adjustments according to settlement dates; it is not a payment transferred between the holders of the two positions.
Six quantities needed to calculate anything at all
Before the first figure is stated, one has to have the full set of input data. Four of them are found in the instrument specification window, two are sometimes published separately.
- The daily charge for a long position — expressed in points of the instrument or in currency per unit of volume, depending on the convention adopted by the broker. The convention has to be read together with the figure, because two different conventions give two different quantities at the same value of the field.
- The daily charge for a short position — a separate quantity, with a separate sign. Substituting one for the other is a mistake that changes the result together with its sign.
- The day of the week with the triple charge — a parameter of the instrument, not a principle of the market.
- The hour of rollover in server time — determines the moment at which it is settled whether the position enters settlement.
- The offset of server time against universal time — needed in order to convert that moment into the clock the observer uses.
- Offset-change dates — dates and magnitude relevant to the server’s and observer’s zones; neither zone is assumed necessarily to change its clock. Article 8.4 explains the mismatch.
Reconstruction needs rates with units, weights and the actual instants at which rollovers were covered. Server time alone does not show how long the position was open. Without those inputs a scenario can be described, but actual cost cannot be reconstructed.
The calendar of one position, night by night
The summary below breaks into its parts a position opened on Monday morning and closed on the Tuesday afternoon of the following week. The calendar assumptions are illustrative: rollover at 00:00 server time, moments of rollover from Tuesday to Saturday server time, the triple charge on the night from Wednesday to Thursday, no rollover on nights when quotation is suspended. Each of these assumptions is a parameter of the specification and each has to be checked at one's own broker before the calculation is repeated on one's own figures.
| Calendar night | Moment 00:00 server time | Rollover | Interest days | Cumulative |
|---|---|---|---|---|
| Monday → Tuesday (week 1) | Tuesday | yes | 1 | 1 |
| Tuesday → Wednesday | Wednesday | yes | 1 | 2 |
| Wednesday → Thursday | Thursday | yes, triple | 3 | 5 |
| Thursday → Friday | Friday | yes | 1 | 6 |
| Friday → Saturday | Saturday, close of the trading week | yes | 1 | 7 |
| Saturday → Sunday | Sunday | no, quotation suspended | 0 | 7 |
| Sunday → Monday | Monday, open of the trading week | no | 0 | 7 |
| Monday → Tuesday (week 2) | Tuesday | yes | 1 | 8 |
Three figures from this summary have to be kept apart, because in descriptions of this style they are sometimes confused with one another: eight calendar nights, six moments of rollover, eight weighted financing days. The first and the third agree here in value, and the second agrees with neither of them.
Here the weights sum to eight, coincidentally matching eight nights. They need not match over another holding window. Zeros in weekend rows mean no adjustment at those specific instants, rather than proving someone else paid for this position.
From this comes the divergence from the number of moments of rollover, and from this comes the mistake that recurs most often in calculations of the cost of holding. Multiplying the daily rate by the number of moments of rollover gives in this case six days instead of eight, that is, it understates the time-dependent component by a quarter. Multiplying it by the number of hours held divided by twenty-four gives a result different again and equally wrong, because an weighted financing day is not a clock day and does not begin at the moment the position is opened.
When the agreement with the number of nights ceases to hold
The general form is D = Σ dⱼ, with dⱼ the weight of each covered rollover. The shortcut below uses calendar nights, weekly breaks B and triple events Q, and applies only to the illustrated calendar: complete nights, two uncharged nights per week, other weights 1 or 3, and no holidays.
weighted financing days = calendar nights − 2 × B + 2 × Q
The derivation takes two sentences. Each weekly break contains two nights on which no rollover occurs, so it subtracts two days from the sum. Each moment of the triple charge gives three days in place of the one that would fall on its own night, so it adds two to the sum. Hence the condition for the agreement of both figures:
weighted financing days = calendar nights if and only if B = Q
Equality therefore requires the covered triple-event count to balance covered weekly breaks, rather than merely including a triple event. Two cases show the shortcut “it includes a triple, so days equal nights” fails in both directions. A Monday-morning to Thursday-afternoon position covers three nights, no weekly break and one triple event: B = 0, Q = 1, giving 3 − 0 + 2 = 5 days despite including the triple. A Monday-morning to Wednesday-afternoon position covers two nights, no break and no triple: B = 0, Q = 0, giving exactly 2 days despite excluding it.
A third arrangement covers the weekly break but misses the triple event: B = 1, Q = 0. In this calendar, summed weights are two fewer than nights. All five table arrangements can be reconstructed from the specified weights.
| Opening | Closing | Calendar nights | Moments of rollover | Interest days | Days per night |
|---|---|---|---|---|---|
| Wednesday morning | Thursday afternoon | 1 | 1, triple | 3 | 3.00 |
| Friday morning | Monday afternoon | 3 | 1 | 1 | 0.33 |
| Thursday morning | Wednesday afternoon of the following week | 6 | 4 | 4 | 0.67 |
| Monday morning | Tuesday afternoon of the following week | 8 | 6, including one triple | 8 | 1.00 |
| Wednesday morning | Wednesday afternoon of the following week | 7 | 5, including one triple | 7 | 1.00 |
The first and second rows describe the same mechanism seen from two sides. A position lasting one night pays three days, because it landed on the moment at which the date is shifted by three days. A position lasting three nights pays one day, because it entered after that moment and left before the next. A threefold difference one way and a threefold difference the other, with three days between one opening and the other.
The conclusion is at the same time narrower than it might seem, and it is worth bounding straight away. No rule of the "open on Thursday" kind follows from this — choosing the moment of opening to suit the rate of the charge would mean that entry is decided by the settlement calendar, and not by the entry condition written into the rule. What does follow is that the cost-of-holding calculation cannot be carried out on the number of days alone. It needs dates, the hour of rollover and an indication of the day of the triple charge — only out of those three things comes the figure by which the rate is multiplied.
Scroll the diagram horizontally or open it at full size.
Holidays shift and multiply
The calendar in the table above describes a week in which every day is a business day on both markets relevant to the pair. When one of them is not, the shift of the settlement date jumps across that day exactly as it jumps across the weekend. There are two consequences and both have to be checked separately.
A holiday can change a particular adjustment’s weight. If one weight increased from 1 to 2 here with others unchanged, D would rise from 8 to 9. Holding cost would be 4.50 pips and total cost 6.50, or 4.3% of the target. This conditionally changes one weight rather than claiming every holiday increases the sum over any holding period.
The second concerns the day of the triple charge itself. Since it is determined by the number of business days before the settlement date, a holiday falling inside that window shifts it to another day of the week. A calculation resting on the assumption "the triple charge is always on the night from Wednesday to Thursday" comes out wrong in such a week not by a proportion but by a whole position in the calendar — and with a position lasting several days the difference between one day and another decides whether the moment of the triple charge was covered at all. This is a further reason why the day is read off the instrument specification for the given week, and not off a general rule.
Moving the multiple-adjustment day can place it inside or outside the holding window. A Wednesday-to-Thursday position would accumulate weight 3 in the model, but could receive only 1 if that event moved to an earlier night. For the specific week, sum the actual covered weights again; B and Q do not cover every holiday arrangement.
Changing weight and changing date are different events. Increasing a covered weight with other inputs fixed changes D and financing at the rate assigned to that event. Moving it to another night first requires checking whether the position still covers it. Moving the event can also assign it a different rate. Adjusting night count alone is insufficient.
A holiday-free week is not by definition favourable or adverse. It is one event arrangement useful for explaining the calculation. Reconstructing a position requires the calendar applicable to its period and reconciliation with actual account entries. A discrepancy near the threshold can reverse the model margin’s sign; farther away it remains a data error even if its effect on the conclusion is smaller.
Scroll the diagram horizontally or open it at full size.
Variable rates: weight days, rather than events
For six illustrative rollovers, assume weights [1, 1, 3, 1, 1, 1] and rates [−0.50; −0.50; −0.80; −0.80; −0.30; −0.80] pips per day. Total financing Σ rⱼdⱼ is −5.30 pips. The weighted mean rate is −5.30/8 = −0.6625. The ordinary mean of the six rates multiplied by 8 would give −4.9333, understating cost by 0.3667. The rate at weight 3 has three times the contribution.
Each input-table row should represent one covered event and contain its rate and weight. This identifies the source of every part of the total. A rate changed between rollovers is not applied retrospectively to earlier adjustments. If unit or method changes, convert to a common basis before summing.
The weighted mean does not forecast a future rate. It summarises financing on this particular path and checks the accounting. Planning the next position can use a scenario with the same or different rates, but remains conditional. Assessing sensitivity to a rate change at a multiple weight is preferable to allocating every change equally among events.
With round-trip cost 2 pips, full C is 7.30 and the threshold for W = 150 and L = 75 is (75 + 7.30)/225 = 36.58%. This is a constructed rate-change scenario without quotations or an executed strategy.
3. The cost of holding through eight nights
The calculation below is the core of the whole article. It leads from the daily rate to a figure that says something meaningful: to the share of the cost of holding in the target the rule sets itself. Cost expressed in pips alone says nothing until it is set against the distance the price has to travel.
Illustrative assumptions. EUR/USD, one pip = 0.0001. W = 150 and L = 75 pips represent movement from a common reference price before spread and slippage. The model keeps the trade list fixed and deducts round-trip cost separately. An actual long enters at Ask and exits at Bid; their fill difference already contains spread and execution deviations included in those prices. They are not deducted again. Section 2’s calendar gives D = 8. The following rates are not from any broker offer.
- Spread 0.60 pips — enters once per round turn, because the buy occurs at the Ask and the closing of a long position at the Bid.
- Commission 0.40 pips — per round turn, that is, both sides together, converted into pips according to the pip value for the volume assumed; the method of conversion is given by section 2.
- Entry slippage 0.30 pips and exit slippage 0.70 pips — estimates, rather than data; the exit is assumed more expensive for illustration, without measuring the slippage distribution.
- Adjustment per weighted financing day: −0.50 pips — an assumed long-position value, rather than a broker-offer reading, under a convention where negative numbers reduce the result. A short position would have a separate value and sign.
Calculation — the component dependent on the number of trades. C_ent = 0.60 + 0.40 + 0.30 + 0.70 = 2.00 pips per closed trade.
Calculation: weighted financing days. Six rollover events: five single and one triple, so 5 × 1 + 1 × 3 = 8 days. Check: one weekly break and one triple event mean B = Q in section 2, so summed days match the eight calendar nights.
Calculation — the time-dependent component. C_hold = 8 × 0.50 = 4.00 pips.
Calculation — total cost and its relation to the target. C = 2.00 + 4.00 = 6.00 pips. C / W = 6.00 ÷ 150 = 4.0% of the target. The time-dependent component alone: 4.00 ÷ 150 = 2.7% of the target. For the assumed distance to remain after the cost has been subtracted, the price has to travel 150 + 6.00 = 156.00 pips.
A cost specified before entry is an assumption. Quoted spread and published rate are readings at that instant; exit spread, slippage and final summed weights can differ. A specified end date can plan D, while realised days and adjustments are confirmed after closure.
Result and interpretation. The cost of holding makes up two-thirds of the total cost and 2.7% of the target. It is a quantity absent altogether from the calculation for an intraday rule, and one which at this horizon exceeds the cost of entry and exit twofold. Caveats: a constant daily rate was assumed throughout the holding period, which is a simplification — the rate is sometimes changed from day to day. It was also assumed that a losing trade is closed after the same number of days as a winning one, a simplification discussed in section 9.
Where the figure of −0.50 pips comes from
The daily rate used above is a converted quantity, not one read off directly. Instrument specifications state the charge in different units, and the conversion into pips is sometimes the source of a mistake larger than all the remaining cost components together, so it is worth seeing it in the three most common conventions.
Assumptions. EUR/USD, an account denominated in US dollars, volume of one standard lot, that is 100,000 units of the base currency. The value of one pip for such a volume is 10.00 USD; the way it is determined is given by section 2. The instrument is quoted to five digits, so one point is 0.00001 and one pip is 0.0001 — ten points to a pip. The rate adopted for conversion: 1.0840. Illustrative values.
First convention — the charge in points of the instrument. The specification states −5.0 points per day. Conversion: −5.0 ÷ 10 = −0.50 pips.
Second convention — the charge in account currency per lot. The specification states −5.00 USD per day per standard lot. Conversion: −5.00 USD ÷ 10.00 USD per pip = −0.50 pips.
Percentage convention: illustration. A −1.68% rate on USD 108,400 notional with a 365-day basis gives −USD 1,821.12 annually, −USD 4.98937 daily, or −0.49894 pips at USD 10 per pip. Rounded, this is −0.50 pips. Signs remain negative at every stage; 365 is an assumption of this convention.
Proportionality check. At one tenth the volume, the adjustment under the second convention is −USD 0.50 and pip value USD 1.00; the quotient stays unchanged. Where financing is proportional to volume, its amount in pips does not depend on size, which allows this article’s calculations to use pips.
Percentage conversion requires the notional basis, year convention and currency of the charge. A percentage rate is dimensionless, an amount has currency units, and a pip measures exchange-rate change. Dividing the amount by pip value connects the latter two. Keeping the sign throughout avoids presenting a debit as income.
Similar rounded values do not make the conventions identical. The percentage example adds exchange-rate and year-basis assumptions; a quoted money amount can already include the provider’s application of them. It must not also be reconverted as a percentage. If the basis is unknown, the correct conclusion is insufficient data rather than a guessed rate.
Information availability and execution. Convention and value are known before opening, but only for the reading date. The third convention additionally requires an exchange rate that changes during holding, so its pip rate is not constant even at an unchanged annual percentage.
Result and interpretation. Three different notations give the same quantity, but they require three different conversions — and confusing the conventions changes the result by an order of magnitude, not by percentages. Substituting −5.00 instead of −0.50 pips gives, over eight days, a cost of holding of 40.00 pips instead of 4.00 pips, that is 26.7% of the target instead of 2.7%. Caveats: the number of days in the year adopted in the third convention varies between instruments and enters the calculation as a further quantity to check; taking 360 instead of 365 changes the daily rate by 1.4%.
What running the same calculation on six days gives
Substituting the number of moments of rollover for the number of weighted financing days gives C_hold = 6 × 0.50 = 3.00 pips, a total cost of 5.00 pips and a share of the target of 5.00 ÷ 150 = 3.3%.
Omitting two days understates cost by 1 pip per trade in this negative-rate case. At a hypothetical five trades per month, that would be 60 pips per year. At a positive rate, the same error understates income rather than cost. Error direction therefore depends on the adjustment’s sign.
The same calculation under a positive charge
The sign of the charge is a parameter, not a constant. Swap points are sometimes positive on one side of the pair, and then the time-dependent component is not a cost but a revenue — and the whole calculation runs in exactly the same way, the sign of one component changes and nothing else.
Assumptions. Everything unchanged from the calculation above, apart from one quantity: the charge per weighted financing day is +0.30 pips instead of −0.50 pips. Illustrative values.
Holding income: F = 8 × 0.30 = +2.40 pips. The rate is assumed constant and the position survives all six rollovers.
Net cost: C = 2.00 − 2.40 = −0.40 pips. The surplus arises only after financing is accumulated; no such income exists on opening.
C / W = −0.40 ÷ 150 = −0.27%, or −0.3% rounded. This balances round-trip cost against subsequent adjustments at unchanged reference price rather than describing a positive opening result.
Moment of availability and execution. The sign and size of the charge are read off the specification for the given day, separately for the long and the short side. They cannot be derived either from the direction of the position or from which currency of the pair carries the higher interest rate — the reason is given by section 2. Nor can they be assumed for the whole holding period, because the rate is sometimes changed in the meantime.
The 0.40-pip surplus is small relative to target 150, but can offset a sufficiently small adverse move. It is neither risk-free income nor evidence of an edge. Comparing rates only by absolute value loses the distinction between income and cost.
Cost set against gross expected value
The share of cost in the target answers the question of what part of the assumed move the cost takes. It does not answer the second question, usually the more important one: what part of what the rule works out does the cost absorb. That second relation needs one additional assumption — the hit rate — and it has to be written down explicitly, because it is assumed and not measured.
Assumptions. W = 150 pips, L = 75 pips, C = 6.00 pips as above. Hit rate p = 45% — a figure adopted for the calculation, describing no actual rule and coming from no test; it serves solely to show the relation. Illustrative values.
Gross expected value. E_gross = 0.45 × 150 − 0.55 × 75 = 67.50 − 41.25 = +26.25 pips per trade.
Net expected value. E = 26.25 − 6.00 = +20.25 pips.
Relative cost. C / E_gross = 6.00 ÷ 26.25 = 22.9%. The time-dependent component alone: 4.00 ÷ 26.25 = 15.2%.
Win rate 45% is an accounting assumption here. It can be used in a pre-test scenario; an empirical estimate requires a defined sample. Section 8 shows uncertainty in the simple two-point model.
Cost is 22.9% of the positive gross result in this model. C / E_gross represents the absorbed surplus only when E_gross > 0; it is undefined at zero and loses that interpretation when negative. Target length alone does not establish whether cost is decisive.
The section has produced three percentages, and each answers a different question, so substituting one for another changes the conclusion: 4.0% is the share of cost in the target, 22.9% is the share of cost in the gross result, and 2.7% is the share of the time-dependent component alone in the target. The first does not depend on the hit rate, the second depends on it strongly, the third depends on the number of weighted financing days.

Two formulations of the same cost
Illustrative entry-reference Bid is 1.08394 and expected exit Bid 1.08557, a gross move of 16.3 pips. Spread 0.6 gives expected entry Ask 1.08400. With entry deviation +0.3 pips, purchase fill is 1.08403; with exit deviation −0.7 pips, sale fill is 1.08550. Their difference is 14.7 pips.
Reference-price method: 16.3 − 0.6 − 0.3 − 0.7 − 0.4 commission − 4 swap = 10.3 pips. Fill method: 14.7 − 0.4 − 4 = 10.3. Deducting spread and both deviations again from fills would understate the result by 1.6 pips.
The methods are equivalent because they describe exactly the same trade. The first reconstructs reference movement and the transition from expected quotes to assumed fills; the second starts from the actual fill difference. Commission and financing are outside that difference in both. Reference results for one position cannot be reconciled with another position’s fills.
A discrepancy between methods can diagnose records. Check price sides, pip unit, deviation signs and double-recorded costs. The discrepancy alone does not identify which entry is wrong. This reconciles one calculation; it does not prove the assumed cost describes a whole future sample.
4. How this cost grows and when it matches the target
The calculation in the previous section concerns one horizon and one rate. Both of those quantities vary in practice across a wide band, and a result that changes sign after a small and realistic change in one assumption is better recognised before the first order than after the fiftieth.
Sensitivity to length of hold
The table changes only weighted financing days D. Its first column cannot be read as night count without checking the calendar. Every row assumes a fixed rate and the same movement before costs.
| Hold | Interest days | Cost of holding at −0.50 pips per day | Total cost C | C / W at a target of 150 pips | Break-even win rate p* |
|---|---|---|---|---|---|
| 1 night | 1 | 0.50 pips | 2.50 pips | 1.7% | 34.4% |
| 3 nights | 3 | 1.50 pips | 3.50 pips | 2.3% | 34.9% |
| 8 nights | 8 | 4.00 pips | 6.00 pips | 4.0% | 36.0% |
| 15 nights | 15 | 7.50 pips | 9.50 pips | 6.3% | 37.6% |
| 22 nights | 22 | 11.00 pips | 13.00 pips | 8.7% | 39.1% |
| 30 nights | 30 | 15.00 pips | 17.00 pips | 11.3% | 40.9% |
All the parameters in the table are illustrative values. The last column uses the formula p* = (L + C) / (W + L), which section 5 derives; at W = 150 and L = 75 pips the denominator is 225 and is the same in every row.
The column with the share of cost in the target grows linearly, because the numerator grows linearly. The time-dependent component alone comes at thirty days to 15.00 ÷ 150 = 10.0% of the target, and at one day to 0.50 ÷ 150 = 0.3%. Between the first row and the last neither the rule nor the rate changed; the only change was how long the position stood open.
A comparison with an intraday rule is worth making on the same quantity, and not on amounts. A rule closed out before rollover, with a target of 24 pips and a cost of entry of 2.0 pips, gives up 8.3% of the target to cost and does so regardless of how many days it trades. The multi-day rule from the table above stays below that level all the way to the twentieth day, matches it at twenty-one days — because then C = 2.00 + 10.50 = 12.50 pips, and 12.50 ÷ 150 gives exactly 8.3% — and only above that boundary gives up a larger part of the target to cost than a day rule. The daily calculation for a rule closed out before the end of the day is carried out by article 8.4; here only the reference is needed.
Scroll the diagram horizontally or open it at full size.
Sensitivity to the size of the charge
The second dimension is the daily rate itself, and its spread between instruments is sometimes wider than the spread of the horizon. The summary below holds eight weighted financing days and moves the rate alone.
| Charge per weighted financing day (illustrative values) | Cost of holding over 8 days | Total cost C | C / W at a target of 150 pips | Break-even win rate p* |
|---|---|---|---|---|
| +0.30 pips | −2.40 pips | −0.40 pips | −0.3% | 33.2% |
| −0.20 pips | 1.60 pips | 3.60 pips | 2.4% | 34.9% |
| −0.50 pips | 4.00 pips | 6.00 pips | 4.0% | 36.0% |
| −1.00 pips | 8.00 pips | 10.00 pips | 6.7% | 37.8% |
| −1.50 pips | 12.00 pips | 14.00 pips | 9.3% | 39.6% |
The second column keeps the sign convention of section 3: a positive figure means a charge, so the total cost arises through simple addition, C = 2.00 + cost of holding. A positive daily rate gives, under that convention, a negative cost, that is a revenue, hence the −2.40 pips in the first row. The spread of the break-even win rate between the first row and the last is 6.4 percentage points at an unchanged rule, an unchanged horizon and an unchanged entry price. One figure read off the instrument specification changed, and the threshold required to break even moved by as much as, with a short target, a doubling of the spread is capable of moving it.
Without the swap rate, the threshold is incomplete. Omitting negative financing understates the calculated threshold; omitting positive financing overstates it. The table describes the sensitivity of the stipulated model, rather than a range of conditions representative of brokers.
When the cost of holding matches the target
The question calls for one operation: the target divided by the daily rate gives the number of days after which the time-dependent component eats the whole assumed distance. It is a limiting calculation and describes no sensible rule — what it does show is where the boundary lies against which it is worth setting one's own horizon.
| Target W | At −0.20 pips per day | At −0.50 pips | At −1.00 pips | At −1.50 pips |
|---|---|---|---|---|
| 40 pips | 200 days | 80 days | 40 days | 26.7 days |
| 80 pips | 400 days | 160 days | 80 days | 53.3 days |
| 150 pips | 750 days | 300 days | 150 days | 100 days |
| 300 pips | 1500 days | 600 days | 300 days | 200 days |
The table shows the continuous financing boundaries W/r. D = 26.67 for W = 40 and a cost of 1.50 falls within a few weeks of model days; D = 40 can also correspond to the upper end of a horizon lasting several weeks. Conversion into nights requires a calendar, and adding round-trip costs brings the net-result boundary forward.
The rest of the table says something contrary and equally important. At a one-hundred-and-fifty-pip target and a rate of −0.50 pips the boundary lies at three hundred days, that is, far beyond any horizon counted in weeks. The claim "swap points eat a swing trader's profit" is therefore true for some sets of parameters and false for others, and what settles it is the quotient of two figures that one has to have. A general statement one way or the other makes no sense without both being given.
A third dimension: the period the rate comes from
The two dimensions above can be set. The third is a quantity nobody has any influence over and which cannot be assumed once and for all: the daily rate changes over time and is sometimes changed from day to day. A position held for three weeks therefore passes through a dozen or more charges, each of which may have been charged at a rate other than the one read at the moment of opening.
A change in the sign of the result when the rate changes indicates sensitivity to that rate. It does not prove that there is only one fitted point. Calculate the boundary rate, but also the range of rates over which the conclusion holds, and explain why that range is credible.
Rate and calendar changes require their own record. Errors in them need not increase monotonically with the horizon: their effect depends on the signs and weights of successive changes. A constant rate is a useful scenario, rather than a reconstruction of several weeks of actual charges.
Exit after the passage of time as a cost parameter
A time exit can limit planned holding costs. Below, we compare two hypothetical holding periods while keeping the rate constant. Shortening the period also changes the distribution of price outcomes, however; a calculation of swap savings cannot replace that distribution.
Assumptions. Parameters as in section 3: W = 150 pips, L = 75 pips, C_ent = 2.00 pips, a charge of −0.50 pips per weighted financing day. The distribution of holding lengths consists of illustrative values adopted for the calculation and read off no record: 80% of trades reach the target or the defensive exit within ten weighted financing days and take on average 7.5 days to do so, and the remaining 20% do not reach either level in that time and, with no time limit, close on average after 40 days. The variant compared differs in one thing: the rule contains an exit after the passage of time set at ten weighted financing days. Status of the result: an illustrative example, not the result of a test on data.
Calculation — average number of days without a limit. 0.80 × 7.5 + 0.20 × 40 = 6.00 + 8.00 = 14.00 days.
Calculation — average number of days with an exit after ten days. 0.80 × 7.5 + 0.20 × 10 = 6.00 + 2.00 = 8.00 days.
Calculation — cost. Without a limit: C_hold = 14.00 × 0.50 = 7.00 pips, C = 2.00 + 7.00 = 9.00 pips, C / W = 9.00 ÷ 150 = 6.0% of the target. With an exit after ten days: C_hold = 8.00 × 0.50 = 4.00 pips, C = 6.00 pips, C / W = 4.0% of the target.
Threshold in the auxiliary model. If both variants retained only outcomes of +150 and −75 pips, costs of 9 and 6 pips would give thresholds of 37.3% and 36.0%, a difference of 1.33 percentage points. Adding a time exit creates a third type of outcome. These two thresholds therefore do not describe the actual rule with a time stop; its threshold requires the distribution of all its exits.
Budget in the model. D ≤ 10 and a constant cost of 0.50 pips per day give C_hold ≤ 5.00 pips. This condition requires closure before a rollover whose weight would exceed the limit. An execution interruption or a rate change may breach the budget; the time an order is submitted guarantees neither its fill price nor its fill time.
The time limit is known from the written rule before entry. The distribution of holding periods can be assumed in a scenario and subsequently estimated from records. The actual execution price and time become known afterwards. These three types of information should remain separate.
In the model, the mean cost falls by 3 pips; for an illustrative 60 trades, that would mean a difference of 180 pips in costs alone. This is not a forecast of improved performance. Trades closed earlier have different price outcomes, which may increase or eliminate that saving.
The cost comparison retained from the original calculation is meaningful as a separate layer: at a constant rate, shorter holding reduces negative financing. The same win rate and the same two distances cannot be retained, however, when some positions now close after a time limit. Their outcomes may lie between the levels and, following a gap or incomplete execution, outside the range assumed in the simple model.
Earlier closure removes the possibility of subsequently reaching either the target or the stop. The gain or loss from that decision therefore requires a comparison of complete paths, including the time-exit price, delays and actual financing. The third-outcome model below preserves this information through separate X_T and C_T terms. The swap-savings calculation remains valid within its scope, but applying it to total expectancy requires additional data.
Once a deadline has been specified, a financing budget can be calculated at particular rates and weights. Assessing the entire exit separately requires closing prices, instances of delay, and the outcomes the rule would have achieved without that exit.
Scroll the diagram horizontally or open it at full size.
A time stop creates a third outcome
If 20% of positions end because of the time limit, the complete equation is E = p_W(W − C_W) − p_L(L + C_L) + p_T(X_T − C_T), with p_W + p_L + p_T = 1. X_T is the signed mean price outcome of the time exit. It cannot automatically be assigned +W or −L.
The probabilities of the three groups refer to all closed positions and sum to one. A win rate calculated only among target and stop hits is no longer sufficient to use the former threshold. The proportion of outcomes arising from time exits must also be known. That group's cost may differ because it closes at different weights and under different execution conditions.
If X_T is estimated from the results used to select the deadline, that same history is being used for selection. It does not provide independent confirmation of the chosen time stop. Comparison with a new period should concern a frozen version of the complete procedure, including review dates and the response to delays. The values in this illustration are stipulated; they show the effect of the third group, rather than a favourable closing deadline.
In the illustration, p_W = 0.36, p_L = 0.44, p_T = 0.20, and C for each group is 6. For X_T = 0 the result is 15 pips; for X_T = −50 it is 5 pips. The same financing saving can therefore accompany different results for the complete rule.
5. The cost of holding inside the break-even win rate
In the two-outcome model, p* is the proportion of the gross outcome +W at which the net mean is zero. It need not be the proportion of trades with positive net results: with positive carry, some price losses can finish as net gains.
E = p × W − (1 − p) × L − C
p denotes the proportion of the gross outcome +W, and 1 − p the proportion of −L. W and L are positive magnitudes of the movement before costs, and C is the complete mean cost in the same unit. In this model, both groups have the same cost.
p × (W + L) = L + C → p* = (L + C) / (W + L)
The formula is the same one used by article 8.3, and its full derivation together with the consequences for assessing edge is developed by article 8.2. The only new thing is what enters C: alongside the spread, the commission and both slippages there now stands a component dependent on the number of weighted financing days.
Illustration: W = 150 and L = 75 pips on a common price basis before costs. We compare C = 0, round-trip costs of C = 2, and complete costs of C = 6 at D = 8. These are not backtest results.
Without cost. p* = 75 / (150 + 75) = 75 / 225 = 0.33333 = 33.3%.
The cost of entry and exit alone. p* = (75 + 2.00) / 225 = 77.00 / 225 = 0.34222 = 34.2%.
Full cost. p* = (75 + 6.00) / 225 = 81.00 / 225 = 0.36000 = 36.0%.
The threshold calculated before entry is conditional on the assumed W, L, cost and horizon. A specified target is not an empirical mean gain, and a specified stop is not an empirical mean loss. Records must distinguish reference prices from actual fills.
Result and interpretation. The whole cost of holding — eight days, four pips — raises the required hit rate by 1.8 percentage points. That is a quantity which at this target can be ignored in conversation and cannot be ignored in a calculation carried across a year. Caveats: identical W and L were assumed for all trades, an identical number of weighted financing days for winning and losing trades, and no trades closed outside those two levels.
By how much the time-dependent component alone moves the threshold
Since p* = (L + C) / (W + L), the increase in the threshold on a change in cost alone comes to:
Δp* = ΔC / (W + L)
For the calculation in this section: 4.00 ÷ 225 = 0.01778, that is 1.8 percentage points. The direct check gives 36.0% − 34.2% = 1.8 percentage points, so both methods agree.
The denominator is the sum of both distances, and it is that which settles the scale of the phenomenon across the whole section. At a target and a defensive exit of five pips each the denominator is ten, so every pip of cost moves the threshold by ten percentage points. At 150 and 75 pips the denominator is 225, so the same pip moves the threshold by 0.4 percentage points — twenty-two and a half times less. Four pips of holding cost do here as much as not quite two tenths of a pip of spread in a five-pip rule: 4.00 ÷ 22.5 = 0.178 pips.
Costs can determine feasibility at any horizon. A more distant target reduces the effect of a single pip of cost on this threshold, but removes neither financing nor execution risk.
A second derivation, from net quantities
The same threshold comes out by a second route, in which the cost is drawn into both trade results instead of being subtracted separately. The derivation of both forms of the formula and their equivalence is given by article 8.2; here the result of that derivation is needed for the figures in this section.
With W = 150, L = 75 and C = 6, the positive net outcome is 144 pips, the loss magnitude is 81 pips, and their ratio is 144/81 = 1.7778. Hence p* = 81/(144 + 81) = 36%. The ratio has fallen by 11.1% from 2.0. This is the same cost operation expressed on both sides of the outcome; the cost does not disappear when the formula is rearranged.
In the gross formulation, the cost is deducted from the mean. In the net formulation, the same cost reduces the positive outcome and increases the absolute magnitude of the negative outcome. These are two forms of the same operation, rather than two separate charges. The denominator, the sum of the positive and negative distances, remains 225 because equal costs cancel in their sum.
Retain both formulations as a check on the calculation. If they give different thresholds, check the sign convention, the price basis, and whether the costs of the two groups are actually equal. Section 9 changes this final condition, because different holding periods may produce different costs for gains and losses. The simple formula cannot be transferred without checking that condition.
The case of a positive charge
The variant with a positive time-dependent component calls for a separate paragraph, because it gives a result that occurs in none of the remaining calculations in this section. At C = −0.40 pips the threshold comes to (75 − 0.40) ÷ 225 = 74.60 ÷ 225 = 0.33156, that is 33.2% — not quite two tenths of a percentage point below the cost-free threshold, because 0.40 ÷ 225 = 0.00178.
Holding income lowers the threshold in this model. A difference of 0.18 percentage points is small relative to win-rate uncertainty in a small sample, but does not represent a universal limit on measurement resolution. None of these thresholds, on its own, establishes an edge.
The common-sense test
The three thresholds—33.3%, 34.2% and 36.0%—lie between 0 and 1. A positive cost raises the threshold, while C = −0.40 lowers it to 33.2%. C = 6 is below W = 150, so the model with two fixed outcomes admits a win rate at which the mean is zero. This does not confirm actual feasibility or an edge. At a constant negative rate, each additional weighted financing day increases C by 0.50 and the threshold by 0.50/225 = 0.22 percentage points. These checks concern the scenario's algebraic consistency.
The fourth check leads to a limiting case that in this article falls very far away and is worth seeing precisely for that reason. Were the total cost to match the target, that is, to reach 150 pips, the threshold would come to (75 + 150) ÷ 225 = 1.000; how to read that value and values above one hundred per cent is given by the same article 8.2. What matters here is something else: how many weighted financing days it takes to reach that boundary at all. At a rate of −0.50 pips and a cost of entry of 2.00 pips it would require (150 − 2.00) ÷ 0.50 = 296 weighted financing days, that is close to ten months of holding a single position. The table in section 4 gives the same boundary for the time-dependent component alone, so for a rate of −0.50 pips and a target of 150 pips it comes out there as a round three hundred days; the difference of four days is exactly the cost of entry and exit converted into days.
The number of trades does not enter the threshold formula. The horizon can change not only C, however, but also empirical W and L and the proportion of exits other than target and stop. A threshold calculated with two constant distances isolates only the cost effect.
6. The defensive exit at a gap: order price and fill price
Assuming a fixed loss of 75 pips simplifies the calculation. Its frequency should not be assigned without data. A position spanning a weekend or another break may encounter a gap; not every position held for several days spans a weekend.
The causes of discontinuity in quotation are the subject of section 4 and there is no reason to develop them here. For the cost calculation what counts is the execution side alone, and that comes down to separating three quantities that in colloquial description merge into one.
| Quantity | What it is | When it is known |
|---|---|---|
| The level recorded in the order | A figure entered before the position is opened; it determines the condition for triggering the order | Before the position is opened |
| The price at which the condition was met | The first quote on the side appropriate to the direction of the position that crossed the recorded level | At the moment of crossing |
| The fill price | The price at which the order was actually executed; where quotation is discontinuous it lies further away than the recorded level | After execution |
An ordinary protective level defines a trigger condition. For a long position in the instrument described, this is the Bid price; for a short position, the Ask.[5] The fill price depends on available quotes and order execution; the stop level alone does not guarantee it.
Assumptions. EUR/USD, a long position. Fill price on entry on the Ask side: 1.08400. Target 150 pips, that is 1.09900. Defensive exit 75 pips below the fill price, that is a level recorded in the order of 1.07650, referred to the Bid price, since a long position is closed by selling at the Bid. Last quote before the break in quotation: Bid 1.07900 — the defensive level untouched, the position stays open through the break. First quote after the break: Bid 1.06980, Ask 1.07030, a spread of 5.0 pips against the 0.6 pips assumed for ordinary conditions. All the prices are illustrative values; they come from no series of quotes and serve solely to show the mechanism.
Calculation — whether the condition was met. The first quote after the break on the Bid side is 1.06980, that is, it lies below the recorded level of 1.07650. The triggering condition is met at the moment of the first quote.
Execution assumption in the illustration: the sell order is filled in full at Bid 1.06980. This is an assumed fill, rather than a guarantee of execution at the first displayed quote.
Calculation — the difference between the order price and the fill price. 1.07650 − 1.06980 = 0.00670 = 67.0 pips.
Calculation — the realised distance. 1.08400 − 1.06980 = 0.01420 = 142.0 pips against the 75.0 pips recorded. Quotient: 142.0 ÷ 75.0 = 1.89.
The quoted sequence contains no quotes between the last tick and the first tick after the break. A fill at the stop level cannot be inserted into it. The quote triggers the condition, while the assumed fill price is an additional assumption. The difference between the actual entry Ask and exit Bid already includes the spread and the illustrated slippage.
The price outcome of −142 pips is a loss almost twice the planned distance of 75. The additional 67 pips correspond to 67/20.25 = 3.3 contributions of the model's expected mean in section 3. This is not the result of three specific winning trades: one model winning trade nets +144, whereas +20.25 is the weighted mean of gains and losses. The comparison shows the scale of the deviation relative to the conditional surplus, without predicting how many trades would be needed to recover the loss. The assumed gap size and fill determine neither the frequency of such an event nor an upper bound on the possible deviation.
Why a fixed L does not describe gap execution
A loss of 142 pips lies outside the fixed-L = 75 model. It can, however, enter the mean and distribution of actual losses. Until its frequency and other exits have been incorporated, the threshold in section 5 does not describe the entire rule.
Stop and limit orders have different execution conditions. An ordinary stop may fill worse than its level, while a limit may remain unfilled. That fact alone determines neither a slippage distribution nor whether limit-order price improvement is close to zero; data from a specific sample are required.
A gap can also produce a favourable exit price. The target level alone is not a general upper bound on price improvement. The outcome distribution depends on order types, execution rules and the price path; a diagram of a gap does not determine it.
The BIS report on the sterling flash event of 7 October 2016 identifies an interaction between the timing of the event and flows related to option hedging.[4] It concerns the wholesale market. It provides neither gap frequencies nor a distribution of retail fills for this lesson's model.
The side of the price settles the triggering of the order
The second borderline case requires no gap at all and is sometimes overlooked precisely because it looks innocent. The chart of an instrument quoted over the counter is in platforms of the MetaTrader family built by default from the Bid price, and the Ask line is visible only once it has been explicitly switched on.[3] A short position, however, is closed by buying, that is at the Ask price — so the triggering of its defensive order is settled by a line that is not shown on the chart by default.
Assumptions. EUR/USD, a short position. Fill price on entry on the Bid side: 1.08400. Defensive exit 75 pips above the fill price, that is a level recorded in the order of 1.09150, referred to the Ask price. The quote at the decisive moment: Bid 1.09120, Ask 1.09170, spread 5.0 pips. Illustrative values.
Calculation — what the chart shows. The maximum of the Bid line is 1.09120, that is, it lies 3.0 pips below the recorded level. On a chart built from the Bid the level remains untouched.
Calculation — what settles the matter. The Ask price is 1.09170, that is, it lies 2.0 pips above the recorded level. The condition for triggering the defensive order of a short position is met.
Calculation — the realised distance. 1.09170 − 1.08400 = 0.00770 = 77.0 pips against the 75.0 pips recorded.
Ask and Bid are separate sides of the quote. With a wider spread, the distance between them increases. In this example, we assume a full fill of the short position at Ask 1.09170; the documentation defines the trigger side,[5] but the quote alone does not guarantee that fill price.
Result and interpretation. The sentence "the level was not touched and the order fired anyway" describes a situation in which the observer is looking at one side of the quote while the order refers to the other. The excess of 2.0 pips is in this example small and changes no quantitative conclusion; what it does change is whether the path can be reconstructed from the record at all. Caveats: referring the level to one side of the quote or the other is a platform setting and a broker convention, so it is a further quantity that has to be checked rather than assumed.
The price side, trigger level and execution rule must be specified regardless of the target's distance. With a small distance, an error can account for a larger share of the result, but a distant target does not make it cease to be an error.
A pending order left through the break
A pending order may be triggered after a break when a quote satisfies its condition. Reaching the price does not, however, guarantee a fill. Below, we assume a full limit-order fill at a better price to show how the position's geometry changes.
Illustration: buy limit 1.07650, stop Bid 1.06900. After the break, we assume a buy fill at Ask 1.07030. This is 62 pips better than the limit level, and the distance to the unchanged stop is 13 pips. It is an assumed execution, rather than an automatic consequence of the first tick.
Both distances change if the levels remain fixed. The target originally set 150 pips above the limit, at 1.09150, is now 212 pips from the new entry fill, while the stop is 13 pips away. Keeping W = 150 would require moving the target, a separate rule. We do not deduct the full spread cost from these fills again or transfer the previous win rate to the new geometry.
The written procedure may keep absolute levels, set distances from the actual entry, or reject fills outside a specified range. Each choice creates a different procedure. There is no need to identify the best one to require that the choice be resolved before reconstruction. An assumed better fill does not justify retaining the old W without checking the target's location.
Records should not conceal this change in a single mean distance. They should allow reconstruction of the original limit level, actual entry price, and the rule for setting both exits. Gap cases can then be described as part of a defined strategy, rather than mixing constructions resolved only after execution. A favourable entry price is an execution fact; the expected outcome of the complete altered geometry remains a separate question.
Partial fill and rejection of the order
The last borderline case concerns what happens to the rest of the position. If a closing order is executed in part, the remaining part stays open — and with a multi-day position that means it passes through further moments of rollover and adds weighted financing days. A cost-of-holding calculation carried out for the whole position then ceases to correspond to reality in two places at once: the number of days is different for each part, and the moment of closing that the record will note concerns only the first of them.
Partial-closure records should allow reconstruction of the portion remaining open at each charge. Section 9 develops rules for changes in exposure. Without data, we assign neither a frequency to such cases nor a dominant share of cost errors.
Orders with guaranteed execution
The conditions of specific execution guarantees belong in section 11. If the contract provides for an additional fee, the calculation uses its actual charging basis. It should not be assumed to have the same weight as swap in every case.
Triggering and filling are separate observations
To reconstruct an exit, record the trigger time and price on the appropriate quote side, and the time and price of every fill. A tick satisfying the stop condition does not demonstrate a full fill on that tick. The gap example shows a price outcome of −142 pips, which already includes spread and execution deviation; commission and actual swap then enter the final result.
7. The distance of the defensive exit and the horizon
In descriptions of this style the distance of the defensive exit is sometimes given as one of its features: a multi-day rule has a "wide stop", an intraday rule a "narrow" one. That formulation is a shorthand describing a consequence rather than a cause, and it is worth unpacking, because it leads straight to the most frequent mistake about risk.
The distance of the defensive exit does not follow from the horizon. It follows from the condition on whose fulfilment the scenario ceases to hold — and that condition is written into the rule and belongs to its construction. The coincidence arises because a scenario laid out over several days is invalidated by a movement of price that on the scale of a few hours is an ordinary fluctuation. The distance is larger because the range of movement the rule has to withstand is larger, not because the position stands for longer.
A stop of a dozen or so pips in a multi-day rule cannot be deemed internally inconsistent without information about its signal and volatility. A wide stop in an intraday rule can also be reached. Consistency between the distance and the invalidation condition is checked for a specific rule, without a universal range of “good” distances.
What changing the distance alone does to the calculation
The summary below holds the target and the cost unchanged, and moves the distance of the defensive exit alone. All the parameters are illustrative values, and the total cost C comes to 6.00 pips as in section 3.
| W / L (pips) | Relation of W to L | Break-even win rate without cost | Break-even win rate at C = 6.00 pips | Difference |
|---|---|---|---|---|
| 150 / 37.5 | 4.00 | 20.0% | 23.2% | +3.2 pp |
| 150 / 75 | 2.00 | 33.3% | 36.0% | +2.7 pp |
| 150 / 150 | 1.00 | 50.0% | 52.0% | +2.0 pp |
| 150 / 225 | 0.67 | 60.0% | 61.6% | +1.6 pp |
The last column repeats the expression C / (W + L): 6.00 ÷ 187.5 = 3.2%; 6.00 ÷ 225 = 2.7%; 6.00 ÷ 300 = 2.0%; 6.00 ÷ 375 = 1.6%. Two effects run here in opposite directions and it is worth separating them, because they are sometimes confused with one another. Lengthening the defensive exit enlarges the denominator, so it weakens the influence of cost expressed in percentage points of the threshold. At the same time it worsens the relation of gain to loss, so it raises the threshold itself — and does so far more strongly. Between the first row and the last the influence of cost falls by 1.6 percentage points, and the threshold rises by forty.
The conclusion concerns the way such tables are read, not the choice of parameters. The sentence "a wider stop dilutes the cost" is arithmetically true and practically unimportant, because it dilutes it by a quantity smaller than the order by which it changes everything else. The calculation has to be carried out on the threshold, and not on its increment.
A longer horizon and the size of risk
The stop distance and position size determine the planned loss assuming execution at the level. Actual risk also includes gaps, costs and other exits. The horizon can change this exposure; it guarantees neither a smaller nor a larger loss.
Pip distances remain independent of volume. A linear cost model also preserves proportions, but minimum fees or different execution can alter them. Position sizing and capital measures remain in section 9.
A position spanning a break remains exposed to price discontinuity. Not every multi-day position spans a weekend. The example in section 6 shows that an ordinary stop is not an upper bound on loss, but does not determine the frequency of such events.
What the horizon changes and what it does not
| Quantity | Does it depend on the horizon | Justification |
|---|---|---|
| Number of weighted financing days | Yes, directly | In the model, this is the sum of the weights covered, increasing in steps according to the calendar |
| Number of breaks in quotation the position passes through | Yes | Determines the number of occasions on which the execution of the defensive exit may depart from the recorded level |
| Number of trades per unit of time | Depends on the system, including concurrent positions | Determines the rate at which the sample accumulates and settles after what time the result means anything — section 8 |
| Distance of the defensive exit | Not directly | Follows from the condition invalidating the scenario; the coincidence with the horizon is a consequence, not a definition |
| Risk of a single trade | The horizon can change exposure | The planned loss at the stop level does not include all costs, gaps and exits |
| Break-even win rate | Not directly | Depends on W, L and C; with fixed W and L, the model shows the financing effect alone; other exits can also change the price-outcome distribution |
| Expected value before costs | Can change with the exit rule | The model keeps distances fixed; actual outcomes also depend on time and path |
The pace of collecting outcomes may constrain evaluation of the rule. It does not follow directly from the duration of one position, especially with concurrent positions. The next section assumes a particular frequency to illustrate the uncertainty calculation.
8. The rate at which the sample accumulates
Trade frequency depends on the rule, the number of instruments and the concurrent positions permitted. For comparison, assume five trades per month for one multi-day rule. This is not a measurement of typical swing trading. At this frequency, the time needed to collect a specified number of outcomes can be calculated.
Assumptions. A two-point distribution: a trade ends with a result of +144.00 pips or −81.00 pips, that is, the target and the defensive exit after subtracting the cost of 6.00 pips from section 3. Hit rate p = 0.45 — an assumed value, not a measured one. Number of trades N = 60 a year, that is five a month — likewise an illustrative value, adopted for the calculation. Observations assumed for now to be independent; that simplification is lifted below.
Range. 144.00 − (−81.00) = 225.00 pips.
Standard deviation of a single result. For a two-point distribution s = range × √(p × (1 − p)) = 225.00 × √(0.45 × 0.55) = 225.00 × √0.2475 = 225.00 × 0.49749 = 111.94 pips.
Standard error of the mean. SE = s / √N = 111.94 / √60 = 111.94 / 7.746 = 14.45 pips.
Interval. An approximate interval with coverage of about 95% has a half-width of 1.96 × 14.45 = 28.3 pips.
Win rate and volatility can be stipulated as explicit scenarios for planning. Measuring them requires a sample. The uncertainty calculation below concerns an independent two-outcome model, rather than an actual rule or a guaranteed time to confirmation.
The model mean is +20.25 pips, and at N = 60 the half-width of the normal approximation is 28.32 pips. An interval centred on this stipulated mean includes zero. An actual interval would be centred on the observed sample mean and could fall elsewhere. One year neither always confirms nor always rules out an edge; sample size, dispersion, dependence and effect size matter.
Sample size for a standard-error target
For an SE equal to half of E = 20.25, at least ceil((111.936087/10.125)²) = 123 independent observations are required. For one quarter of E: ceil((111.936087/5.0625)²) = 489. At a hypothetical five trades per month, these correspond to approximately two and eight years. This is a standard-error target, rather than a guarantee of confirming an edge.
The standard-error target compares the dispersion of the mean with a specified effect size. It does not state how many trades will suffice in every case. Different W, L or p change the volatility of an individual outcome and the required N. Dependence also changes the pace at which additional rows reduce uncertainty.
Converting N into years adds another assumption: the stipulated frequency must persist throughout that period. A rule may have inactive periods or many signals at once. A long history provides more opportunities to observe different conditions, but does not turn them into identical independent trials. A data-collection plan therefore retains event markers and the rule version; the passage of a year alone is not a success criterion.
The observation counts are rounded up to whole numbers, since greater precision would be misleading: the standard deviation entered the calculation as a quantity derived from an assumed win rate, rather than a measurement. The relationship itself is a general property of the square root and contains nothing specific to this style—a fourfold reduction in uncertainty requires a sample sixteen times as large. Only the time multiplier needed to collect that sample is characteristic of the style.
The comparison with the other end of the section takes one division. A short-term rule gathering 660 trades a month accumulates more observations in a month than a multi-day rule does in ten years. No superiority of either follows from this — what follows is that statements about the result have, in the two cases, an entirely different status after the same length of time. The sentence "the rule works, I checked it for a year" means one thing at six hundred trades and another at sixty.
Why sixty trades can contain fewer independent observations
The calculation above assumes independence of results, and in a multi-day rule that assumption is sometimes violated in a way hard to ignore. Signals do not spread out evenly: they appear under conditions in which the rule works at all, and those persist for weeks. Several successive trades are therefore capable of being taken within the same movement of price, and where several pairs are traded — also on instruments that move together.
Assumptions. Trades fall into clusters of on average m = 3, and the correlation of results within a cluster comes to ρ = 0.5. Both figures are illustrative values adopted to show the order of magnitude; one's own have to be estimated from the record, not assumed.
Variance inflation factor. The formula, whose derivation and variant for smaller clusters is given by article 8.2: 1 + (m − 1) × ρ = 1 + 2 × 0.5 = 2.0.
Effective number of observations. N_eff = 60 / 2.0 = 30.
Standard error. SE = 111.94 / √30 = 111.94 / 5.477 = 20.44 pips, that is forty-one per cent more than under the assumption of independence.
Interval. Half-width 1.96 × 20.44 = 40.1 pips, that is close to twice the expected value.
Clustering and correlation are estimated from data. Before a sample is collected, dependence scenarios may be stipulated for uncertainty planning; they are not measurements. Timestamps help identify positions that spanned shared events.
Result and interpretation. Sixty trades taken across a dozen or so distinct market situations are not sixty independent observations. Under these assumptions they correspond to roughly thirty — and it is that figure which ought to be entered into the uncertainty calculation. Caveats: the formula assumes equal cluster size and equal correlation within them; where clusters are strongly unequal, methods robust to autocorrelation or a block bootstrap are more appropriate.
Setting both calculations together yields a conclusion that concerns the way the record is kept, and not the rule itself. At five trades a month each single observation weighs so much in the estimate that omitting it or recording it wrongly changes the result visibly. The fields without which the calculation in this section cannot be repeated are the timestamp of opening and closing, both fill prices, both distances recorded in the rule, and the number of weighted financing days with the charge actually made. Which further fields the record ought to contain is listed by article 8.1.
In the two-point model, the standard deviation was calculated without data, from assumed W, L and p. Other specified distributions can also be calculated without an empirical sample. The actual distribution includes additional exits and may contain extreme observations; a normal approximation for the mean does not describe the shape of individual losses.
Changing a parameter creates a new version of the rule and requires identifying the data used to select it. The earlier version's history retains diagnostic value, but does not become independent confirmation of the amendment. When new trades accumulate slowly, a variant register and a plan for control data are important.
An interval for the mean is not a loss range
For the model with p = 45%, net outcomes of +144 and −81, and N = 60 independent observations, the standard deviation is 111.936087 pips and SE = 14.450887. The normal approximation for the mean is 20.25 ± 28.32, or [−8.07; 48.57]. This is neither the range of possible outcomes for one trade nor the probability that the “true result” lies in the interval. With dependent observations, the approximation requires a different error estimate.
This interval is a scenario calculation around a stipulated mean. In data analysis, its centre would be the sample mean, and volatility would have to be estimated or the model explicitly justified. The frequentist interpretation concerns the procedure: across repeated samples satisfying the assumptions, a specified proportion of intervals includes the parameter. It does not assign the true mean a probability distribution after one interval has been observed.
An interval for the mean and the distribution of one loss answer different questions. A narrow interval may describe the mean well for a rule with widely dispersed individual outcomes. It is neither a loss limit nor evidence that rare gap fills are small. This lesson shows uncertainty in the mean; capital and drawdown measures remain in section 9.
9. What this calculation does not say
The cost-of-holding calculation is the principal tool in this article, so all the more precisely does one have to indicate where its reach ends. The limitations below are not small-print caveats; each of them changes what may be drawn from the calculation.
The number of weighted financing days is a result of the rule, not a parameter of it
All the calculations above take the number of days as given in advance. In reality it is determined by the moment the position is closed, and that depends on when the price reached one of the levels — that is, on something not known at the moment of opening. The eight days from section 3 are therefore a conditional scenario, not a forecast, and the 4.0% of the target that follows from it has to be read that way.
A scenario or time limit can be specified in advance, and actual charges confirmed after closure. The exit spread and execution are also unknown at entry. A planned deadline limits the financing model under the stipulated conditions; it does not provide an unconditional upper bound on costs.
Winning and losing trades do not have the same number of days
The cost of gains and losses may differ because closing time depends on the price path. A closer stop does not, by itself, demonstrate that losses will end sooner. The direction and size of this difference must be estimated; below, we assume one scenario.
The scale of that burden can be calculated. Suppose a winning trade passes through twelve weighted financing days and a losing one through four — illustrative values. The cost of the winning side then comes to 2.00 + 12 × 0.50 = 8.00 pips, and of the losing side 2.00 + 4 × 0.50 = 4.00 pips. Expected value at a hit rate of 45% comes to 0.45 × (150 − 8.00) − 0.55 × (75 + 4.00) = 0.45 × 142.00 − 0.55 × 79.00 = 63.90 − 43.45 = +20.45 pips, against +20.25 pips under a uniform cost. The break-even win rate comes to 79.00 ÷ (142.00 + 79.00) = 79.00 ÷ 221.00 = 35.7%, against 36.0%.
The difference is in this example smaller than three tenths of a percentage point and changes the sign of no conclusion. It is nonetheless worth calculating, because the direction of the simplification is not obvious in this construction: a uniform cost overstates the threshold rather than understating it. At other proportions of the two distances and another daily rate the outcome is sometimes the reverse, so substituting one's own figures is here the only way to check.
The daily rate is a parameter over which the rule has no influence
The rate of −0.50 pips is illustrative. Actual rates may change over time under the contract's terms. Reconstruction requires a history of readings and charges, rather than applying today's specification retrospectively.
A quantity of this kind cannot be removed from the calculation or replaced with a constant. What can be done is to determine the threshold at which the rule ceases to make arithmetical sense at the assumed horizon, and to write it down in advance — as in the limiting table in section 4. The difference between the one approach and the other is the difference between a calculation that can be invalidated and a calculation that can be interpreted arbitrarily after the fact.
That recommendation stays empty until the boundary has been calculated, so below it is calculated for the flagship parameters of this article.
Assumptions. The flagship parameters of this article: W = 150 pips, L = 75 pips, C_ent = 2.00 pips, eight weighted financing days, hit rate p = 45% — an assumed value, the same as in section 3, describing no actual rule. What is sought is the daily rate r at which expected value falls to exactly zero. Illustrative values.
Calculation — admissible total cost. E = 0.45 × 150 − 0.55 × 75 − C = 67.50 − 41.25 − C = 26.25 − C. Setting this equal to zero gives C = 26.25 pips.
Calculation — admissible cost of holding. C_hold = 26.25 − 2.00 = 24.25 pips across eight weighted financing days.
Calculation — the limiting rate. r = 24.25 ÷ 8 = 3.03 pips of cost per weighted financing day, that is more than six times the rate of −0.50 pips assumed in the flagship calculation.
Check by a second route. At C = 26.25 pips the break-even win rate comes to (75 + 26.25) ÷ 225 = 101.25 ÷ 225 = 0.45000, that is exactly 45.0% — as much as the hit rate assumed. Both ways of determining the boundary give the same figure.
Calculation — a second form of the same criterion. At an unchanged rate of −0.50 pips the same boundary falls at (26.25 − 2.00) ÷ 0.50 = 48.5 weighted financing days, that is at a hold of the order of seven weeks.
Moment of availability and execution. W, L and C_ent come from the written rule and from the account terms, so the boundary can be calculated and written down before the first order. The daily rate itself is a reading from the specification for the given day and is sometimes changed while the position is held, so the criterion is checked at every reading, not once. The hit rate enters the calculation as an assumed quantity, and at every other assumed hit rate the boundary falls elsewhere.
The result and what does not follow from it. At these parameters the margin is wide: the rate would have to rise more than sixfold to invalidate the calculation, and the worst row of the sensitivity table in section 4, that is a rate of −1.50 pips, gives C = 14.00 pips and an expected value still positive, +12.25 pips. It does not follow from this that the boundary is always remote. What does follow is how it is calculated and that the result of that one division has to be written down together with the rule, before the first position is opened. Caveats: the boundary depends on the assumed hit rate as strongly as on the rate; at a hit rate of 38% instead of 45% the admissible total cost comes to 0.38 × 150 − 0.62 × 75 = 57.00 − 46.50 = 10.50 pips, so the limiting rate falls to (10.50 − 2.00) ÷ 8 = 1.06 pips per day. The calculation determines the boundary at an assumed horizon of eight days and at another horizon gives a different figure; the hit rate of 45% is at the same time an assumed quantity and not a measured one, so the boundary is exactly as conditional as it is.
The threshold is a necessary condition, not proof of edge
Exceeding the threshold means that expected value on the assumptions adopted is positive. It does not mean that the rule has an edge. Edge can be spoken of only once a positive expected value after full costs has been estimated on an explicit sample, together with its uncertainty, and has obtained confirmation outside the data on which the rule was built. At five trades a month that condition is particularly costly in time — the calculation in section 8 shows how many years it requires. The procedure that settles this is described by article 8.9.
The formula contains no information about the shape of the distribution
Two rules with an identical break-even win rate and an identical expected value may have radically different paths: a different length of losing runs, a different share of the largest trades in the whole result, a different skew. The formula p* = (L + C) / (W + L) contains three averages and contains nothing beyond them. The probability of a losing run and the influence of single observations on the result of the whole are calculated by article 8.2, and the distributions characteristic of particular families of entry logic by article 8.7.
Gap outcomes can be incorporated into the mean loss and distribution. The simple model is limited by using a fixed L instead of actual losses, rather than by an inability to incorporate extreme observations into any calculation.
From pips to account currency and beyond
Conversion into the account currency requires the pip value and the appropriate conversion rate. The pip calculation is independent of volume here under linear financing and costs; a minimum fee can break that relationship. Position sizing remains in section 9.
Neither does the calculation answer the question of whether a multi-day rule is workable at all given the hours available and the mode of work available. That question is an eliminating task and is settled by article 8.10. Finally, it says nothing about how to react to the path of a position held for several days; reactions to the path of the result belong to section 10 and enter no formula in this text.
A style's name does not tell us whether its rule is easier or safer. Beyond costs and the pace of sample collection, a longer horizon changes exposure to events and price discontinuity. Section 9 develops risk measures and position sizing.
When reading the specification is no longer enough
When taking a reading, record the instrument, direction, unit, value, server time and its UTC offset, and the weight calendar. Retain the source-verification date and the reading itself—today's documentation describes the method, rather than last week's rate. Subsequent checkpoints are rate changes, the next rollover covered, and closure; compare the plan with the actual charge at these points. This documents one rule, rather than a universal table of rates.
10. Self-check exercise and where to go next
The test set by this article consists in calculating the cost of holding one position on parameters other than those used in the text. Below is a set of data and a model solution; having worked through them, the same sequence of operations can be repeated on values read off one's own instrument specification.
The rule assumes a target of 90 pips and a protective exit of 45 pips, both measured on a common reference-price basis before costs. Cost parameters—illustrative values: spread 0.80 pips, round-trip commission 0.50 pips, entry slippage 0.40 pips, exit slippage 0.80 pips, and a credit of −0.80 pips per weighted financing day. The calendar is as in section 2: rollover at 00:00 server time on nights ending Tuesday through Saturday, with a triple charge on Wednesday night into Thursday. The position opens on Thursday morning and closes on Wednesday afternoon of the following week.
- Calculate the number of calendar nights, the number of moments of rollover and the number of weighted financing days. Explain the divergence between the first and the third figure.
- Calculate the cost of entry and exit, the cost of holding and the total cost.
- Calculate the cost as a percentage of the target.
- Calculate the break-even win rate without cost and with cost, and the difference in percentage points.
- Check how the result changes if the position is opened a day earlier, on Wednesday morning, with the moment of closing unchanged.
- Calculate the variant in which the charge is +0.45 pips per day instead of −0.80 pips.
- Settle the sign of expected value at a hit rate of 40% before you calculate it, and then calculate it.
- Convert the rate from the convention used in your specification. Check whether each of the three quotations gives the same value of −0.80 pips per day: −8.0 instrument points, −8.00 USD per day per standard lot, and −2.69% per year of the notional value. The instrument is quoted to five decimal places, the pip value is 10.00 USD, the exchange rate is 1.0840, and the year basis is 365 days. Also calculate the answers to questions 3 and 4 after incorrectly reading the first number as −8.0 pips rather than points.
1. Calendar. There are six nights from Thursday morning to Wednesday of the following week. Under the stipulated calendar, the position covers four single rollovers: Friday, Saturday, Tuesday and Wednesday at 00:00, giving D = 4. It misses the weight of 3 on Wednesday night into Thursday. The shortcut for this model gives 6 − 2 × 1 + 2 × 0 = 4. This is not a payment made by someone else.
2. Cost. C_ent = 0.80 + 0.50 + 0.40 + 0.80 = 2.50 pips. C_hold = 4 × 0.80 = 3.20 pips. C = 2.50 + 3.20 = 5.70 pips.
3. Cost against the target. C / W = 5.70 ÷ 90 = 0.0633 = 6.3% of the target. For ninety pips net to remain, the price has to travel 95.70 pips.
4. Break-even win rate. Without cost: p* = L / (W + L) = 45 ÷ 135 = 0.3333 = 33.3%. With cost: p* = (45 + 5.70) ÷ 135 = 50.70 ÷ 135 = 0.3756 = 37.6%. Difference: +4.2 percentage points, which agrees with C / (W + L) = 5.70 ÷ 135 = 0.0422.
5. Opening a day earlier. A position opened on Wednesday morning also covers Wednesday night into Thursday, the triple-charge event. Calendar nights: 7. Rollover events: 5, including one triple. Weighted financing days: 4 × 1 + 1 × 3 = 7, now equal to the number of nights because B = 1 and Q = 1. C_hold = 7 × 0.80 = 5.60 pips, C = 2.50 + 5.60 = 8.10 pips, C/W = 9.0% of the target, p* = (45 + 8.10) ÷ 135 = 53.10 ÷ 135 = 39.3%. Opening one day earlier adds three weighted financing days, 2.40 pips of cost and 1.8 percentage points to the threshold, since 2.40 ÷ 135 = 0.0178.
6. Positive financing. F = 4 × (+0.45) = +1.80 pips. C = 2.50 − 1.80 = 0.70 pips. C/W = 0.70 ÷ 90 = 0.8% of the target. p* = (45 + 0.70) ÷ 135 = 45.70 ÷ 135 = 33.9%, 3.7 percentage points below the variant with negative financing.
7. Expected value. The sign can be settled before the calculation: the assumed hit rate of 40% lies above the threshold of 37.6%, so expected value must be positive. The calculation confirms it: E = 0.40 × 90 − 0.60 × 45 − 5.70 = 36.00 − 27.00 − 5.70 = +3.30 pips per trade. The margin is at the same time narrow — in the variant from point 5, where the threshold comes to 39.3%, the same hit rate gives E = 36.00 − 27.00 − 8.10 = +0.90 pips.
8. Rate units. −8.0 points / 10 points per pip = −0.80 pips. −8.00 USD / 10 USD per pip also gives −0.80 pips. An annual rate of −2.69% on a notional value of 108,400 USD, using a 365-day basis, gives −7.98893 USD per day, or −0.79889 pips. After rounding, the results are close. A tenfold error occurs when −8.0 points is misread as −8.0 pips: C = 2.50 + 4 × 8 = 34.50 pips, C/W = 38.3%, and p* = 58.9%. Reading −8 USD as −8 points in the stated units does not give 8 pips.
Check. The threshold with a positive cost exceeds the threshold without costs, while a negative cost lowers it. Costs do not exceed the target in any variant. The sign of expectancy agrees with the win rate's position relative to the threshold. The weighted financing days in question 5 equal the calendar nights because B = Q; in question 1 they are exactly two lower, because B exceeds Q by one. The three conventions in question 8 give the same daily rate, while the variant with the mistaken convention shifts the threshold by 21.3 percentage points, rather than a fraction of a point. All quantities are in pips; conversion into account currency would require the pip value and has not been performed, apart from the convention conversion in question 8, which requires the pip value by definition.
What to do with this calculation next
The calculation requires round-trip costs, successive rates, weights and the times at which rollovers are covered. Some can be read before the decision; later fills and charges are confirmed by records. A test observing signals without submitting real orders does not measure actual slippage. Article 8.9 distinguishes modes of testing on incoming data.
Information available before the decision includes the current quote, published commission and financing rate with its unit, and the known weight calendar. These do not promise the same conditions at the later exit. The planned holding period permits a scenario for D; the events actually covered depend on when, and in what portions, the position is closed.
After execution, fill prices and times and the financing charges become available. Slippage should be measured against a clearly specified expected price, retaining its sign. A prospective record without orders can assess signal availability, but cannot produce observed real slippage. This list of components complements the calendar in section 2: one determines the charges, while the other reconciles the complete net result.
Cost as a share of the target shows its scale, but does not by itself determine whether costs decide the result. Even a few percent of the target can absorb a substantial share of a small expectancy. With longer holding, compare financing with the complete price outcome and its uncertainty.
The next article compares financing and exchange-rate changes over a longer holding period. Swap is a separate component of the result even for a short-duration position; the horizon changes its sum, rather than its nature. In article 8.6, we also calculate positive carry and the risk that an adverse exchange-rate movement exceeds the accumulated credits.
Estimate multi-night holding charges with the Swap Calculator, size positions for gap exposure in the Position Size Calculator, and monitor macro releases in the Economic Calendar.
FAQ — frequently asked questions
How many nights correspond to how many charges?
There is no general equality. Add the weights of the rollovers covered: D = Σ dⱼ. In the illustrated calendar without holidays, the shortcut is nights − 2B + 2Q; equality with nights requires B = Q. One night covering a weight of 3 gives three days, while three weekend nights in another window may give one. Holidays and other multipliers require the weights to be added again.
Does a time exit improve the rule's result because it reduces costs?
Costs alone fall from 9 to 6 pips in the model. This does not demonstrate improved performance, because a time exit creates additional price outcomes. The 37.3% and 36.0% thresholds concern an auxiliary model with two unchanged distances, rather than the complete rule with a time stop. The D = 10 limit gives a swap budget of 5 pips only at a constant rate and with closure executed at the stipulated time.
Does a defensive exit set 75 pips away limit the loss to 75 pips?
No. An ordinary stop specifies a trigger condition, rather than a guaranteed fill. The illustration assumes execution at 1.06980, a price loss of 142 pips, and a difference of 67 pips from the stop. Specific execution rules or guarantees must be checked in the contract terms; they belong in section 11.
Does a pending order left across a break open a position with the specified parameters?
Not necessarily. With the assumed fill at 1.07030, the stop at 1.06900 is 13 pips away. If the original target remains at 1.09150, its distance increases to 212 pips, rather than remaining at 150. The procedure for preserving or recalculating levels must be specified beforehand. A better entry alone confirms neither the win rate nor an edge.
Where do the inputs for this calculation come from?
From your broker's instrument specification and your own records. The specification supplies daily long and short charges, the triple-charge day, rollover time in server time, and the server's UTC offset. Your records supply slippage at both ends, which no specification provides. A swap-point table copied from someone else's comparison describes conditions at another broker and on another date, so it is unsuitable for this calculation.
Can positive swap points cover the entry cost?
They can cover round-trip costs after the credits have accumulated. D = 8 at +0.30 gives 2.40 pips against costs of 2.00, a balance of +0.40 before the exchange-rate movement. This is neither a positive result at opening nor evidence of an edge; the price and later rates can change it.
Sources and bibliography
- Covered interest parity lost: understanding the cross-currency basis. Wholesale market: hedging demand and balance-sheet constraints are associated with deviations from parity. It does not identify a retail swap rate. Verification scope: excerpts from interpretative sections and the conclusion; no claim is made to have read the full publication. Access checked: 5 October 2026.
- MetaTrader 5 — Market Watch: Specification. Swap type, long/short rates, weekday multipliers and units. Verification scope: the specification section of the documentation was read and verified on 5 October 2026. Access checked: 5 October 2026.
- MetaTrader 5 — Chart Settings. Price sides and the Ask-line display, used to distinguish the chart from triggering. Verification scope: the documentation page was read; broker offers were not surveyed. Access checked: 5 October 2026.
- The sterling flash event of 7 October 2016. A documented wholesale episode and interaction of contributing factors; no distribution of retail fills. Verification scope: the publication page and an excerpt from the report, rather than a complete microstructure study. Access checked: 5 October 2026.
- MetaTrader 5 — Basic Principles of Trading. Buying at Ask, selling at Bid, and the long/short trigger sides for SL/TP. It does not guarantee a fill at the quote. Verification scope: the sections covering basic principles and triggering were read. Access checked: 5 October 2026.