News trading: what can fail around a data release
A data release can move the exchange rate and change the conditions under which a trade is executed. The spread, slippage, order activation and information timing all matter. This lesson uses complete numerical examples to show how those changes affect costs, break-even win rate and entry/exit prices. It compares four entry constructions with abstaining from entry, and explains the limits of candle data. Interpreting the economic release and the direction of the market’s reaction belong to section 6.

Separate the screen quote from the completed trade
A screen can show a favourable price just before an order reaches the server. A later execution at another price is not explained by the screenshot alone. Start with a small event record: what the observer saw, when the decision was formed, when the request arrived and what was actually executed. These records answer different questions even when their timestamps are close.
The following EUR/USD quotes and events are hypothetical. All times use UTC on a single synchronised clock, and one pip is 0.0001. Assume the observer receives a release message at 14:30:00.040 and forms a decision at 14:30:00.050. The quoted snapshots below describe that feed; they do not guarantee that a specified order size could trade at them.
| Observation time | Bid | Ask | Spread |
|---|---|---|---|
| 14:29:59.900 | 1.07200 | 1.07210 | 1 pip |
| 14:30:00.030 | 1.07240 | 1.07270 | 3 pips |
| 14:30:00.090 | 1.07255 | 1.07285 | 3 pips |
Follow the request to its actual fill
The buy request for 30,000 EUR reaches the server at 14:30:00.060. Its recorded execution is 14:30:00.095 at 1.07290 USD per EUR. The interval from receipt to fill is 35 milliseconds. The fill is 2 pips above the Ask of 1.07270 observed before the decision, and 0.5 pip above the later snapshot Ask of 1.07285. Both comparisons are arithmetically correct, but they use different benchmarks.
Preserve the chosen benchmark and its observation time. Neither comparison isolates the contribution of market movement, communication delay, available liquidity or execution policy. A quote seen earlier is not a commitment for an order arriving later. MetaTrader’s trading principles distinguish execution modes and order states; the actual contract and instrument settings determine which apply. This worksheet assumes a recorded market fill without assigning it a cause.
Calculate the cash result from the correct sides
Suppose the complete long position is later sold at a recorded Bid fill of 1.07320. The movement between actual fills is 1.07320−1.07290=0.00030 USD per EUR, or 3 pips. For 30,000 EUR that is 9.00 USD. Assume a total commission of 1.20 USD for the completed round trip and no other charges in this short illustration. The net result is 9.00−1.20=7.80 USD.
Do not subtract the displayed spread again: the buy fill and sell fill already reflect their respective transaction sides. Conversely, do not calculate the result from the earlier Bid and ignore the actual buy price. The size is an input to the arithmetic, rather than a suggested position. If the exit Bid fill had instead been 1.07250, the same method would give −12.00 USD before commission and −13.20 USD after it. A positive example does not establish a repeatable advantage.
Keep the information record alongside the price record
The release message has its own reference period, value, arrival time and possible revision. The order has a separate receipt, status, size and fill history. Combining them permits a reconstruction of what the process could know. It does not by itself identify the release as the sole cause of a price change or show that another participant could have obtained the same fills.
The Federal Reserve study of high-frequency releases used a specified interdealer dataset with transaction and quote information. Its findings do not replace an individual order record. In your own exercise, retain cancelled, rejected and unfilled requests as well as completed trades. Removing them after seeing the outcome changes the sample. The full lesson develops break-even thresholds, pending orders and the limits of candle-based reconstruction.
Three exercises with worked answers
The exercise data are hypothetical. Choose an answer, then check the calculation.
From the event record to release-window risk
The detailed sections preserve the original price examples, charts and break-even calculations. Use them to examine pending-order activation, quoting gaps and what must be assumed when only OHLC data are available.
1. The release window as an execution problem
Window boundaries and information available before the decision
Distinguish the scheduled calendar time, actual release time and time at which information reaches the rule. These timestamps need not coincide. A condition using a released value cannot operate before it is available. A condition solely prohibiting entries around a scheduled time can be assessed beforehand. This distinction is needed to reproduce the decision; it requires no extension into interpreting the report itself.
Exclusion boundaries refer to a selected timestamp. Specify how to treat an order sent before a boundary but filled after it, and a pending order remaining active. Prohibiting new order submissions, prohibiting new fills and requiring no open position are three different versions. A signal skipped by the first does not become a losing trade, and a late fill does not disappear from the second merely because submission occurred earlier.
Convert the source time for the specific date. Different daylight-saving calendars can change the relationship between source time and the rule’s clock during part of the year. “Server time” alone does not reproduce historical offsets. Article 8.4 explains this consequence; here retain the original time, zone and conversion applied on the date.
A scheduled release permits defining a window around a time known beforehand, although its content is still unknown. This enables calendar-based entry prohibition or a flat-position requirement. An unscheduled event can also have a response rule starting when detected through a specified source, but cannot remove earlier exposure. The main calculation below concerns scheduled-release windows whose boundaries and statuses must be specified before testing.
These consequences concern two distinct layers, and confusing them is the commonest source of misunderstanding. The first asks what the release means: whether it surprised relative to consensus, in which direction, by how much, and whether the previous figure was revised. The second asks which prices and execution methods are available at that time. The first belongs to section 6 and is not repeated here. The second is this article’s entire subject.
The surprise relative to consensus matters, rather than the figure alone. Article 6.3 explains the mechanism for individual reports, and article 6.4 its measurement and revisions. The following assumes familiarity with that material and asks a different question: what happens to entry price, exit price and pending orders when the information becomes public?
Four things that can change in the window
Around a release, spreads, execution distributions, ability to fill orders and contractual terms can change. We do not claim they always change or change in the same direction. Current quotes and documents are available before the decision; future fills require estimation. The following list distinguishes possible strategy consequences.
Costs can rise. In the illustration, spreads and adverse execution deviations increase. Entry spread can be observed before ordering; exit spread and both fills become known later. Full C concerns a completed trade rather than opening alone.
The mean does not describe the whole execution distribution. Changes in its dispersion and tails require data. Fixed table values serve sensitivity analysis; they are neither estimated means nor proof that tails grow faster than the mean at every release.
A stop-order level is an activation condition. Execution may differ from the level outside releases too. Quoting interruptions can enlarge that difference; section 4 explicitly assumes one. A limit order has a different property: it constrains price but does not ensure a fill.
Some rules become infeasible for contractual reasons. Some brokers’ terms include provisions on release-window trading or minimum pending-order distance from current price. A prohibited rule has no executable parameters to calculate; check these terms before specifying the rule, using the comparison criteria in section 11.
What remains unchanged
The list of things unaffected by the window is shorter, but worth retaining: many errors in this topic attribute effects to the window that it does not have.
E arithmetic remains the same, although more than C can change: closure proportions, post-fill distances and executed-position counts can change too. Assess results net of costs with uncertainty. High win rate alone does not determine the result.
Expected value net of full costs is a basic outcome measure, but not a complete assessment. Estimate uncertainty, distribution and extreme closures, data scope and feasibility also matter. Profitable-trade percentage cannot replace these. The release window can change each through the signal set and execution.
One release can show the path and execution of that particular decision. It does not reliably estimate general rule effectiveness or the frequency of large deviations. Event counts for a given precision must be considered with distribution and dependence; section 3 does this for an explicit model without establishing a minimum for all news trading.
A window needs both boundaries
“I do not trade around important data” is not a rule because readers interpret it differently: one excludes fifteen minutes before release, another an hour, and another regards data as important only once it surprises. Article 8.1 describes decidability and its test; article 8.4 incorporates a window into a trading-day rule. Here we need its consequence for the calculation.
The phase diagram assumes costs 1.0, then 9.8, then 3.8 and 1.0 again. This illustrates time variation without measuring speed or monotonicity. An actual spread returning to its earlier level does not establish that execution conditions have also returned.
Two further items are needed to make both boundaries usable: the covered-release list and the time source with server-time conversion. The first is a closed enumeration rather than a calendar colour reference, since impact classifications differ between services and can change. The second is necessary because release time uses the source’s zone while the rule operates on server time. Section 4 explains conversion mechanics and article 8.4 the effects on a daily rule.
These three specifications allow the two-reader test to be passed. Their absence becomes evident later rather than during trading: attempting to calculate from the records reveals that window trades cannot be distinguished from outside-window trades, precisely the distinction underpinning this entire article.
Scheduled and unscheduled events
A calendar window needs an announced time around which boundaries are set. A reactive window can start from detecting an unscheduled event through a specified source and condition; its end also needs defining. These are distinct constructions: the latter anticipates no earlier event time and does not remove existing exposure. The calculations below assume the calendar version.
Events announced by date but without an exact time can receive a broader exclusion. A longer pause reduces eligible-entry time; missed-signal counts need not rise proportionally with duration. Such a calendar cannot exclude unscheduled events.
An unscheduled event cannot be excluded beforehand by a calendar. Conduct from detection onwards can be defined, including suspending new entries and handling existing positions. Such a rule guarantees no protection from the first move, information delay or execution. Section 8 distinguishes information available before the event from descriptions afterwards.
The valid claim is narrower: no positions and no orders capable of opening them during the excluded interval remove that rule’s exposure in that interval. Merely prohibiting new entries does not remove existing-position exposure. Unscheduled events can occur outside windows; this illustration does not identify their share.
Scroll the diagram horizontally or open it at full size.
2. Entry costs in the release window
Fixed C is a model; accounting retains every fill
Mean cost across the sample need not be the cost of each closure type. If a target uses a limit while a protective level or window end uses a market exit, category costs and proportions may differ. The mean result then uses category results with their weights. With only two categories and costs Cw, Cs, E = p(W − Cw) + (1 − p)(−L − Cs). For fixed category costs, the threshold is (L + Cs) / (W − Cw + L + Cs). We do not insert 9.8 as a purportedly observed mean; it is the previously assumed scenario parameter.
This explains why a single C for all closures needs an explicit assumption. Lower costs on filled limits do not determine the construction’s result: non-fills and changed closure proportions remain. Conversely, a few expensive stops do not justify assigning their costs to every trade. Complete records show distribution and weights rather than selecting a convenient mean from one category.
In the table,9.8 includes both trade legs relative to mid. In the actual-Ask-fill example, C′ =4.3 contains only subsequent costs. Comparing such numbers requires stating what is already embedded in the price difference. A useful check accounts for the same closure both ways: actual fills plus commission, and reference price plus all deviations. Agreement checks the arithmetic rather than which method gives a more attractive threshold.
Round-trip costs use the same price basis inside and outside the window. Entry spread and commission terms are available before instruction; future exit spread and execution deviations remain estimates. Distributions and closure proportions can differ, not just nominal values. Section 2 describes component mechanics; here we compare two explicit scenarios.
Assumptions. Instrument EUR/USD. One pip is 0.0001. A long position opens at market and closes through a pending order on either side. MetaTrader 5 documentation describes candles built from Bid or Last depending on instrument; the optional Ask line is not historical Ask candles. This illustration uses Bid/Ask quotes and opens a long at Ask.[1] All following cost parameters are illustrative values chosen to show the mechanism. They quote no instrument specification or broker’s terms and require replacement with your own inputs. Result status: illustrative example, rather than a data-test result.
| Component | Outside the window | Inside the release window | When known |
|---|---|---|---|
| Spread — relative to mid, half the entry spread plus half the exit spread | 0.2 pips | 2.5 pips | Entry spread before instruction; exit spread only at exit. Both spreads assumed equal here. |
| Commission — both legs combined | 0.3 pips | 0.3 pips | Before the decision, from account terms |
| Entry slippage | 0.2 pips | 3.0 pips | After execution |
| Exit slippage | 0.3 pips | 4.0 pips | After execution |
| Total C | 1.0 pips | 9.8 pips | — |
Calculation. Outside: C =0.2 +0.3 +0.2 +0.3 = 1.0 pips. Inside: C =2.5 +0.3 +3.0 +4.0 = 9.8 pips. Window premium:9.8 −1.0 = 8.8 pips.
Information availability and execution model. A long opens at Ask and closes at Bid; a short opens at Bid and closes at Ask. Main tables measure movement in mid = (Bid + Ask) /2 before costs, so spread cost is half the entry spread plus half the exit spread. Equal spreads give one full spread per round trip. Commission 0.3 pips covers both legs; its constancy is an illustrative assumption. Slippage relative to the relevant quote is estimated. With actual fills and specific Bid/Ask levels, spread or slippage already embedded in prices is not added to C again.
Result and interpretation. In these scenarios C differs 9.8-fold with other comparison assumptions fixed. This does not measure a difference between particular market minutes. We next relate C to W and gross E to assess required movement. Caveats: fixed execution deviations do not represent the whole distribution, and financing is omitted assuming no position at accrual time.
The window premium expressed differently
The 8.8-pip difference is hard to assess without a benchmark, and the nearest is alongside it: the same rule costs 1.0 pips outside the window.9.8 ÷1.0 =9.8 means one release-window trade costs almost ten trades with the same rule outside it; the window premium alone,8.8 ÷1.0, costs almost nine.
This conversion is not rhetoric but answers a question requiring explicit consideration when designing a rule: should one window entry deliver as much as ten outside entries? “Unknown” is not yet an argument against the rule, but an argument for calculating versions separately before launch and comparing expected values rather than movement ranges alone.
Here C’s target share rises from 4.0% to 39.2%. Even 4.0% can determine the sign of a rule with a small gross edge, so alongside C / W we compare C with gross E. Article 8.3 gives a similar short-target calculation.
The same cost against four movement ranges
Movement range is the denominator here, so changing it changes everything despite unchanged costs. The table shows four lengths at window cost 9.8 pips and a protective exit equal to the target.
| Assumed target W (= protective exit L) | Window cost C (illustrative values) | C / W | Movement needed to retain W net | Break-even win rate p* |
|---|---|---|---|---|
| 15 pips | 9.8 pips | 65.3% | 24.8 pips | 82.7% |
| 25 pips | 9.8 pips | 39.2% | 34.8 pips | 69.6% |
| 40 pips | 9.8 pips | 24.5% | 49.8 pips | 62.3% |
| 60 pips | 9.8 pips | 16.3% | 69.8 pips | 58.2% |
C / W at 15.25.40 and 60 pips is 65.3%,39.2%,24.5% and 16.3% respectively. W + C shows reference movement needed for a specified net outcome. It does not automatically move an existing system’s gross target: net 15 at C =9.8 would require 24.8 pips of movement, whereas an exit at 15 would produce 5.2 net.
At an illustrative 15-pip target, C =9.8 is 65.3% of the target. This compares cost scale with a short move, rather than claiming how frequent such rules are or identifying the most expensive minute of an actual day. Correctly identifying direction does not ensure a positive result if available execution and costs consume the move.
The movement range is an assumption, rather than data
Table W is an assumed target distance, rather than a forecast or measurement. Actual assessment can use conditional outcome means from records if categories, costs and price basis are defined. Range distributions can also be estimated from an explicit sample. These are three different quantities: exit parameter, observed outcome and estimated movement. Substitution alone verifies none.
Article 7.6 explains expected-move pricing from options; that is not the only way to describe historical ranges. This lesson assumes W to analyse costs and thresholds without forecasting that the target will be reached. Actual closure means assess the rule empirically. Quantities are not interchangeable merely because both are in pips.
If W or other parameters were estimated from previous releases, disclose the event list, period, measurement and selection rules. A sample chosen beforehand by dates or report type is not automatically outcome-selected. Choosing only memorable large moves is a different procedure and can overstate assessment. One event informs us about itself but says little about the population. Data status and scope remain part of the assumptions.
Notice the direction in which mistakes change conclusions. An overly optimistic range understates relative costs and the threshold, making a rule appear feasible when it is not. The opposite error abandons a rule that might work; its cost is real but invisible because it never enters the records.
Where to obtain your own inputs
9.8 pips is assumed rather than measured, and describes no particular broker or release. Each component depends on different factors and changes at a different rate during the window: spread on instrument, release and minute; commission on account terms; both slippages on movement at execution. Giving one universally valid number would be fabrication rather than simplification.
Your own estimate needs timestamped quotes, instructions and fills. Execution deviation compares a fill with the relevant Ask or Bid at order time; delay separately compares that price with the signal price. Completed-trade prices alone cannot reconstruct these components. Assign data to a particular instrument and event.
Three features distinguish this measurement from outside-window measurement. First, observations are sparse: a given release type may occur a dozen or so times annually, so collecting that many values takes a year rather than a week. Second, large dispersion gives a broad estimate interval from a dozen observations; section 3 illustrates the scale. Third, quantities depend on release type, so averaging different events combines things that should be assessed separately.
Until measurement is performed, these calculations describe a mechanism rather than the reader’s circumstances. This substantial limitation cannot be bypassed by adopting the text’s numbers: they solely demonstrate how outcomes change when a parameter rises by an order of magnitude.
The same costs over a rule’s year
An individual trade’s cost can be dismissed because 9.8 pips sounds inconsequential. Annual aggregation adds nothing to the arithmetic—multiplying by trade count changes no ratio—but shows the scale at which the same number begins to determine results.
Assumptions. One trade in each of eight release windows per month,96 per year—an illustrative value. Target and protective exit 25 pips each, win rate 60%, costs as above. Result status: a conditional scenario with specified trade count, rather than a forecast.
Total costs. Inside:96 ×9.8 = 940.8 pips annually. The same trade count outside:96 ×1.0 = 96.0 pips. Difference: 844.8 pips.
Relative to gross outcome. Gross expected value at 60% win rate with symmetric distances is 0.60 ×25 −0.40 ×25 =5.0 pips per trade, or 96 ×5.0 =480.0 pips annually. Window costs are 940.8 ÷480.0 = 196.0% of that figure, and outside-window costs 96.0 ÷480.0 = 20.0%.
Net outcome. Inside:480.0 −940.8 = −460.8 pips annually. Outside:480.0 −96.0 = +384.0 pips. Difference:384.0 − (−460.8) =844.8 pips, exactly the cost difference, since win rate, range and trade count are unchanged.
Information availability and execution model. N=96 and p=60% are scenario assumptions that can be entered before testing. Actual signal/fill counts and closure frequencies come from records. A rule may also cap entry count, without guaranteeing that cap is used. The annual sum assumes fixed per-trade accounting and a specified fill count.
Result and interpretation. The cost-to-gross-outcome ratio is identical annually and per trade because multiplying both by the same number leaves it unchanged. Its interpretation changes:196% means the rule earns roughly half, before costs, of what it spends on costs. Caveats: this is a conditional scenario with a specified count rather than a forecast; equal inside/outside win rate is an assumption rather than a finding, relaxed in section 7.
The last caveat is most important and returns as a separate question. Equal win rates conveniently isolate costs, but are also the hardest assumption to defend in practice. Release-window movements differ in range and path from outside movements, so the rule can win more or less frequently inside; both remain possible until measured.
3. How those costs change break-even win rate
What a planned observation count means
577 results from specific assumptions:50-pip outcome range, p =60%, independence and a normal approximation for the interval half-width. It is not the minimum required release count for all news trading. Different distributions, effect sizes or dependence imply different requirements. Planning scale before testing is useful precisely because it shows whether expected data arrivals can provide the required precision.
Once data are collected, assessment centres on the observed result. Assumed E =−4.8 does not become a sample mean merely because a year passed. Nor does N =12 determine uncertainty width without a distribution: actual costs, time closures and varying volumes can differ from the two-point model. Exact 95% coverage must not be announced merely because SE was multiplied by 1.96.
Several positions around one release require two record levels: events and executions. Examine dependence within an event and between releases separately. Adding report types increases the count but requires defining the assessed population. An average across reports can validly describe the full version using that list, without proving identical edge for each report. A correctly specified mixture need not be discarded; its composition must be known.
In the two-point model, p is the probability of closure at +W before costs, rather than any arbitrary net-profit percentage. Threshold p* gives E =0 after costs. If C ≥ W, a target-side closure may not be net positive. Retain the outcome-category definition in every substitution.
Expected value per trade in price units, where W and L are quantities before costs and C is full mean round-trip cost:
E = p × W − (1 − p) × L − C
p is the proportion in the +W category before costs, L the magnitude of category−L and C a fixed round-trip cost; every outcome is in pips. Conditional means of actual net results must not have full C deducted again. Setting E to zero gives:
p* = (L + C) / (W + L)
The formula has two recurring properties. Its denominator is the sum of both distances and does not depend on costs. Its numerator rises linearly with costs, so a cost increase raises the threshold by exactly ΔK / (W + L), regardless of the original threshold.
Assumptions. EUR/USD, target W =25 pips, protective exit L =25 pips, both measured on reference mid before costs. C =1.0 pips outside and 9.8 inside, from section 2—illustrative values. Result status: illustrative example.
Calculation. Cost-free: p* = L / (W + L) =25 /50 =0.500 = 50.0%. Outside: p* = (25 +1.0) /50 =26.0 /50 =0.520 = 52.0%. Inside: p* = (25 +9.8) /50 =34.8 /50 =0.696 = 69.6%.
Increment check. Δp* = ΔK / (W + L) =8.8 ÷50 =0.176, or 17.6 percentage points. Added to 52.0%, this gives 69.6%; both methods agree.
Before the decision, rule parameters, current spread and commission terms are known. Future spread and execution are estimates. The threshold is conditional rather than a universal lower bound, because deviations can be favourable. The two-point model omits intermediate closures, needed in full assessment.
Result and interpretation. Moving this rule from ordinary conditions to the release window raises required win rate 17.6 percentage points. A rule needing to win slightly more than half the time outside needs about seven wins in ten inside, with both distances and entry logic unchanged. Caveats: the threshold is a necessary condition for positive expected value under the assumptions, rather than an edge criterion; section 9 explains the distinction.
Three window-cost levels
Window costs are not one number identical at every release or minute. The table assumes three levels—mild, the main calculation’s assumed level and severe—with target 25 pips and symmetric protective exit unchanged.
| Level | Spread / commission / entry slippage / exit slippage | C | C / W | p* | E at 60% win rate |
|---|---|---|---|---|---|
| A — mild window | 1.0 / 0.3 / 1.0 / 1.5 | 3.8 pips | 15.2% | 57.6% | +1.2 pips |
| B — assumed level | 2.5 / 0.3 / 3.0 / 4.0 | 9.8 pips | 39.2% | 69.6% | −4.8 pips |
| C — severe window | 5.0 / 0.3 / 6.0 / 8.0 | 19.3 pips | 77.2% | 88.6% | −14.3 pips |
Every quantity is illustrative. Thresholds substitute into (25 +3.8) /50 =0.576; (25 +9.8) /50 =0.696; (25 +19.3) /50 =0.886. The final column substitutes into E at p =0.60: E =0.60 ×25 −0.40 ×25 − C =15.0 −10.0 − C =5.0 − C, giving +1.2;−4.8;−14.3 pips.
The table shows E changing from +1.2 to −4.8 when C increases 6.0 pips with other parameters fixed. It does not measure the difference between calm and abrupt releases. This sensitivity indicates the cost that can change the conclusion and what needs estimating before assessment.
The same fragility appears in another ratio. Gross E at 60% win rate with symmetric distances is 5.0 pips per trade. Relative costs are 3.8 ÷5.0 =76.0% at A,9.8 ÷5.0 =196.0% at B and 19.3 ÷5.0 =386.0% at C. Even the mildest version consumes three quarters of gross earnings, and only that version remains positive.
Scroll the diagram horizontally or open it at full size.
When the protective exit is not symmetric with the target
All calculations so far assume L = W, simplifying arithmetic and obscuring a formula property worth showing separately. Cost-induced threshold increase is C / (W + L), depending on the sum rather than ratio of distances. Shortening the protective exit improves the gain-to-loss ratio while reducing the denominator, so the same cost raises the threshold by more percentage points.
| Protective exit L with target W =25 pips | Gain-to-loss ratio | p* without costs | p* with window cost 9.8 pips | Increase in percentage points |
|---|---|---|---|---|
| 10 pips | 2.50 | 28.6% | 56.6% | +28.0 |
| 15 pips | 1.67 | 37.5% | 62.0% | +24.5 |
| 25 pips | 1.00 | 50.0% | 69.6% | +19.6 |
| 40 pips | 0.63 | 61.5% | 76.6% | +15.1 |
Substitutions: at L =10, the denominator is 35, so cost-free p* =10 /35 =0.2857 and cost-inclusive p* = (10 +9.8) /35 =19.8 /35 =0.5657; increment 9.8 ÷35 =0.280. At L =40, the denominator is 65, so cost-free p* =40 /65 =0.6154, with costs 49.8 /65 =0.7662 and increment 9.8 ÷65 =0.151. All values remain illustrative.
In row one, L=10 and C=9.8 give −19.8 pips net, nearly twice the stop distance in the mid model. This specifically compares costs with planned price loss, rather than defining loss as a fraction of capital or showing every short-stop rule has high risk. The capital dimension requires position size; actual outcomes require appropriate fills and fees.
A tighter L increases the cost-induced threshold increment C / (W + L), but does not automatically raise the full threshold. At fixed W and C, the derivative of p* with respect to L is (W − C) / (W + L)². When W > C, reducing L still reduces p*: the table gives 56.6% at L =10 and 76.6% at L =40. Threshold arithmetic alone does not decide the choice, since actual win rate and exit distribution can change with L.
Scroll the diagram horizontally or open it at full size.
How many releases are needed to reach a conclusion?
The threshold gives the required win rate, rather than the time needed to establish whether it is achieved. Here the latter question can matter more, since a given release type occurs a dozen or so times annually, rather than hundreds.
Assumptions. One trade only around one recurring monthly release, twelve per year—an illustrative input. Two-point outcomes: +15.2 pips (25 −9.8) or −34.8 pips (−25 −9.8), range 50.0 pips. Win rate p =0.60. Independent observations assumed, a simplification discussed below.
Expected value. E =0.60 ×15.2 −0.40 ×34.8 =9.12 −13.92 = −4.80 pips per trade, matching level B above.
Standard deviation of an individual outcome. For the two-point distribution, s = range × √(p × (1 − p)) =50.0 × √(0.60 ×0.40) =50.0 × √0.24 =50.0 ×0.4899 = 24.49 pips.
Standard error for 12 independent events. SE = √600 / √12 = √50 ≈ 7.071 pips. An illustrative normal band would have half-width 1.96 × SE ≈ 13.86 pips. This is not an interval from an actual sample; at N =12 the normal approximation does not support claiming exact 95% coverage.
How many for a 2-pip standard error? With s =50 × √(0.60 ×0.40) = √600 ≈24.49 pips, N = (s /2)² = 150 observations, or 12.5 years at twelve annually. This is not the half-width of a 95% interval. For illustrative 1.96 × s / √N to be at most 2 pips requires N ≥ (1.96 × s /2)² =576.24, hence 577 observations, about 48.1 years. A fixed distribution and independence are assumed; this compares uncertainty scale rather than proposing a sensible half-century testing plan.
Uncertainty scale can be planned before testing using explicit model parameters. Empirical estimation requires observed outcomes. In the two-point model, range W + L =50 does not depend on fixed C; variance also depends on p.
Interpretation. At N =12, model standard error 7.07 pips exceeds assumed |E| =4.8. Normal half-width approximation 13.9 pips shows uncertainty scale but ensures no exact 95% coverage for such a small sample. A positive mean alone cannot confirm an edge. Actual execution, non-entry and intermediate exits change the distribution; each need not individually increase variance.
Successive releases can share market conditions, but event-type similarity alone does not establish positive outcome correlation. Dependence and regime changes must be examined. Several trades around one release are not automatically several independent events: record releases and fills separately. Article 8.2 discusses uncertainty measures for dependent observations.
A longer release list can provide events faster but changes the population. Separate categories and the aggregate version with explicit weights can be reported; do not pretend all events are interchangeable.577 observations illustrates one model’s scale rather than proving no single-release rule can be assessed in useful time.
4. Pending orders and quoting discontinuity
Ordering and non-execution are part of the scenario
For two entry orders, record the whole release outcome: no fill, one fill or two before confirmed cancellation. In the latter case costs and exposure depend on actual fills; a test must not invent that the opposing order “must have disappeared”. This follows necessarily from the construction rather than instructing platform configuration.
Order type determines the specified level’s meaning. For stop-market it activates a market instruction; for a limit it constrains price while leaving non-execution risk. Section 2 describes the differences. The example assumes stop-market and a specific Ask fill to calculate new distances to fixed exit levels; it does not describe every pending order.
Fill deviation can occur with continuous quotes too: timing, available quantity and execution terms matter. An interruption or jump across a level can enlarge the difference, without determining its size or sign in every case. Missing intermediate quotes and an adverse fill are explicit assumptions here. Measurement distinguishes activation level, quote at activation and fill.
Assumptions. EUR/USD, pip 0.0001. Pre-release quote 1.08500 /1.08502, spread 0.2 pips. A pending buy activates at 1.08600, roughly ten pips above pre-release Ask. Target and protective exit are specified as prices:1.08850 and 1.08350.25 pips from activation. After release, last quote before interruption is 1.08540 and first available subsequent Ask 1.08760. Costs follow section 2, level B—illustrative values. Result status: illustrative example, rather than an actual trade record.
Calculation. Crossing 1.08600 activates the order; execution occurs at first available 1.08760. Shift:1.08760 −1.08600 =0.00160 = 16.0 pips.
- Post-fill target distance. W′ =1.08850 −1.08760 =0.00090 = 9.0 pips, rather than 25.
- Post-fill protective distance. L′ =1.08760 −1.08350 =0.00410 = 41.0 pips, rather than 25.
- Sum. W′ + L′ =9.0 +41.0 =50.0 pips, exactly as before execution.
- Gain-to-loss ratio. Specified:25 ÷25 =1.00. Actual:9.0 ÷41.0 = 0.22.
Break-even win rate. Nominal 25/25 distances without costs gave 50.0%. After actual Ask fill 1.08760, distances to fixed Bid exit levels are W′ =9 and L′ =41 pips, so the threshold before further fees is 41 /50 = 82.0%. Entry spread and fill deviation are already embedded. Remaining C′ = round-trip commission 0.3 + assumed sale slippage 4.0 = 4.3 pips. Thus p* = (41 +4.3) /50 = 90.6%. Uniform exit slippage assumes market-executed exit signals, rather than a limit take-profit model.
Activation and fixed Bid levels are known before release; Ask fill after entry. The example assumes no intermediate quotes and fill 1.08760, rather than guaranteeing every stop order that price. W′ and L′ already contain entry Ask against exit Bid, so C′ =4.3 includes only commission and assumed exit deviation.
Result and interpretation. After entry execution the assumed distances are no longer symmetric. At illustrative 60% win rate, E =0.60 ×9 −0.40 ×41 −4.3 = −15.3 pips. Fill check: target signal 1.08850 with 4-pip sale slippage gives 1.08810, a 5-pip price gain less 0.3 commission = +4.7. Protective signal 1.08350 gives sale 1.08310, or −45.3 net. Then 0.60 ×4.7 −0.40 ×45.3 also gives −15.3. These are illustrative parameters, rather than measured release data.
The sum invariant and its consequences
With fixed target price G and stop price B, algebraic long distances are W′=(G−F)/pip and L′=(F−B)/pip, so W′+L′=(G−B)/pip independently of F. Both are positive magnitudes only when B<F<G. Outside that interval at least one changes sign, requiring the original two-point scenario to be resolved again. The invariant is not the sum of absolute distances for any arbitrary fill.
An adverse shift d with fixed exits raises the threshold by d / (W + L), and a favourable shift reduces it equally. After stop activation, price can continue in either direction. The example’s adverse fill is assumed; activation price must not be equated with guaranteed execution.
The illustrative buy stop activates when Ask exceeds the level. This defines the condition, rather than the sign of every subsequent fill deviation. Measurement needs the activation quote, instruction time and actual fill. Section 2 discusses order types.
Boundary case: the target passed before execution
The 16-pip execution shift left the target ahead of the position, albeit closer than specified. Nothing guarantees this always happens: the shift can exceed target distance, putting the rule into a state its designer usually failed to anticipate.
With unchanged levels and first available 1.08900, the shift is 1.08900 −1.08600 =0.00300.30.0 pips. Target distance then W′ =1.08850 −1.08900 = −5.0 pips, protective distance L′ =1.08900 −1.08350 = 55.0 pips. The sum remains −5.0 +55.0 =50.0 pips because the algebraic invariant also holds with a negative component.
At hypothetical Ask fill 1.08900, original target Bid 1.08850 is 5 pips below entry and protective 1.08350 is 55 pips below. This invalidates the meaning of “gain 25, loss 25”. Those levels do not reveal how the platform accepts or activates orders after the target is passed, or at which price it closes. A pre-specified response to the obsolete scenario is needed, rather than mechanical substitution yielding a spurious win rate above 100%.
This is neither purely theoretical nor an argument against pending orders. It is a case the rule must resolve; otherwise the market path resolves it, leaving a trade that fits neither planned outcome category.
Scroll the diagram horizontally or open it at full size.
Levels as prices or distances
An alternative specifies target and protective exit as distances from execution rather than predetermined prices. Choosing between these constructions has clear consequences on both sides, requiring a decision before the first trade rather than after a surprising fill.
At 25-pip distances from actual Ask fill, Bid sale signals would be 1.09010 and 1.08510. After remaining cost 4.3, the threshold is (25 +4.3) /50 = 58.6%. This is a different rule: exits moved with entry and need separate justification and testing. Its threshold must not be compared with the main mid model’s 69.6% as though their price bases were identical.
Justifying levels belongs to rule logic: a hypothesis about a particular level may require fixed-price specification, while distances from fill require a different definition. These versions are not interchangeable. They may coincide at a particular fill, but not merely because a trade occurs outside a release window.
Invalidation based on execution
A third option adds a condition concerning execution quality rather than market price: if fill deviation from the level exceeds a specified amount, close immediately regardless of target and protective levels.
Immediate closure also costs. At current Ask 1.08760 and Bid 1.08735, the quote difference is 2.5 pips. If purchase actually filled at that Ask and sale occurs 4 pips below Bid, result =−2.5 −4.0 −0.3 = −6.8 pips. Spread is correctly included because this compares a fresh Ask/Bid pair rather than distances to earlier fixed Bid levels. The illustration shows closure cost, rather than proving the selected abandonment condition improves whole-rule performance.
Fill-quality assessment needs a reference level, correct quote side, instruction and execution times. Invalidation exit is a separate closure reason because its distribution may differ from other categories; the label alone does not establish that. The mean of all closures validly describes the full version when scope and weights are explicit; categories reveal contributions and exit-reason cost dependence.
An order filling only at the specified price or better
All calculations above concern threshold-activated orders seeking the first available price after activation. A rule can instead use a price limit that by construction excludes worse fills. Section 2 describes order types; one consequence matters for strategy and becomes apparent around releases.
A limit constrains adverse fill price but does not ensure execution. Filled-order selection may depend on price path and available liquidity. Without data we do not know which paths are omitted most often or whether their hypothetical outcomes would be positive. Report outcomes per execution and per event separately.
With illustrative 20 events,12 filled entries and 8 non-fills, execution rate is 60%. The mean of twelve describes filled positions. For monetary outcome per event, eight cases without a position contribute zero if no other costs arise; hypothetical outcomes under another order type remain unknown. When the limit is part of the rule, fills are its actual selection mechanism rather than a “wrong” rule. Comparison with an always-filled version requires data capable of modelling it.
Report rule evaluations, signals, instructions, fills and closures separately. With at most one position per signal an appropriate count inequality applies. Two orders or partial fills can create more executions than signals, so define the counting unit. Article 8.4 separates assessments and trades; here whole release events are also counted. A fill is not automatically one position or an event one round trip.
Ordering within a candle
The previous example assumed known entry and one of two closures. A candle can contain both levels without showing which occurred first after entry. The frequency of ambiguity is unknown without a specific sample and quote side. OHLC supplies no missing chronology; explicitly state how outcomes are bounded.
Assumptions. The same trade: fill 1.08760, target 1.08850, protective exit 1.08350. The release minute opens 1.08500, reaches high 1.08920 and low 1.08210, and closes 1.08640—illustrative values. OHLC data contain no intrainterval path.
High 1.08920 exceeds target Bid 1.08850 and low 1.08210 is below protective Bid 1.08350. This concerns the whole Bid candle, rather than proving both levels were reached after the Ask fill. Chronology and the Ask path are absent, limiting the conclusion.
Two conditional closures after a known fill. A post-entry target gives +9 −4.3 = +4.7 pips; a protective signal −41 −4.3 = −45.3 pips. Range 50 pips. The candle alone does not establish both levels after entry: its low may precede it, and Bid candles omit the Ask path activating the purchase. Only once entry and quote side are established can these scenarios bound the result.
Chronology can remain unknown from OHLC alone. Show the range permitted by the data or an explicit conservative scenario. Removing ambiguous cases gives a subset-conditional result rather than the whole rule’s result and must not be presented as the latter. Set conventions before testing and disclose case counts.
Result and interpretation. Unknown ordering can be large relative to sample E, depending on disputed-case count, outcome range and sample size. We illustrate 12 of 80 without attributing that proportion to actual releases. Tick data can help if they cover the period, appropriate quote sides and true chronology; the format alone ensures no realistic execution model.
At 12 ambiguous cases out of 80 with 50-pip range, possible means span 12 ×50 /80 = 7.5 pips. This assumes both post-entry closures are genuinely admissible for each disputed case. It determines no real-release frequency. Width exceeds |model E| =4.8, so ordering uncertainty cannot be ignored here.
This concerns specified ambiguity rather than every OHLC test. If admissible outcomes straddle the decision boundary, the data do not resolve that decision. Complete timestamped Bid/Ask can narrow uncertainty, but “tick” alone ensures neither coverage, correct side nor realistic fills. Article 8.9 states testing requirements.
Partial fills and order rejection
Non-execution and partial execution are separate statuses. Their frequency is unknown without instrument-, release- and order-specific data. The recording consequence is that signals, orders and actual positions need distinct counts. Section 2 describes order mechanics and section 11 account terms.
Partial fill changes volume. The pip threshold stays unchanged only with proportional fees and unchanged execution distribution; minimum commission can alter C. Record actual volume separately from full-fill status. An aggregate mean requires explicit weighting.
Rejection creates no completed-position result and is excluded from the per-filled-position mean. It remains a rule event, contributing zero per event if no other costs arise. These denominators answer different questions. A fill-only report can validly describe fills but cannot pretend to describe every evaluation.
A rejected order produces no position outcome but remains a rule event. Without other costs it contributes zero per event. Rejection reasons may depend on market or order conditions; no relationship with hypothetical outcomes is assumed without data. Filled-position means describe executions rather than a guaranteed-fill version.
Both cases follow one principle: count events rather than only outcomes. Records need rule evaluations, submitted orders, full fills, partial fills and rejected orders, reported alongside results rather than replacing them. Without these five counts, expected-value claims concern a subset selected by an unspecified condition.
A protective exit does not guarantee a price
This section rests on a distinction worth repeating because it produces costly misunderstandings. A protective level is a rule rather than a guaranteed price. Reaching it triggers an order executed at the first available price, whose distance from the level depends on quote continuity at that time.
An ordinary stop level specifies an exit-trigger condition rather than guaranteed price or outcome, outside releases too. The 16-pip entry shift illustrates scale rather than proving an identical exit distribution. Section 11 covers exceptional guaranteed-order terms.
Main-scenario L is an assumed mid-price movement before costs. Empirically it can denote conditional mean loss magnitude with a clearly defined category and gross/net basis. Net data must not have fill-embedded costs deducted again. Record-based thresholds can differ in either direction depending on exits and costs; release occurrence alone determines no difference.
5. Four approaches and where each can fail
Two fills are an event outcome, rather than two assured halves
Opposing-order constructions can produce zero, one or two positions per release. Requesting cancellation does not prove the second fill never occurred. An event must not be reconstructed as “the first direction chooses the trade” unless activation, fill and cancellation-confirmation times are known. This assesses the whole construction rather than teaching OCO operation.
Two opposing positions do not automatically give a neutral result. They may open at different times and prices, each with fees and closures. At fixed costs two round trips consume 19.6 pips; this does not make the whole-event loss 19.6 because actual price outcomes must also be added. Hedging exposure direction at one time and accounting for the complete history are separate questions.
Compare outcomes per position and per release. More trades alone do not mean more independent events. A second-fill version can change costs, aggregate outcome and extreme-outcome distribution, without its direction being inferable merely from opposing orders.
Release-trading approaches reduce to four constructions differing in entry timing relative to the figure. These are design versions rather than recipes, each with an explicit assumption, invalidation condition and execution failure point. The fifth row abstains from window trading; it belongs because the same three assessment criteria apply, developed in section 7. The final column is most important because it contains what charts do not show.
| Approach | Assumption | Invalidation | Where execution fails |
|---|---|---|---|
| Pending orders on both sides Two opposite-direction orders submitted before release |
The move is sufficiently large and one-sided for the filled side to reach its target before the opposing side produces a loss | Two-way movement; movement smaller than order distance from price plus window cost; unspecified treatment of the opposing order | Activation during discontinuity moves execution away from the level and changes the gain-to-loss ratio (section 4); unrelated orders can create two positions, while linked-order cancellation depends on intrainterval chronology |
| Entry after direction is established Entry when a condition assessed after the release is met |
After the initial price adjustment, a slower second phase continues in the same direction and remains accessible to a manual decision | No second phase or a reversal; “direction is established” defined so it is recognisable only afterwards | A close-based condition is known only after the interval ends, so response price differs from signal price; section 6 converts that difference into a threshold shift. Spread has not yet returned to its pre-release level, invisible in a Bid-based calculation |
| Entry against the initial reaction A position opposite to the first move |
The first adjustment can overshoot and partially reverse | No reversal; no prior definition of “excessive”—a label after reversion describes an outcome rather than a rule | Entry may occur with elevated costs. Continued movement opposes the position; execution distribution and differences from other constructions require measurement. |
| Position held through the release A position opened earlier and carried through the window |
Direction was determined beforehand, or the position exists for a reason unrelated to the release | A release inconsistent with the assumption; a position carried through a window omitted from the rule | Entry cost comes from an earlier time. If exit occurs in the window, its spread and execution need separate assumptions; if holding continues, no exit cost is incurred in that window. |
| Abstaining from window entry Trading excluded between both boundaries |
The rule’s expected value is higher outside than inside | Signals concentrated around releases, so exclusion removes most of the assessed sample | No execution failure because no execution occurs; this does not protect existing positions, a separate case in section 7 |
Orders on both sides
Two opposing orders require no prior direction choice, but their result still depends on levels, paths, fills and second-order handling. Execution can differ from activation, without being independent of it. Section 4 shows one adverse fill. Assessing the whole construction needs both orders’ and closures’ chronology.
First, establish the second order’s status after the first fills: cancellation cannot be assumed before confirmation. OCO can leave two fills if the second precedes cancellation. OHLC does not establish ordering. Second, each order’s distances and price basis matter; costs depend on actual fills. Third, expiry needs defining: no activation during the window is a separate status, while remaining orders can open later. Records assess the whole event.
The last case is sometimes treated as no event, incorrectly. Orders left after the window activate later under different market conditions, unrelated to their original assumption. Without withdrawal instructions, the rule places pre-release orders and leaves them in the market rather than trading a defined release window.
Entry after direction is established
A same-direction second-phase hypothesis is testable once condition, entry time and costs are specified. Other constructions can also have assessable hypotheses. This article tests none; it presents comparison requirements and execution consequences.
Research describes jumps in conditional mean exchange rates following macroeconomic surprises and increased activity after releases.[2][3] A Federal Reserve working paper using EBS EUR/USD and USD/JPY data from 1999–2004 describes rapid mean adjustment and a later volume increase.[6] These are wholesale-market observations. They determine neither retail fill cost nor a profitable second phase.
“Direction is established” needs an observable definition and data source. It can use an interval close, a level or condition duration; article 8.7 discusses variants and section 5 tools. A stricter condition can delay or remove entries, but without definition and data we know neither whether entry occurs later, how much movement remains nor its cost. Comparison requires the complete new version.
Entry against the initial reaction
“Overreaction” can be defined before entry through a measurable distance, time or range threshold relative to a fixed reference. This specifies a reversion hypothesis without confirming it. Labelling only after a retreat describes a known outcome rather than an earlier available signal. Article 8.7 separates hypothesis and hindsight assessment.
An executable rule instead specifies a pre-entry measurable quantity: distance from pre-release price, a multiple of ordinary interval range or movement duration. Each gives a decidable rule; none makes it accurate, which data determine rather than specification.
Fading the first move can incur elevated costs, but is not inherently the most expensive approach: timing, quotes and exit decide. Further continuation opposes the position. Reversion needs an invalidation condition and evidence on its outcome distribution; no fixed win rate or regular small gains are assigned to the family. Article 8.7 discusses the three logics’ boundaries.
Position held through the release
Earlier entry and window exit create mixed costs: part of spread and entry execution come from before, exit components from the window. Full C=9.8 does not transfer to exit alone. Continued holding incurs no window exit cost yet. The illustration explicitly assumes exit in the window and accounts for both sides relative to mid.
This requires splitting spread into halves, as section 2 explains. Entry pays half pre-release spread,0.1 pips, and exit half window spread,1.25 pips, total 1.35 pips. Add commission 0.3, outside entry slippage 0.2 and window exit slippage 4.0. Total C =1.35 +0.3 +0.2 +4.0 = 5.85 pips, below 9.8 for a trade wholly inside but almost six times 1.0 for one wholly outside. At target 25 pips,5.85 ÷25 =23.4% of target and threshold (25 +5.85) /50 =30.85 /50 = 61.7%. These apply only if the position closes in the window. A position passing through without closure incurs none of this exit cost there, distinguishing carrying through from trading within it.
A position open at rollover can incur swap independently of releases. Such accrual changes costs and threshold and must not be treated as ratio-neutral. Article 8.5 explains multiple-accrual calendars and 8.6 longer horizons. This lesson’s numerical examples do not cross rollover.
A position passing through a window omitted from the rule is a separate case. This is a specification gap rather than an approach: the latter can be assessed, the former is incomplete. Section 7 explains how to address it.
What the four constructions share
Despite their differences, the first four rows share three features more important than what distinguishes them.
Each particular construction needs a hypothesis, but entry timing alone imposes no single hypothesis on an entire family. Two orders can serve different specifications, post-reaction entries different continuation conditions, and earlier positions logic unrelated to the release. Hypotheses can be estimated from data; this lesson does not test them. It shows the times, levels, statuses and costs needed to compare defined versions.
Every version needs separate entry and exit accounting. Both deviations may have different distributions and dependence; their size comes from timing and order conditions rather than the construction’s name. Earlier positions may exit in the window or later; post-reaction entries still incur costs on both sides. A quote chart is not a complete record of available fills.
Each construction can have an invalidation condition available before the next decision. This needs a precise definition rather than judging “excessive” or “established direction” after outcomes. All versions use the same specification-quality test. Outcome quality needs data, costs and uncertainty.
Combining two constructions in one window
Continuation and reversion can concern different horizons or conditional situations, so do not automatically conflict. If both signals compete simultaneously, the rule determines priority and permitted positions. Article 8.7 addresses logic boundaries. Here we assess costs and whole-event results when two round trips actually occur in one window.
At two full round trips with fixed illustrative C=9.8, costs sum 19.6 pips. Relative to one 25-pip benchmark this is 78.4%, less than 25; it proves no movement exceeding the assumed range. Event outcome is the sum of both positions’ price results less costs. Two trades can use different segments of the same path, so their required movements cannot be added to one candle’s range without specifying chronology.
Two entries around one release can share price path and execution conditions. Entering the second after a reversal does not determine outcome correlation. Negative correlation can reduce aggregate variance rather than increase it. The simpler conclusion is to assess whole-event results and event counts separately from orders. Article 8.2 discusses dependent observations.
6. Why this is not a speed contest
An exercise with three prices
Illustrative assumptions: signal Bid 1.08640, response Bid 1.08700, fixed spread 2.5 pips, buy slippage 3 pips, sale slippage 4, round-trip commission 0.3. Response Ask =1.08725, Ask fill =1.08755. Bid sale signals stay 1.08890 and 1.08390. Exit fills 1.08850 and 1.08350 give net +9.2 or −40.8 pips. E at 60% =0.60 ×9.2 −0.40 ×40.8 = −10.8. Distances from response Bid give the same result: W′ =19, L′ =31, C =9.8. The 6-pip signal–response difference is not added again to C because distances already contain it.
The idea that release trading is about pressing a button first is mistaken in two distinguishable ways. One concerns how quickly price adjusts to the figure. The other concerns the consequence for rule design; this has practical implications, since the first observation alone gives no advice.
IFDP 823 describes rapid adjustment of mean exchange rates after selected US releases in a historical EBS sample.[6] A later Chaboud, Chernenko and Wright article’s abstract identifies increased volume even after expected figures.[3] These findings are not extended to every release or particular retail fill.
One conclusion follows, while several do not. Part of the direct reaction to the number occurs on a timescale in which manual decisions do not participate. This does not establish that remaining movement is absent, cannot be exploited or that a slower response is inherently late. Nor, a particular trap here, does it establish that becoming faster is the solution.
Modelled delay and available execution
Reaction delay can be an explicit test-model and sensitivity parameter. Actual data availability and order-delivery time must justify its value. Here we compare price consequences; environment configuration belongs to section 12.
“I will enter before the market adjusts” specifies no available information, order time or price. Defining them enables feasibility assessment. Remaining-movement hypotheses still need measurement; precision of wording does not establish movement sufficient to cover costs.
The consequence goes beyond wording. A slower-phase rule’s test must use its specified entry time rather than release time; the price available then rather than merely a chart price; and window costs at that time rather than outside costs. Each requirement is sometimes omitted, and omitting any one is enough to make the test describe a different rule.
Signal and response prices
Separating signal and response applies throughout the section, but their difference is particularly large around releases. A close-based signal arises when the interval ends; ordering is possible only afterwards, with execution later still. Price can move by a substantial target fraction meanwhile. The calculation below quantifies this.
Distinguish signal on a specified quote side, order submission and fill. Signal-to-response-quote movement represents response delay, while deviation from the relevant Ask/Bid at order time represents execution deviation. Both can share conditions, so statistical independence is not assumed. Changing assessment or execution assumptions can alter both distributions. Record them separately to avoid counting a price path twice.
Assumptions. EUR/USD, pip 0.0001. The rule uses “entry after direction is established” from section 5: a minute closes above a reference level, then a market buy is submitted immediately. Signal price, the Bid candle close, is 1.08640, matching section 4’s intrabar example. Response price, first available subsequent Bid, is 1.08700. Target W =25 pips and protective exit L =25 pips are measured from signal and specified as prices, so W + L =50.0 pips. Cost C =9.8 follows level B in section 3. All quantities are illustrative. Result status: illustrative example rather than an actual trade.
Calculation. Response minus signal: d =1.08700 −1.08640 =0.00060 = 6.0 pips,6.0 ÷25 = 24.0% of the assumed target, before adding any cost.
- Post-response target distance. W′ =25 −6.0 = 19.0 pips, rather than 25.
- Post-response protective distance. L′ =25 +6.0 = 31.0 pips, rather than 25.
- Sum. W′ + L′ =19.0 +31.0 =50.0 pips, unchanged; the section 4 invariant holds.
- Gain-to-loss ratio. Specified:25 ÷25 =1.00. Actual:19.0 ÷31.0 = 0.61.
Threshold shift. Δp* = d / (W + L) =6.0 ÷50.0 =0.120, 12.0 percentage points. Direct substitution confirms: cost-free p* at specified distances 25 /50 = 50.0%, versus 31.0 /50 = 62.0% after response. With window cost, p* = (31.0 +9.8) /50 =40.8 /50 = 81.6% rather than 69.6% in section 3 before accounting for the price difference; again the gap is 12.0 points.
Expected value at 60% win rate. E =0.60 ×19.0 −0.40 ×31.0 −9.8 =11.4 −12.4 −9.8 = −10.8 pips, versus −4.8 at level B in section 3. Deterioration is exactly d =6.0 pips: shifting by d removes p × d from gains and adds (1 − p) × d to losses, summing to d regardless of win rate.
Information availability and execution model. A close signal is known after the interval ends. The instruction-time quote is known then, and the fill later. A rule can change response time but cannot declare an arbitrary earlier price obtainable. Here d is Bid-to-Bid and excludes buy spread and later fill deviation, which remain in C. This accounting assumption makes no statistical-independence claim between price and response time.
Interpretation. Keeping levels relative to signal, delay d =6 pips raises threshold 69.6% to 81.6% and reduces E by 6 pips to −10.8. This follows from assumptions rather than measuring an M1 waiting effect. A shorter interval can change response price and signal set, but guarantees neither less delay nor more entries. Anchoring new levels to fill creates a different version requiring separate assessment.
Scroll the diagram horizontally or open it at full size.
This resolves whether “delay” enters window accounting. It does, as the resulting price difference rather than a time quantity. Units remain pips; the total comes from comparing signal and actual execution prices in the records. Splitting it into two components requires a third field, response price; section 10 gives the complete list.
Two meanings of “too late”
“Late” has two meanings that often merge in release discussions, although only one can be specified in a rule.
The first concerns price: the distance already travelled leaves insufficient movement to cover entry costs. This compares distance and cost, so is measurable, testable and specifiable. A rule can prohibit entry beyond a specified distance from reference. It passes the two-reader test if reference and distance are given.
The second concerns information: everyone knows, so the reaction is over. This has no unit and supplies no condition because “everyone knows” is unobservable to a participant. It can also be false: price adjustment to public information need not end when information stops being new. Such wording creates a non-reproducible rule rather than a cautious one.
Distinguishing these meanings resolves whether post-direction entry is late. Under the first, compare distance travelled before entry with assumed target and window cost. Under the second, no answer exists because the question is incorrectly formulated.
Who reacts first, and the consequence for the rule
A test cannot assume manual entry at a quote unavailable before information and orders reached the participant. This does not establish that every release rule is inaccessible to retail traders. It requires a realistic response time and then-available prices. Automation can change execution and outcome distribution without itself proving an edge; article 8.9 develops this.
Beyond those moments, ordinary assessment remains open: does the rule have positive expected value after window-appropriate costs on an explicit sample and outside its construction data? Either answer is possible, determined by section 3’s arithmetic and article 8.9’s testing procedure rather than response-time comparison.
Faster entry can change price, cost and signal set. The diagram assumes highest cost in phase one, illustrating rather than proving monotonic dependence or fast-participant profitability. Assess the complete version using obtainable fills instead of assigning a result sign to speed alone.
7. Abstaining from entry as a specified decision
Exclusion comparisons need the same history
The simple annual calculation assumes removing 20 window entries leaves 80 others unchanged, allowing the difference to be attributed to the removed group. In an actual rule, position occupancy, path-dependent conditions or trade limits can create different later entries after exclusion. Reproduce both versions on the same dates; subtracting twenty earlier reported trade outcomes is insufficient.
Negative E in the removed group conditionally supports exclusion within the model, without proving the correct boundary was found. If boundaries were selected after examining results, historical comparison is part of design. Later data ask whether the selected version retains its result outside selection material. Keep the number of examined settings and chosen definition even when later reporting shows only one version.
Being flat during exclusion is a separate decision from prohibiting new entry. A carried position remains part of strategy results. Retrospectively excluding an unscheduled event selects the sample by a known outcome. Account for it, describe it and assess its impact; a new rule applies only to future decisions.
Abstaining is one of five constructions in section 5 and the only one without execution failure because execution does not occur. It is neither no decision nor postponement. Executable, assessable abstention needs the same precision as every other rule.
Specify both boundaries, release list and time source. Without the later boundary, renewed-entry permission is unknown. This specifies neither the actual entry minute nor its cost, which need separate examination.
If exclusion requires handling positions or active orders at a specific time, ensure availability or a rule-consistent mechanism. Prohibiting new entry can be feasible without presence when the normal window already excludes that time and nothing remains active. Assessment depends on actual tasks, rather than merely a release outside availability. Article 8.10 checks particular-version requirements.
In the fixed table model, reducing cost 9.8 to 1.0 reduces threshold 69.6% to 52.0%. Actual exclusion guarantees no such difference: the entry set changes and remaining costs also need measurement. Compare both versions’ total net outcomes rather than treating lower C alone as decisive.
What abstaining does not solve
Excluding entry does not handle positions already open, the most common specification gap. A release window finds the position regardless of entry time. Section 5 calculates carried-position costs, and its protective level guarantees no window execution price.
Specify one of two possibilities: close before the earlier boundary or continue holding. Both are permissible with explicit consequences. Closing pays an outside-window exit cost and forgoes a remaining scenario; holding exposes the position to section 4’s conditions. Leaving it unspecified makes the decision arise during the window from current observations.
A third possibility, resizing before release, is not developed here. Position-size determination and changes belong to section 9, including their outcome effects.
What window exclusion is worth, and what determines it
Comparison can be completed with explicit assumptions; the most important concerns win rate, which the calculation both assumes and challenges.
Assumptions.100 annual trades,20 inside and 80 outside—illustrative values. Target and protective exit 25 pips each. Win rate 60% in both groups, the weakest assumption relaxed below. Costs 9.8 inside and 1.0 outside. Result status: conditional scenario rather than a test result.
Expected value per trade. Gross:0.60 ×25 −0.40 ×25 =5.0 pips. Outside:5.0 −1.0 = +4.0 pips. Inside:5.0 −9.8 = −4.8 pips.
Including the window.80 ×4.0 +20 × (−4.8) =320.0 −96.0 = +224.0 pips annually.
Excluding the window.80 ×4.0 = +320.0 pips annually.
Difference.320.0 −224.0 = 96.0 pips,42.9% of the included-window result. Twenty per cent of trades removed almost one third of the result produced by the other eighty.
Relaxing equal win rates. Window trades stop subtracting results only above the section 3 threshold 69.6%. At 75% window win rate, E =0.75 ×25 −0.25 ×25 −9.8 =18.75 −6.25 −9.8 = +2.7 pips, giving annual 320.0 +20 ×2.7 = 374.0 pips, above exclusion.
Information availability and execution model. Dividing 100 trades requires a recorded window-membership marker, decided before collection rather than afterwards. Actual group win rates are known after execution; before trading they are assumptions.
Result and interpretation. In this simplification, removed-group sign depends on p relative to the threshold with fixed W, L and C. Actual comparisons also involve conditional costs, intermediate exits and exclusion’s effects on other entries. The illustration identifies no measurements on a specific account. Caveat: keeping 80 outside trades unchanged is an assumption requiring both versions to be reproduced.
Exclusion’s value depends on removed trades and effects on remaining entries. Compare two explicit versions on identical dates with full costs and separate event counts. If the window was selected after inspecting outcomes, assessment needs a later period unused for selection.
Exclusion changes the sample
A methodological consequence often overlooked invalidates many conclusions. If the rule was tested across the available period and release windows then excluded, the test no longer describes the executed rule. Test the exclusion version on the same sample and compare results as two distinct rules.
Exclusion changes trades and sometimes remaining-position paths. It can remove expensive fills and positive results too. We do not assume these windows always have highest costs or widest ranges. Compare two explicit versions with each version’s costs.
Which effect dominates depends on the rule, resolved only by calculating both versions rather than deciding which sounds more reasonable.
Concentrated signals may leave few fills after exclusion. This does not remove all information: those fills, costs and uncertainty remain describable. Precision may nonetheless be insufficient for a particular edge decision. Earlier-version results do not become new-version results. Records should quantify removed signals and reconstruct remaining entries rather than treating a small count alone as decisive.
Window width is a parameter that can be overfitted
Both boundaries are designer-set numbers, parameters just like target distance. “I do not trade in windows” can obscure that width is selected, and selecting on the same data used to assess results has known consequences.
The best result after testing many widths still describes a historical version on those data. Selection weakens interpretation as a future-result estimate because good sample performance caused its selection.[5] Disclose trial counts, release lists and boundaries; separate later assessment from selection data. Numerous trials alone do not prove the winner is an artefact.
Spread observations can justify a window, but if from the same data they remain part of design. Document variants and selection reasons and assess later on unused data. Neighbouring-setting sensitivity reveals fragility; one best point does not automatically prove an artefact. Article 8.9 describes the procedure.
Repeated width testing on few events increases accidentally-good-result selection risk. Its probability is unknown without the distribution, count and dependence of trials. Selection records and later data are needed even when the winner looks convincing.
Contractual restrictions
Some rules fail here for contractual rather than arithmetic reasons. Certain brokers impose release-trading provisions, minimum holding periods or pending-order distances, each capable of invalidating a rule regardless of E. Read the specific broker’s documents before specification, using section 11’s comparison criteria. This article assesses neither brokers nor their terms.
One accounting consequence matters. A rule placing pending orders a few pips away ceases to exist where a larger minimum distance applies: E has not changed, the feasible parameter set has. Checking beforehand avoids testing an unavailable rule.
8. The boundary case: when slippage is no longer a small adjustment
Earlier costs of a few pips and shifts exceeding ten pips are illustrative. Their distributions and frequencies are not established here. Abrupt quoting disruption can exceed them; show actual execution and outcome effects rather than burying the event in fixed C.
The sharp sterling move on 7 October 2016 is a documented example. The BIS Markets Committee describes thin liquidity, quote providers reducing activity and triggered protective orders potentially amplifying movement; decline ranges differed across platforms and trading systems.[4]
The BIS report concerns a particular wholesale event. Its figures reconstruct a specified path segment, rather than similar-event frequency or retail-fill distribution. It was not a scheduled release window. Scale on one platform must not transfer to other systems or accounts. The example illustrates execution-model limits rather than forecasting general losses.
This is the mechanism in section 4: an order has a level rather than an execution price, and discontinuity can separate them substantially. Scale alone differs. Execution shifts are therefore a mechanism property to include in assumptions, rather than measurement errors or tool defects to remove from accounting.
What was known beforehand, and only afterwards
Separating prior knowledge from hindsight commentary is essential to an honest argument. The event’s time was known to fall in a low-liquidity part of the day; article 4.3 describes the predictable intraday pattern. Neither event occurrence nor its magnitude was known.
Exclusion hours can be specified beforehand if linked to a hypothesis about available conditions. The report cannot predict an unscheduled event’s timing. Responses to missing data, excessive spread or another observable condition can be defined, without protecting against earlier movement or guaranteeing fills. Mean costs need accompanying dispersion, tails and execution statuses.
Reading a retrospective event description
Such events recur in trading material and support conclusions the evidence cannot bear. Three questions separate what follows from what has been added.
What the figures describe. Movement ranges can come from different trading systems and datasets, whose differences are greatest at such moments. Without source and dataset a number is unreproducible, and cannot be inserted into a reproducible calculation.
Wholesale market or retail execution conditions? These differ, and moving between them requires data absent from market-event reports. “The rate fell this far” does not mean “a protective order filled this far beyond its level”; the latter needs a particular account record.
What was known beforehand? Retrospective explanations usually contain mechanisms unavailable in that form before the event. Separate these layers to extract usable rule conditions, which can use only previously known information.
The same three questions apply to descriptions of what happens in release windows, which is why they are listed here. A description saying that, after the release, “price moved a hundred pips” does not tell us the obtainable entry price, how much of that movement remained available to a rule reacting after the interval closed, or the cost of the trade. Without these three facts, a hundred pips describes the chart rather than a transaction.
How this changes section 2’s accounting
C =9.8 pips was an illustrative assumption, not a sample mean excluding extremes. An actual sample lacking a rare event can leave substantial estimation error. Deliberately excluding costly fills understates mean costs. Skewness alone does not establish that a typical mean from any sample lies below expected value. Section 9 collects inference limits.
9. What this calculation does not tell us
Window costs and the resulting threshold are the main tools here, so their boundaries need particular clarity. These limitations are not fine print: each changes permissible inference.
The threshold is necessary, rather than an edge
Positive model E does not confirm an edge. Empirical results need full costs, uncertainty and selection control. Selection-data assessment has weaker relevance for future outcomes because selection can inflate it; it is not automatically devoid of information.[5] Article 8.2 defines edge and 8.9 the assessment procedure.
The twelve-event example shows large uncertainty for a specified range and p. It proves neither every annual sample uninformative nor that no other effect size is assessable. An edge claim needs data, uncertainty and selection control rather than a positive year alone.
The movement range entered as an assumption
Every cost ratio uses an assumed movement range. It was neither measured nor derived. Section 2’s percentages and section 3’s thresholds inherit conditional status under that assumption and change with it.
This defines scope rather than a flaw. Accounting asks how much window entry costs relative to what the rule targets, rather than whether that target is justified. The latter requires expected-move assessment, discussed in article 7.6, and whether such pricing is accessible without tools retail participants usually lack.
Costs entered as one number rather than a distribution
C =9.8 is an illustrative constant. Actual fills have an unmeasured distribution here. The fixed model shows E/threshold changes; empirical analysis should retain actual costs and examine adverse-case sensitivity. Skewness alone does not identify which trade determines the whole series.
The sound approach records the full deviation distribution and tests sensitivity to substantially higher costs rather than adding an arbitrary reserve. The section 3 table performs such a check: the conclusion fails because E changes sign at a 6.0-pip cost increase.
Direction remains outside this calculation
For fixed W, L and C, the two-point model has positive E exactly when p>p*. Below the threshold these assumptions give a negative sign rather than globally excluding a rule family. Changing signals, exits or execution can change p and other parameters. These figures forecast no direction; they examine specified-condition consequences.
Separating these two questions matters because material about trading around data releases can combine them into one. A surprise relative to consensus is a mechanism affecting direction and belongs to article 6.4. The release-window cost is a mechanism affecting how much of the movement is retained and belongs here. A rule needs both, but each must be assessed separately.
The sample contains only assumption-consistent trades
The stop-market model assumes two reference closures (+W or−L) and separate execution costs. Records can also contain activation without fill, partial fill and rejected instructions. These require statuses rather than removal of events. Per-filled-position and whole-event outcomes need different denominators, distinguished next.
Complete records retain signals, instructions, partial fills and non-fills. Filled-trade means validly describe that subset; per-event results also include no-position cases. We assume neither every non-fill concentrated in abrupt movement nor a known hypothetical result under another construction.
W and L were distances; in records they become means
Main-table W and L are pre-cost mid movements with two specified closures. Net outcomes are W−C and−L−C. Conditional means of actual closures can be used empirically without deducting costs already embedded in prices and fees. Time exits, invalidation and non-execution may require more categories or another outcome unit. An unresolved candle is missing knowledge rather than an established third outcome.
Properly defined recorded means can differ from rule distances in either direction. Release occurrence alone or absent execution data determine no sign. The level model answers a conditional parameter question; actual closures describe the observed version. Comparison requires common price basis, category scope and weighting.
The calculation covers calendar events only
Scheduled-window versus outside-time division needs a specified event list and boundaries. Unscheduled events can occur outside and alter that distribution, without necessarily raising mean costs. Reactive exclusion after detection is a separate time version. Earlier impacts are not removed using later-acquired knowledge.
Outside 1.0 and inside 9.8 are assumed figures, proving neither under- nor overstatement of actual costs. Unscheduled events can alter both estimated groups and their difference. Without measurement, even the order of magnitude is unknown; a particular decision needs your own data.
1.0 and 9.8 illustrate scenario differences without ensuring that scale persists. Changing event proportions or execution conditions can enlarge, reduce or reverse the difference. Substituted-model algebra remains certain; rule conclusions need estimates and uncertainty. Illustration scale therefore does not transfer to an unmeasured population.
From pips to account currency
Converting pip outcomes needs pip value and actual volume. Volume changes leave the threshold unchanged only with proportional costs and unchanged execution and exit distributions. Section 9 covers volume choice and changes.
The 69.6% threshold describes one cost/outcome model rather than ranking style difficulty. Cost and execution affect outcome distribution and can matter for risk; its capital dimension also needs position size. Risk is not reduced to stop distance alone.
10. Self-check exercise and the next step
The exercise identifies execution failures and calculates their effects. A different instrument and parameters require completing the reasoning rather than searching for an earlier number.
GBP/USD, pip 0.0001. Target W =30 pips, protective exit L =20 pips, measured on pre-cost reference mid. Cost parameters are illustrative:
- Outside: spread 0.6 pips, round-trip commission 0.4, entry slippage 0.3, exit slippage 0.5.
- Inside: spread 3.2 pips, commission 0.4, entry slippage 2.5, exit slippage 3.5.
- Calculate completed-trade C for both versions and the window premium.
- Calculate cost as a proportion of assumed target in both versions.
- Calculate cost-free, outside and inside break-even win rates, and the latter difference in percentage points.
- Calculate E at 55% win rate in both versions and determine each sign beforehand.
- Pending-order version: activation 1.26000, fixed target 1.26300, protective 1.25800, fill 1.26120. Calculate post-fill distances, their sum, actual gain-to-loss ratio and cost-inclusive window threshold.
- Return to C′ in point 5. Identify two full-C components not to deduct again from actual Ask-fill–Bid-level distances. Calculate how double counting overstates threshold and reduces E.
1. Costs. Outside: C =0.6 +0.4 +0.3 +0.5 = 1.8 pips. Inside: C =3.2 +0.4 +2.5 +3.5 = 9.6 pips. Premium:9.6 −1.8 = 7.8 pips;9.6 ÷1.8 ≈5.3 times the outside cost.
2. Relative costs. Outside:1.8 ÷30 =0.060 = 6.0%. Inside:9.6 ÷30 =0.320 = 32.0%. Retaining 30 pips net requires 31.8 movement outside and 39.6 inside.
3. Break-even win rate. Cost-free: p* = L / (W + L) =20 /50 =0.400 = 40.0%, not 50.0% because target exceeds protective distance by half, giving ratio 1.50. Outside: p* = (20 +1.8) /50 =21.8 /50 =0.436 = 43.6%. Inside: p* = (20 +9.6) /50 =29.6 /50 =0.592 = 59.2%. Difference: 15.6 percentage points. Increment check: Δp* = ΔK / (W + L) =7.8 ÷50 =0.156; both agree.
4. E at 55% win rate. Signs follow beforehand:55% exceeds 43.6% and falls below 59.2%, implying outside positive and inside negative. Calculation confirms: outside E =0.55 ×30 −0.45 ×20 −1.8 =16.5 −9.0 −1.8 = +5.7 pips; inside 16.5 −9.0 −9.6 = −2.1 pips. Same rule and win rate, opposite signs.
5. Pending order. Buy activates on Ask 1.26000, actual Ask fill 1.26120, fixed Bid sale signals target 1.26300 and protective 1.25800. Fill shift 12 pips. W′ =18, L′ =32, sum 50, ratio 18 /32 = 0.5625. Spread and entry deviation are embedded in Ask-fill comparisons with Bid levels. Remaining C′ = commission 0.4 + exit slippage 3.5 = 3.9 pips. p* = (32 +3.9) /50 = 71.8%. At p =55%, E =0.55 ×18 −0.45 ×32 −3.9 = −8.4 pips. Both exit signals are assumed market-executed rather than limit orders.
6. Why C′ differs from full C. The main mid model has C =9.6; actual-Ask-fill/Bid-level accounting uses only remaining 3.9. Difference 9.6 −3.9 = 5.7 pips corresponds to spread 3.2 and entry slippage 2.5 not deductible again. Incorrect C =9.6 would give 83.2% and E =−14.1 rather than 71.8% and −8.4, overstating threshold 11.4 percentage points and understating E 5.7 pips. This does not decompose the actual 12-pip shift; that needs instruction-time quotes.
6 a. Which prices determine costs? Point 5’s actual Ask fill against Bid levels contains spread and entry, not deducted again. Section 6’s d is Bid-to-Bid from signal to response, excluding Ask purchase and later fill deviation, so full C remains there. A shift alone does not decide: quote side, time and price status—quote, level or fill—are needed.
Check. W′ + L′ =50 pips; at 55%, mean movement from actual distances is 9.9 −14.4 =−4.5. Remaining cost 3.9 gives −8.4. Do not compare purchase Ask and sale Bid levels then add spread again. Full C =9.6 and remaining C′ =3.9 use different bases. All costs are illustrative; GBP/USD pip =0.0001.
What to do next with the calculation
Distances, current quote and commission terms can be determined beforehand. Exit spread and fill deviations remain estimates. No-slippage is a lower cost only under assumed adverse deviations; favourable execution is possible too. Measure direction and distributions rather than treating zero as a universal bound. New-data assessment compares assumptions with execution, including non-fills and partial fills.
Records need five fields beyond an ordinary trade log: rule price (order level or signal price); response price (first available after the condition); actual execution price; release-window marker; closure reason. The first three measure shifts and separate construction from execution effects; the fourth separates cost versions; the fifth identifies closures other than at levels. Article 8.1 lists the scope needed for usable calculations.
If your window threshold exceeds the outside win rate, this is not yet a conclusion: section 3 shows the sample and accumulation time needed to compare them. It identifies the first question as whether the window rule can cover its costs, before reaction direction or the section 5 approach choice.
Positive estimates need uncertainty assessment and data outside selection. Negative assumed-parameter results do not justify a positive edge; changing parameters creates a new version. Near zero, costs and window definitions can be especially influential. This illustration establishes no frequencies for these cases.
Programming the rule can alter entry timing, execution, costs and outcome distribution. Running a program alone proves no edge. Article 8.9 develops testing requirements, including unknown intrabar ordering.
Filter Tier-1 announcement clocks in the Economic Calendar, verify local DST offsets and active desks on the Forex Market Hours Clock, measure spread expansion impact in Trading Costs, and review event definitions in the Macro Cheat Sheet.
FAQ — frequently asked questions
How much does spread widen around a data release?
There is no universal number; without instrument, broker, release and date it is not data.2.5 pips here is illustrative. Measure spread directly before the earlier boundary and at successive post-release times for the same instrument and release across a dozen or so events. Only that series is data, allowing section 2 to describe particular circumstances.
Why did my protective order fill far beyond its specified level?
The protective level defines an exit condition rather than guaranteeing execution price. Here actual Ask fill changes distances to fixed Bid exits from 25/25 to 9/41; after remaining 4.3 cost the threshold is 90.6%. Spread and entry slippage are not deducted twice. Section 4 calculates and checks actual prices; section 11 covers particular order terms.
Do opposing orders make results independent of direction?
They remove the immediate need to choose direction but not double fills, deviations or reversals. Cancellation after first fill may be too slow; OCO is not an atomic guarantee. Include event outcomes with both fills and with neither. Section 5 compares constructions.
Is avoiding the release window merely avoiding the problem?
Exclusion is a rule version to compare. Illustrative C =1 rather than 9.8 reduces the W = L =25 threshold from 69.6% to 52.0%. This proves no post-exclusion profit: trades and distributions also change. Handling existing positions needs a separate decision. Section 7 compares versions.
Can a release-window rule be tested on OHLC?
OHLC can leave post-entry order unknown. The example’s admissible outcomes span 50 pips;12 such cases among 80 trades give extreme means 7.5 pips apart. Report bounds or explicit conservative assumptions. Complete timestamped Bid/Ask ticks can narrow uncertainty, but coverage, source and instrument consistency need checking; “tick” alone proves no correct execution.
Is a tighter protective exit preferable around releases?
At W =25 and C =9.8, tighter L increases the cost-induced increment but reduces the whole threshold:56.6% at L =10 versus 76.6% at L =40. The first model’s loss is −19.8 net. This proves no better version because win rate and execution may change. Section 3 compares four settings and gives the derivative.
Does faster entry after release improve results?
Reaction delay can be specified and varied in sensitivity testing. Access to earlier prices cannot be declared without data and a feasible response method. Faster entry guarantees no lower full cost; spreads and execution may also change. Section 6 compares signal, instruction and fill prices.
Sources and references
- MetaQuotes, Charts / Chart Settings — Bid/Last chart basis and optional Ask line. Chart documentation’s price paragraph was used; this does not describe every platform.
- Andersen et al., Micro Effects of Macro Announcements (AER 2003) — macro surprises associated with conditional-mean exchange-rate jumps. Publisher abstract and metadata used, rather than the full article.
- Chaboud, Chernenko and Wright, Trading Activity and Macroeconomic Announcements (2008) — increased volume after releases, including expected figures; part of the price jump precedes volume growth. Publisher abstract and metadata, volume 6(2–3), pp.589–596 used; no claim of full reading.
- BIS Markets Committee, The sterling flash event of 7 October 2016 — liquidity disruption, platform differences, Reuters mid 1.2600→1.2494 in 8 s; not retail fills. Summary, data scope and phases 1–3, pp.1–10, plus quoting-withdrawal discussion, pp.14–15 used.
- Bailey et al., The Probability of Backtest Overfitting — selecting the best version on selection data. Introduction and problem definition, pp.4–5 of the authors’ PDF, plus article metadata used.
- Chaboud et al., IFDP 823, Federal Reserve 2004 — rapid mean reaction, increased activity and volatility after US data; EBS EUR/USD and USD/JPY 1999–2004. Abstract, data, section 3.3 and summary used; not every modern release.