Macroeconomic reports — reading NFP, CPI and GDP data

NFP can show employment growth while the same release reports higher unemployment. Inflation can fall while prices keep rising. These combinations stop being puzzling once we know exactly what was measured. Below, we unpack employment, price and GDP reports: establish units, recalculate growth rates and check the data vintage available on publication day. Lesson 6.4 covers the exchange-rate response and preparation for a release.

NFP, CPI, PCE, GDP and PMI describe different areas of the economy. Reading a release requires its definition, reference period, available revisions and publication time; the documents and chart are illustrative.

A number needs a date of availability as well as a period

Before asking whether a report is strong or weak, make its number reproducible. Record the economy, indicator, reference period, unit, seasonal treatment and release vintage. The date a quarter ended is not the date its GDP estimate became available. A later revision can be useful today without belonging in an explanation of what was known earlier.

Consider three hypothetical releases about the same quarter. They report seasonally adjusted real GDP growth, quarter on quarter without annualisation. A, B and C are successive release days, not different quarters. Each release becomes public at 09:00 in the same stated time zone.

A vintage ledger for one invented GDP observation
Release availableReported q/q growthWhat the ledger permits
Day A, 09:00+0.5%Use from this release onward
Day B, 09:00+0.7%A later revision
Day C, 09:00+0.4%A further revision

At 09:05 on day A, the available reading is +0.5%. Using +0.4% because it later appears in a database leaks future information into that historical comparison. At 09:05 on day C, +0.4% is available, but the ledger should retain the earlier entries.

Revisions do not necessarily move in one direction. Nor is a missing observation the same as a zero or a later estimate. Mark the gap explicitly and check the statistical producer's explanation before deciding what comparison is possible. Keep the raw release and any transformed calculation in separate fields.

Compare units before comparing economies

The first GDP reading is +0.5% q/q. If that same quarterly pace repeated for four quarters, the compounded annual change would be (1.0054−1)×100≈2.02%. This is an annualised pace, not a forecast that the economy will actually grow by that amount. The BEA formula reference explains this conversion. Multiplying by four gives only an approximation.

A second economy reporting about +2.02% at an annualised quarterly rate could therefore have approximately the same quarterly growth. Comparing the printed numbers without converting their units would exaggerate the difference. Use unrounded inputs where available, then state how the displayed result was rounded. A rounded headline cannot recover a unique underlying level.

Inflation needs a different denominator. For an invented, consistent unadjusted index, suppose the previous month is 126.0, the current month 126.3 and the same month a year earlier 120.0. Monthly inflation is (126.3/126.0−1)×100≈0.24%; annual inflation is (126.3/120.0−1)×100=5.25%. They describe different comparisons of the same current level. Do not add the rates or substitute a seasonally adjusted monthly series without relabelling the calculation. The BLS seasonal-adjustment documentation also explains why adjusted historical indexes can be revised.

Read revisions and survey breadth without inventing output growth

Imagine a payroll release reports 160,000 new jobs against a previously recorded forecast of 150,000, while revising the prior month's gain from 200,000 to 180,000. The current headline exceeds the forecast by 10,000; the prior-month revision is −20,000. Over those two months, the newly reported gains total 340,000 instead of the 350,000 implied by the old prior month plus the forecast. This arithmetic describes the revised employment path. It supplies no rule for the exchange rate, and it does not make jobs equivalent to unique employed people.

Now use a simplified, equally weighted survey of one activity question: 32% report an increase, 48% no change and 20% a decrease. The diffusion index is 32+0.5×48=56. It describes the balance of response directions, not a 6% increase in the amount produced. Actual headline manufacturing PMIs combine components under the producer's methodology; this example calculates only one component. The S&P Global methodology FAQ separates that component formula from headline construction.

Use a reading sheet with one line for each measure rather than merging GDP, jobs and survey points into a score. Add the recorded forecast source when you compare expectations, and retain its collection time. A report may contain several new facts released together. First establish what each measures and when it was available; the next lesson develops the separate question of a price response around a publication.

Three exercises with worked answers

The exercise data are hypothetical. Choose an answer, then check the calculation.

1. Which GDP reading belongs in the day A information set?

At 09:05 on day A, +0.5% was released at 09:00. Revisions to +0.7% and +0.4% arrive on days B and C.

Show the answer and explanation

C. Retain the release timestamp with the reading. Later vintages answer a different question about today’s estimate of that same quarter.

  • A. The later revision was not yet public on day A.
  • B. Day B lies after the specified information cutoff.
  • C. Correct: +0.5% is the only stated vintage available by that cutoff.
  • D. An average imports future releases and was not the reported observation.
2. What annualised pace corresponds to +0.5% q/q?

Assume the quarterly rate repeats for four quarters; compound rather than adding.

Show the answer and explanation

A. Convert the percent to a growth factor, raise it to the fourth power, subtract one and convert back to percent. Keep the annualised label.

  • A. Correct: (1.005^4−1)×100≈2.02%.
  • B. Four times the quarterly rate is an approximation that omits compounding.
  • C. Dividing by four reverses the requested conversion.
  • D. Annualisation is a conditional rate conversion, not a forecast guarantee.
3. What does the simplified survey calculation produce?

32% report an increase, 48% no change and 20% a decrease; responses are equally weighted.

Show the answer and explanation

B. Increasing responses carry full weight, unchanged responses half weight and decreasing responses zero. The result concerns the invented question and sample.

  • A. A diffusion reading measures response directions, not the output growth rate.
  • B. Correct: 32+0.5×48=56 for this single component.
  • C. Unchanged responses contribute half their percentage share.
  • D. No real survey sample or headline component weights have been supplied.

Open the reports and inspect their construction

Continue to the detailed employment, inflation, GDP and PMI methods, real vintage examples, country differences and source documents. The full contents also leads to worksheets for checking a release before interpreting it.

1. The surprise, rather than just the reading — how markets read data

Release analysis benefits from the difference between a reading and a forecast known before announcement. An economist survey must not, however, be equated with full market pricing. A provider may publish a median or mean, and the panel and closing time affect the result. “Surprise” is therefore always calculated against a named source and a record from a specified time.

A headline matching the survey does not rule out an exchange-rate move: details or revisions may supply new information. High-frequency research documents a relationship between unexpected release components and prices, but the result concerns a specified sample and surprise definition.[1] It gives no universal “X thousand more = Y pips” rule. Such a claim would require archived forecasts, first releases, a price series, an explicit window and controls for other events.

Revisions also enter the comparison. In a hypothetical package, a headline matching the survey plus a −80,000 revision to previous months would show a different employment path from the headline alone. This does not determine the currency response. BLS publishes the headline, wages and revisions together; different recipients may read them at different times.

Revisions can be large, and two independent mechanisms operate that should not be confused. Routine revisions concern a particular month's reading: every release revises the previous two months, immediately incorporating changes into the series. Separately, the annual benchmark procedure aligns the employer survey with unemployment-insurance records — quarterly administrative records available much later than the survey. This second process adjusts the March employment level rather than a single reading, with changes then distributed over adjacent months. Its scale can be substantial: the two documented cycles below each revised the level by hundreds of thousands of jobs. Section 2 compares both cycles and distinguishes an announced estimate from the value actually incorporated into the data.

March 2024: three NFP vintagesThe same reference observation, different availability datesMarch 2024: three NFP vintagesThe same reference observation, different availability dates300305310315320thousand jobs, m/m change, SA+3035 April 2024+3153 May 2024+3107 June 2024+12,000−5,000The later vintage was not known on 5 April.Source: archived BLS Employment Situation releases, 5 April, 3 May and 7 June 2024.Each release: 08:30 EDT (America/New_York) = 12:30 UTC. Later benchmarks may revise the series.
Three archived vintages of March 2024 NFP growth, thousand jobs, SA. Available: 5 April +303; 3 May +315; 7 June +310, each at 08:30 ET. Source: archived BLS releases. Benchmarking is a separate revision process; later vintages are not used retrospectively.
Consensus versus actual expectations. A survey median is recorded, but need not match what the market actually positioned for. If a survey closed days earlier indicates +180,000 and intervening data raise expectations, a reading formally “above consensus” may disappoint. This difference is sometimes called a whisper number — without a uniform definition or shared source. If citing a particular comment, retain its author, contents and pre-release timestamp; without that record, do not reconstruct informal expectations from later price movements. Thus the reading-versus-median comparison does not always explain the exchange rate; the difference can be compared only for forecasts recorded before release, while complete market-wide pricing remains unobservable.

A separate layer is how the market was positioned before publication — positioning reports may help explain differences in response size, though reading them has its own pitfalls and its own article (6.6).

2. Four checks before comparing with consensus

“Reading versus expectations” looks trivial and is not. The same indicator name can describe different quantities across countries, or several vintages of one quantity within a country. Four things must be established before a number enters any analysis.

The period the data cover

Publication date is not the reference period; confusing them creates errors that later become hard to detect. The US employment report for May 2023 appeared on 2 June 2023 — “NFP May 2023” means the data month in one calendar and the release month in another. For quarterly data, the lag is longer: the US advance GDP estimate appears roughly four weeks after quarter-end, and Polish quarterly GDP after about six.

The practical consequence is that checking the exchange rate after a release requires its publication time, down to the hour, rather than just the data month. A March reading and a reading published in March are different things and usually describe different economic states.

The unit and what the stated change actually means

US payroll employment counts paid jobs on payrolls, usually in thousands — neither full-time-equivalent positions nor unique individuals. Inflation and unemployment rates are given in percent, but changes in those rates in percentage points. Inflation rising from 3.0% to 3.3% is +0.3 percentage points and +10% relative to the indicator's previous value. A percentage increase in the rate does not mean a 10% rise in the price level.

The period covered by the growth rate must also be established: month on month, quarter on quarter, year on year, or quarter on quarter annualised. The last is the US convention and the source of the most common international-comparison error. The calculation appears in section 3.

Seasonal treatment

Seasonal adjustment reduces the influence of recurring patterns such as hiring before holidays. A pattern does not require every observation to behave identically. US headline CPI month-on-month changes usually concern the SA series, and year-on-year changes the NSA series. Read the specific column label; comparing the same month across years does not remove the need to check adjustment and revisions.

Two consequences matter. First, comparing a reading on one basis with consensus collected for another gives a difference unrelated to the economy. Second, seasonal factors are recalculated annually, so adjusted series change retrospectively even when raw data remain unchanged.

Data vintage

Retain the publication vintage: differences between versions can exceed the difference from a recorded forecast. Two processes run in parallel for US employment, and confusing them causes many misunderstandings about these data.

Routine revisions concern a particular month's reading. Each release revises the previous two months as survey responses arrive too late for the first deadline. These routine changes enter the series immediately.

Benchmarking is fundamentally different. Once a year, survey results are aligned with unemployment-insurance records — nearly complete employment records compiled quarterly but available with a much longer lag than the monthly survey. It revises the March employment level rather than one month; in the raw series, the adjustment is then distributed backwards to the previous April and carried into months after March, while seasonal series may be recalculated over a longer interval. Crucially, the result is announced twice: first as a preliminary estimate about six months ahead, without incorporation into official data, and later as the final revision that actually changes the series.

A benchmark revision concerns the employment level in the reference month, rather than only one monthly increase. For March 2024, BLS initially reported −818,000 jobs NSA; the revision implemented on 7 February 2025 was −598,000 NSA and −589,000 SA. For March 2025, the preliminary estimate was −911,000 NSA, while the 11 February 2026 release reports final adjustments of −862,000 NSA and −898,000 SA.[3] The technical table also gives −861,000 excluding employment-scope changes — a different coverage from the −862,000 headline. Do not replace one with the other without reading the note. Both cycles illustrate vintage differences; they do not establish that every preliminary benchmark will be more negative.

The January 2026 report appeared on Wednesday 11 February at 08:30 ET rather than 6 February. The official BLS listing records the change.[23] This is sufficient reason to treat “first Friday” as guidance and obtain each release date from the schedule.

Similar vintage distinctions apply to other measures: US GDP has three estimates for each quarter, followed by annual and comprehensive revisions.

Implications for historical analysis. A chart built today from a database does not show what markets saw on release day — it shows today's revised vintage. Analysing a response to a particular release requires the value available that day. Some statistical services provide original-vintage archives for this purpose; without such an archive, state the limitation directly rather than treating today's value as a record of that moment.

When there are no data at all

During some periods, a report contains no observation to compare. During the federal funding lapse from 1 October to 12 November 2025, BLS did not collect some October data. Revision, later collection of administrative material and statistical gap-filling are different operations; none should be called an original measurement without qualification.

The effects differed, illustrating the distinction between the two surveys described in section 5. The establishment survey uses payroll records that exist regardless of whether the agency is operating, so October 2025 employment data could be collected late and were published with November data. The household survey asks people about a specific reference week, which cannot be reconstructed afterwards: the October 2025 survey was not conducted and will not be conducted, so there will never be an October 2025 unemployment-rate observation. Price data were similarly affected, though the picture is more complex. The agency cancelled the October 2025 price-index release because most prices cannot be recorded retrospectively, leaving no headline or core index for that month. Not all statistics disappeared, however: data for categories calculated from non-survey sources could be recovered, and some detailed indices were published later. The effect appears in the next release, which reported a change over two months together, from September to November, rather than separately for each.[23]

Following a brief 2026 funding lapse, BLS moved January's employment report from 6 to 11 February and CPI from 11 to 13 February. This differs from the absent October 2025 CPS survey: a delayed release can still contain a measurement for its period.[23]

The practical implication is straightforward. A current series of headline prices, core prices or unemployment has a missing observation around October 2025. Without this context, it is easy to mistake the gap for a download error or, worse, fill it by interpolation that looks like an observation but is not one. The agency maintains a separate listing of cancelled and rescheduled releases following both funding lapses; analyses covering this period should consult it.

Seven questions before using a number in analysis

The minimum set — if any question is unanswered, the number is not yet ready for comparison.

  1. Which country or area does it cover? Since 1 January 2026, the euro area has 21 countries following Bulgaria's accession. Also check whether the historical aggregate has fixed or changing membership; HICP and national CPI are not automatically the same indicator.
  2. What is the exact indicator as named by its publishing institution, rather than abbreviated in a calendar?
  3. What period does it cover, exactly when was it published, and was an observation for that period produced at all? The last question is substantive: observations can be absent, in which case no inserted value is a valid observation.
  4. What is the unit, and is the stated change in percent or percentage points?
  5. Is it seasonally adjusted or raw?
  6. Which vintage is it: preliminary, second, final or post-benchmark?
  7. Which document supplies it, and can that document be retrieved again?

One observation, three vintages available at different times

An archived statement is necessary even if today's database contains the same month. For March 2024 nonfarm payroll employment growth, three successive BLS documents reported:

Source: archived BLS Employment Situation releases of 5 April, 3 May and 7 June 2024. “Third” does not mean immune to later benchmarking.
Publication timeMarch 2024: m/m change, thousand jobs, SAStatus at that time
5 April 2024, 08:30 EDT (America/New_York) / 12:30 UTC+303first reading
3 May 2024, 08:30 EDT (America/New_York) / 12:30 UTC+315second reading
7 June 2024, 08:30 EDT (America/New_York) / 12:30 UTC+310third reading

Regional display example: on these three dates, 12:30 UTC is 14:30 Europe/Warsaw (CEST). The same instant can be displayed in any chosen IANA zone.

The changes were +12,000, then −5,000; relative to the first reading, +7,000. To analyse the 5 April response, use +303 rather than +310 or a later benchmark value. Today's database alone does not reconstruct contemporary consensus. That must be retained separately: provider, aggregation definition and pre-08:30 ET timestamp.

A note should have two clocks: reference_period=2024-03 and release_at=2024-04-05T08:30:00-04:00. Add series=CES total nonfarm, unit=thousand jobs, adjustment=SA, document vintage and an archive link. Add revised values in new rows. Do not overwrite the record showing what was available then.

The missing October 2025 CPI observation requires extra care. BLS used a special estimate of the October value for seasonal calculations. This was a methodological procedure, rather than a recovered direct measurement of headline CPI. A chart connecting September to November should disclose the gap or imputation rather than presenting it as a routine monthly observation.[23]

3. Calculations that turn a headline into a report

The following calculations suffice to read most macroeconomic releases without relying on a calendar and to notice when the calendar differs from the document. All use illustrative values: the focus is the procedure rather than a particular release.

Monthly and annual changes from an index

Index growth is calculated as a ratio of levels. Their difference is a change in index points, interpretable under the same base, but is not percentage inflation. First check the index base and whether both levels come from the same series vintage.

Inputs (illustrative values; seasonally adjusted consumer price index):
It = 320.8 — current month · It −1 = 319.9 — previous month · It −12 = 311.4 — same month a year earlier

Formula
m/m change = (It ÷ It −1 − 1) × 100%
y/y change = (It ÷ It −12 − 1) × 100%

Calculation
m/m = (320.8 ÷ 319.9 − 1) × 100% = (1.002813 − 1) × 100% = +0.28%
y/y = (320.8 ÷ 311.4 − 1) × 100% = (1.030186 − 1) × 100% = +3.02%

Reasonableness check
A monthly pace of 0.28% maintained for a year gives (1.002813)12 − 1 = +3.43%. This is neither 12 × 0.28% = 3.36% nor the 3.02% year-on-year reading. Three different numbers describe the same series — none can substitute for the others.

The base effect — why prices rise while inflation falls

Annual growth compares today's level with the level twelve months earlier. Each month, one month leaves this window and another enters. If the outgoing month was stronger than the incoming one, the annual rate falls even when prices rose in the current month.

Inputs — the same series as above, with one additional point: It −13 = 309.0.

Calculation
month leaving the window: (311.4 ÷ 309.0 − 1) × 100% = +0.78%
month entering the window: +0.28% (calculated above)
annual growth a month earlier: (319.9 ÷ 309.0 − 1) × 100% = +3.53%
annual growth now: +3.02%

Result
Prices rose by 0.28% in the month, while annual inflation fell by 0.51 percentage points. This is disinflation — slower price growth. Deflation is different: a persistent fall in the general price level rather than one negative monthly reading. There is neither a persistent price decline nor a negative monthly reading here; confusing disinflation and deflation reverses the conclusion.

Check
The identity must hold: (1 + 3.0186%) ÷ (1 + 3.5275%) should equal (1 + 0.2813%) ÷ (1 + 0.7767%). Both sides give 0.99508.

The practical implication: when examining the expected annual inflation path over coming months, first check which monthly readings leave the window. Much of a declining annual rate can be determined by the past before any new release arrives; conversely, a weak base can raise annual inflation despite calm current readings.

Annualisation — why +2.4% and +0.6% may mean the same thing

The United States publishes real GDP quarter-on-quarter change expressed at an annual rate. It answers: how much would growth be over a year if that pace persisted for four quarters? Eurostat and most European agencies publish ordinary quarter-on-quarter changes alongside year-on-year changes. Comparing the headlines without conversion is an arithmetic error rather than a difference of interpretation.

Formula (g values are decimal fractions; multiply by 100% for percentage display)
annualised growth = (1 + gq/q)4 − 1
reverse conversion: gq/q = (1 + gann)1/4 − 1

Calculation
quarterly growth of +0.6% → ((1.006)4 − 1) × 100% = (1.024217 − 1) × 100% = +2.42% annualised
headline +2.4% annualised → ((1.024)1/4 − 1) × 100% = +0.59% quarter on quarter

Result
“US GDP +2.4%” and “euro-area GDP +0.6%” describe virtually identical growth in this example. Saying one economy grows “four times faster” is an artefact of conventions rather than an observation.

The real rate

An expected real rate is one channel linking inflation and exchange rates. At an unchanged nominal rate, higher expected inflation lowers it. The report may also change expectations of central bank decisions, growth prospects or risk premia; the following calculation isolates only the first mechanism.

Inputs — nominal rate i = 5.25%, expected inflation πe = 3.00%.

Approximate formula: r ≈ i − πe
Exact formula (Fisher relationship): 1 + r = (1 + i) ÷ (1 + πe)

Calculation
approximate: 5.25% − 3.00% = +2.25%
exact: (1.0525 ÷ 1.0300 − 1) × 100% = +2.18%
difference: 0.07 percentage points.

When the approximation becomes insufficient
At i = 15% and πe = 12%, the approximation gives +3.00%, while the exact calculation (1.15 ÷ 1.12 − 1) × 100% gives +2.68%. The difference rises to 0.32 percentage points. There is no threshold beyond which the approximation suddenly fails: error increases with both quantities, and whether subtraction suffices depends on the required precision.

Use expected inflation for an ex-ante calculation and match its horizon to the nominal return. An ex-post real return instead uses the nominal return actually earned and the inflation actually recorded over that same completed period. Today's overnight rate combined with the last twelve months' CPI is neither of those matched calculations. Name the price measure as well: CPI and PCE need not give the same real return. The St. Louis Fed explains the distinction. Lesson 6.2 covers the policy channel and 6.5 the intercurrency differential.

PMI as a diffusion index

The Purchasing Managers' Index measures neither the output level nor its percentage change. It measures the direction and breadth of changes reported by firms, combining their response distribution into one number.

Formula (for an individual component index): index = share reporting “improvement” + 0.5 × share reporting “no change”

Calculation — two distributions giving the same reading
scenario A: 28% improvement, 50% no change, 22% deterioration → 28 + 25 = 53.0
scenario B: 20% improvement, 66% no change, 14% deterioration → 20 + 33 = 53.0

Result
The same reading describes different situations: A has more divided responses; in B most firms report no change. The threshold of 50 means equal indications of improvement and deterioration, rather than zero economic growth. An index falling from 53 to 51 does not mean output fell by 2% or necessarily fell at all — it means the diffusion index declined. It may result from changes in “improvement”, “no change” or “deterioration” shares; the result alone does not identify any one share.[9]

The formula applies to an individual diffusion index. S&P Global's Manufacturing PMI combines new orders (30%), output (25%), employment (20%), suppliers' delivery times (15%) and stocks of purchases (10%). S&P inverts the delivery-times index before combining it into PMI. ISM gives the five components equal weights; its Supplier Deliveries index is already defined so that above 50 means slower deliveries — do not invert it again. In both cases, delays may also arise from supply disruptions.[9][11]

Response weighting also differs. S&P Global weights responses by firm size and the importance of the subsector, so a large plant and small workshop do not influence the result equally; ISM's panel is constructed differently. Both indicators, however, do not measure the magnitude of change — “slightly better” counts like “much better”, so the reading cannot directly yield a growth rate.

Lower inflation does not restore earlier prices

In a hypothetical index, the price level rises from 100 to 110, then to 112.2 a year later. Annual inflation falls from 10% to 2%, but prices remain 12.2% above the starting level: 1.10 × 1.02 − 1 = 0.122. Returning from 112.2 to 100 would require a decline of 100 / 112.2 − 1 = −10.87%, rather than 12.2%. The percentage bases differ.

Annualisation is not a forecast either. If one hypothetical month gives +0.2813%, (1 + 0.002813)^12 − 1 describes that same pace persisting for twelve months. One observation does not establish persistence. Match the interest and expected-inflation horizon — for example, one year — for an approximate real rate, and name the price measure. Subtracting current year-on-year inflation from an overnight rate mixes horizons.

4. Report hierarchy — what each release adds

A report's importance depends on the question asked. Inflation helps assess persistent price growth, employment the use of labour resources, and GDP the structure of activity. The groups below map content rather than rank predicted volatility. Central bank statements help identify which data currently matter for the bank's assessment.

A map of report contents; editorial classification without an empirical ranking of exchange-rate responses.
Data groupUS examplesQuestion when reading
PricesCPI, PCE, PPIAre the pace, breadth and persistence of price increases changing?
Labour marketEmployment Situation, JOLTS, claims, ADPAre employment, wages or resource utilisation changing?
ActivityGDP, retail sales, ISM, S&P PMIIs the level or structure of activity changing?

A release may become more important when its subject appears in a central bank decision's justification. Record a specific statement and date rather than assuming a report has a permanently fixed “tier”.

The hierarchy is not fixed. When inflation was the main problem, central bank statements focused on price indicators and these came to the fore; when slowing activity became the concern, employment and business surveys returned to prominence. Ordering therefore follows what enters the bank's reaction function at that time (article 6.2), rather than reports' intrinsic properties. Forecasting works similarly: successive releases' information value depends on what they add to already published data, rather than their media prominence.[2]

The key releases differ for other currencies (compare conventions across pairs in currency-pair profiles and check publication schedules in the economic calendar). For sterling, they include UK consumer prices and ONS labour-market statistics; for the Canadian dollar, employment changes and prices published by Statistics Canada.

ABS published Australia's first complete monthly CPI, for October 2025, on 26 November at 11:30 AEDT. It replaced the earlier Monthly CPI Indicator, which did not cover the entire basket every month.[12] The first release date is a historical fact; it does not establish a “last Wednesday” rule for every subsequent reading. Check the full series name, period and time of each current release.

In its November 2025 Statement on Monetary Policy, the RBA announced transitional reliance on quarterly trimmed-mean inflation for assessing underlying inflation until it gained greater confidence in the full monthly series' seasonal properties.[13] This position has a specified date. A later decision requires its current RBA statement; the old transition account does not establish which measure carried the greatest weight then.

Overlapping releases. Several times a year, employment, inflation and a central bank meeting fall within one week. This has a specific data-reading implication: a release following another in the same area may add less because some information has already been incorporated. This also applies to simultaneous releases — attributing a currency change to one is then impossible without extra assumptions. Article 6.4 covers working with such a calendar.

5. The labour market — anatomy of the employment package

Nonfarm payroll employment (NFP) is one series in the BLS Employment Situation report. The full report combines jobs, unemployment, earnings and other measures. It usually appears on the first Friday of the next month at 08:30 Eastern Time, but the agency's schedule governs: holidays and exceptional circumstances can change the date.

The release contains a whole package published simultaneously, rather than one quantity:

  • Employment change (headline NFP) — the number of jobs added or lost. It is given in thousands of jobs and seasonally adjusted. It is one of six items in the package and alone cannot establish what the report showed — the rest of this list explains why.
  • Unemployment rate — comes from the household survey, a completely different sample from payroll employment change. It is given in percent, with changes expressed in percentage points.
  • Average hourly earnings — given as monthly and annual changes. When the central bank focuses on cost pressure, this item may matter more than the headline. Methodological note: it is an average, so it also changes when employment composition changes — large layoffs in low-paid industries can raise average pay without any wage increase.
  • Average workweek — hours may change before job numbers because firms can first reduce hours before deciding on layoffs. This is not a rule, however: direction depends on sector employment composition and the cost of dismissal and rehiring.
  • Revisions — each release revises the previous two months as previously unavailable survey responses arrive. These are routine revisions; the separate annual benchmark revision is described in section 2.
  • Labour-force participation rate — the labour force as a share of the civilian noninstitutional population aged 16 and over. The unemployment rate uses a different denominator: the labour force. People leaving it can lower unemployment without raising employment. BLS definitions specify who counts as employed, unemployed or outside the labour force, including the temporary-layoff exception to active job search.
More people employed, a higher unemployment rateLabour force: 100 → 102 million; two consistent results in one exampleMore people employed, a higher unemployment rateLabour force: 100 → 102 million; two consistent results in one example020406080100million people, hypothetical CPS96 employed4 unemployedMonth 1Rate: 4.00%97 employed5 unemployedMonth 2Rate: 4.90%Hypothetical example: 96 + 4 = 100 million; 97 + 5 = 102 million. Rates: 4/100 and 5/102.CPS counts people. CES counts paid jobs; one person may hold more than one job.
Hypothetical CPS arithmetic: employment 96 → 97 million people, labour force 100 → 102 million, unemployment 4.00% → 4.90%. All data are illustrative. CES counts jobs rather than people or FTEs; growth in one measure does not determine another.

Two surveys in one release

The most common misunderstanding about the US employment report arises because its headline and unemployment rate come from two independent surveys with different observation units. When one shows job growth and the other higher unemployment, there is no contradiction or “data manipulation” — they answer two different questions.

Two surveys in one release — Establishment survey, Household survey
Establishment surveyHousehold survey
Who is asked?employers, about jobs on their payrollshouseholds, about members' labour-force status (approximately 60,000 households monthly)
Observation unita paid job on a payrolla person
Report outputsemployment change, earnings and workweekunemployment, participation and broader underemployment measures
A person with two jobstwo jobs if both fall within CES coveragecounted as one employed person
Self-employed peopleexcludedincluded
Revisionsthe previous two months each month, plus annual benchmarking to administrative recordsno routine monthly revisions; annual new seasonal factors and population-control updates

Worksheet — reading a labour-market report

Worksheet — reading a labour-market report — Report field, Coverage and interpretation
Report fieldCoverage and interpretation
HeadlineNonfarm employment change, in thousands of jobs, seasonally adjusted — from the establishment survey. In the same release but from another survey: the unemployment rate, in percent.
DetailsHourly earnings (monthly and annual change), average workweek, participation rate, broader underemployment measure and sector breakdown.
RevisionsThe previous two months at every release — incorporated immediately. Separately, annual benchmarking: a preliminary estimate in August or September (not incorporated) and a final revision in February with January's report.
PitfallsCES counts paid jobs, rather than people or full-time equivalents. Average pay also changes with employment composition. Unemployment also falls when people stop seeking work. A headline without revisions does not show the sequence's direction.
Monetary policy channelEmployment is one of the US central bank's two mandate objectives. Wage growth informs cost-pressure assessment — when the bank discusses a wage-price spiral, this item may matter more than the headline.
What the headline does not tell us. It does not describe the quality of new jobs: whether they are full-time, how they are paid and which industries create them requires the breakdown, sometimes with a lag. It also does not tell us how many people work — it tells us how many jobs there are.

Accompanying and leading reports

The ADP report chiefly differs from the official release in its source: actual payrolls processed by one payroll firm, rather than sampling the full business population. It covers only the private sector and that firm's customers, so the sample is large but selected by convenience. It is not a raw tally, however: after the 2022 methodology change, observations are weighted to administrative employment records by industry, region and establishment size to reduce selection shifts. Results under the old method do not automatically describe the new one's properties. Earlier-period research must retain the contemporary method and report vintage. The current report is not designed as a forecast of the official release, although it is sometimes used that way.[19] It is read as a clue before the official report and regularly differs from it — expected rather than surprising with two different data sources.

Unemployment claims have a different frequency and source from NFP: unemployment-insurance programme records rather than the same employer survey. The weekly release distinguishes advance and revised values and gives a four-week average.[20] We do not assume corrections must be smaller than every survey's revisions; that comparison would need a measure and sample. Holidays, reporting lags and seasonal changes still matter.

The Job Openings and Labor Turnover Survey (JOLTS) reports openings, hires and separations. Its reference month and release date differ from those of the Employment Situation. To assess labour-market tightness, an analyst may compare job openings with unemployment, but must align the periods and retain the series definitions. The ratio is not a count of jobs guaranteed to be filled. BLS defines openings, hires and separations separately.

Employment and unemployment both rise: check the denominator

In a hypothetical household survey, the labour force is 100 million: 96 million employed and 4 million unemployed, giving 4%. In the next month there are 102 million labour-force participants, with 97 million working and 5 million seeking and available for work. Employment rose by 1 million people, yet unemployment rose to 5 / 102 × 100 = 4.90%, up 0.90 percentage points. The labour force grew faster than employment.

This increase in people is not added to NFP. A person with two paid jobs may create two CES payroll jobs while remaining one employed CPS person. Part-time work is also a job; CES does not convert it into a full-time equivalent. The package nevertheless contains separate hours-and-pay information and CPS part-time data. The headline is no substitute for these.

6. Inflation — CPI, PCE and PPI

Alongside the labour market, inflation is the second area central banks most frequently cite in statements. The difficulty is that there is no single inflation measure: several indicators are published in parallel, differing in coverage, index formula, data source and timing — while the inflation target refers to only one.

CPI (Consumer Price Index)

BLS publishes CPI on the date specified for each month, usually at 08:30 ET. CPI-U all items covers the full basket, while all items less food and energy excludes food and energy. A core measure helps isolate some fluctuations, but replaces neither the headline index nor analysis of excluded categories. Persistent energy price increases still affect living costs and may pass through to other prices. Shelter includes rents and owners' equivalent rent — housing services rather than house purchase prices. Sampling and measurement may lag new current contracts; we do not assign one fixed lag to all CPI.[4]

PCE (Personal Consumption Expenditures Price Index)

Published near month-end by the Bureau of Economic Analysis (BEA). The Fed's 2% inflation objective refers to annual growth in the overall PCE price index, rather than CPI.[18] CPI differences fall into four categories: scope (PCE includes expenditure on households' behalf, for example by employers or public bodies), formula (PCE is chain-linked, with weights changing alongside expenditure composition, while CPI basket weights are updated periodically), data sources and the treatment of certain categories, including housing and healthcare.[5] In practice, both measures may move in the same direction yet differ by several tenths of a percentage point, while the central bank target refers to one of them.

CPI usually appears before PCE, and BEA subsequently uses some BLS data in its calculations. This explains why the later release may add less information. It does not establish that CPI always produces a stronger currency response. PCE may surprise through different coverage, weights, sources or revisions.[5]

PPI (Producer Price Index)

Published around the CPI release. It measures prices at an earlier stage — received by producers rather than paid by consumers. It is less often read in isolation, but selected components, including medical services and portfolio management, enter PCE construction, so analysts use it as a clue before PCE publication.[6]

PPI (Producer Price Index) — Inflation measure, Institution, Release timing, Purpose
Inflation measureInstitutionRelease timingPurpose
CPI / Core CPI BLS around the middle of the month The most widely cited consumer-inflation measure; used to index benefits and contracts, and released early
PCE / Core PCE BEA around month-end The measure underlying the central bank's inflation target; broader coverage and a chain-linked formula
PPI / Core PPI BLS monthly; date and time according to the BLS schedule Producer prices; some components enter PCE, helping estimate it before release

Worksheet — reading an inflation report

Worksheet — reading an inflation report — Report field, Coverage and interpretation
Report fieldCoverage and interpretation
HeadlinePrice-index changes: monthly (seasonally adjusted) and annual (usually raw), separately for headline and core. Four numbers rather than one — calendars may highlight a different one from the agency's release.
DetailsShelter, services excluding shelter, durable goods, food and energy. The breakdown shows whether increases are broad or concentrated in a few categories.
RevisionsCPI-U NSA has no routine revisions, although error corrections are possible; do not extend this rule to C-CPI-U. Seasonal factors are recalculated annually, changing the adjusted series for several previous years even when original data remain the same. Basket weights are updated periodically.
PitfallsBase effects: prices may rise while the annual rate falls. Core inflation is not “true inflation”. A 0.3% change and a 0.3 percentage point change are different quantities. Shelter costs respond with a lag, so current readings partly describe the past.
Monetary policy channelThe US central bank's inflation target refers to annual PCE price growth rather than CPI. CPI appears earlier and helps estimate part of that measure — hence its importance even though it is not formally the target measure.
What this report does not tell us. It does not show the living costs of a particular household. The index describes an average basket; a household with different spending, such as renting in a large city, experiences different inflation from the headline. We do not quantify the gap because it depends on that household's expenditure structure and requires a separate calculation.
Two hypothetical CPI/PCE baskets: different weights and identical component price changes
Explicit fixed-basket example: A 3.8%, B 3.4%. These are not actual CPI/PCE weights. Source of the difference mechanism: BEA FAQ 555. This does not replicate PCE's Fisher index.

For the euro, the basis is Eurostat's Harmonised Index of Consumer Prices — a flash estimate near month-end and a full reading around two weeks later.[16] The ECB bases its target on this index rather than national price indices, and the distinction applies to every member: German CPI and Germany's HICP component are different numbers. For sterling, it is UK CPI from the Office for National Statistics (ONS). For the yen, Tokyo-area prices are published as a preliminary estimate near the reference month's end. The national reading for the same month appears around the 20th of the following month, roughly three weeks later: for January 2026, the dates were 30 January and 20 February respectively.[14] Tokyo CPI is therefore read as an earlier clue, with the qualification that it covers one metropolitan area rather than the whole country.

7. Economic activity — PMI, GDP and retail sales

PMI (Purchasing Managers' Index)

PMI is constructed from standardised questions about new orders, output, employment, delivery times and inventories. Section 3 explains its calculation and implications: it is a diffusion index measuring response distribution rather than output volume. The threshold of 50 means — approximately, because the headline combines several component indices — equal indications of improvement and deterioration. It precedes quantitative data by weeks, at the cost of relying on assessments rather than measurement; it can stay near the threshold for several quarters before anything appears in hard data.

S&P Global publishes flash PMI for only some surveys. The preliminary reading uses responses available by an earlier deadline, and the final uses a fuller set. This need not correct an error. Check whether the survey has a flash version at all, and retain both documents: a current chart does not replace the earlier release.

Distinguish these releases and their coverage:

  • ISM Manufacturing PMI surveys manufacturing firms. The standard timing is the month's first business day at 10:00 ET, but check the specific date in the schedule. Its panel and manufacturing coverage do not represent the whole economy; the composite headline and individual subindices have distinct meanings.[11] Do not infer real GDP growth from PMI alone.
  • ISM Services PMI has a different panel and industry composition from Manufacturing. It usually appears on the third business day at 10:00 ET; ISM specifies a January exception with publication on the fourth business day.[11] The Prices subindex surveys the direction of prices paid by firms, rather than consumer CPI growth or a direct measure of core services inflation. Read it with the question scope and response dates rather than as an automatic predictor of Fed decisions.
  • S&P Global indicators share a common construction. This aids comparison but does not make panels and sector structures identical: 53 points in two countries does not mean equal output growth. Check coverage, sector, flash/final vintage and response collection dates.[9]

PMI is particularly relevant for the euro because the euro area has no single central employment report like NFP. Its composite PMI is therefore one of the earliest broad monthly activity barometers covering the whole currency area, available before quantitative data (keep indicator units and lag notes handy on the FX macro cheat sheet).

GDP (Gross Domestic Product)

GDP is a broad activity measure and particularly easy to compare in inconsistent units. BEA publishes advance, second and third estimates, then annual and comprehensive updates. Each later document may change the quarter's picture through fuller data. Knowledge of prior monthly releases aids interpretation, but does not itself determine the market response's size.[7]

The main pitfall is arithmetic rather than interpretation. The US headline gives quarter-on-quarter change expressed at an annual rate, while Eurostat gives ordinary quarterly change. Comparing “US GDP +2.4%” with “euro-area GDP +0.6%” without conversion suggests a fourfold pace difference that does not exist; the calculation is in section 3. Separately check the headline's drivers: inventory- or net-export-led growth conveys different information from identical consumption-led growth. Calendars do not show that breakdown; obtain it from the release.[7]

Two negative quarters are sometimes called a “technical recession”, but this is not the definition used by the US NBER. Cycle assessment also considers other activity measures. Currency analysis poses a separate question: did weaker growth change expectations of monetary policy and the other currency? Without a price series, documents available at the time and a defined window, we do not assign a particular dollar move to GDP alone.

Retail Sales

The Census Bureau's Advance Monthly Sales for Retail and Food Services measures sales value in retail and food services. It is not a GDP subset under the same definition: it includes imported goods sales and omits much consumer services spending. The seasonally adjusted series remains nominal — Census does not remove price changes.[8] “Core retail sales” has no single definition: a provider may exclude vehicles alone or vehicles and petrol stations. Check item names and codes. The commonly used control group excludes motor vehicle and parts dealers, petrol stations, building materials and food services. Remaining sales are one source for estimating goods PCE; BEA also uses other data and adjustments. Do not equate the change with real growth in all consumption or assume every participant looks at the same column.

Worksheet — reading a GDP report

Worksheet — reading a GDP report — Report field, Coverage and interpretation
Report fieldCoverage and interpretation
HeadlineUS: real quarter-on-quarter GDP change, annualised. Eurostat: quarter-on-quarter and year-on-year change without annualisation. These numbers are not comparable without conversion.
DetailsPrivate consumption, investment, inventory changes, net exports and public spending. Separately, the GDP price index covers domestic production, including exports but not imports. CPI has different coverage. For chain-linked quantities, use official percentage-point contributions to growth; component levels need not sum to GDP.
RevisionsThree estimates for each quarter at monthly intervals, plus annual revisions and less frequent comprehensive revisions altering the historical series retrospectively.
PitfallsAnnualisation conventions (calculation in section 3). An inventory- or net-export-driven headline differs from the same consumption-driven headline. Two negative quarters are not an official US recession definition.
Monetary policy channelGDP rarely determines a single decision: it appears late and much can be anticipated from monthly data. It nevertheless informs assessments of how intensely the economy operates relative to capacity, affecting the entire projection.
What this report does not tell us. It says nothing about distribution — 2% growth may mean most households improve, or deteriorate while a narrow segment grows strongly. It also does not show what is happening now: it describes a quarter that ended a month or more earlier.
Three response distributions and PMI index results
Hypothetical full distributions: A 28/50/22, B 20/66/14, C 30/42/28. A = B = 53. A → C: the index falls to 51, but “improvement” rises from 28% to 30%.

8. A Polish case study — Statistics Poland data and EUR/PLN

Polish macroeconomic releases follow the same rules as US releases — reference period, unit, seasonal treatment and vintage — but differ in their schedule and in how much exchange-rate variability can be linked to them at all.

Key Statistics Poland reports

  • CPI — flash and full estimates — the flash estimate appears near the reference month's end; the full reading around the middle of the next month and may differ. Scheduling note: flash estimates are not published for January or February. Their schedule differs from the rest of the year, partly because basket weights are updated early in the year; check those months' specific dates in the agency schedule rather than applying a general rule.[15]
  • GDP — flash and preliminary estimates — the flash estimate appears about 45 days after quarter-end; the fuller preliminary estimate follows about two months after quarter-end. They are separate releases and may differ. Monthly data help inform the estimates, but do not make the full quarterly breakdown known in advance. The GUS archive lists the Q2 2026 releases on 13 August and 31 August respectively.
  • Industrial production and retail sales — monthly, released around the 20th. They describe activity rather than prices, so affect rate expectations indirectly.
  • Statistics Poland publishes registered unemployment and the Labour Force Survey (BAEL) measure. Registration covers people meeting national employment-office eligibility rules; BAEL measures people without work who actively seek it and are available under the survey definition. Populations, periods and denominators differ. At end-June 2026, registered unemployment was 5.8%, according to the 23 July Statistics Poland release, not seasonally adjusted.[21] We do not compare it with a BAEL figure undocumented here. From 1 June 2025, new legislation allowed certain farmers to register, subject to remaining conditions including regular-income rules, and changed the responsible office to the place of residence. This is a reason to check series comparability, rather than evidence that all subsequent change resulted from the law. Its contribution requires a separate decomposition.

Domestic data and the global backdrop

The zloty responds to more than domestic releases. Foreign data act through two channels simultaneously: they alter foreign rate pricing and thus its differential against Polish rates, and alter investors' willingness to retain emerging-market currency exposure. A separate article in section 7 describes the second channel, beyond this article's scope.

For currencies, distinguish information channels: expected central bank policy, activity prospects and risk premia. 6.2 covers Council decisions and press conferences. US and euro-area data also concern the other side of the pair. Ratings have a different character: agencies announce planned review dates, but may act outside them. A review schedule guarantees neither a rating change nor a particular decision time.

Polish CPI for February 2023 was 18.4% year on year in the full reading published on 15 March; this refers to NSA data and the basket applicable in that release.[15] This fact describes inflation rather than the strength of a later EUR/PLN response. Retain flash and full documents separately. For rate instruments, also record the reference index, maturity and quote date: comparing contracts based on different rates requires adjustment. Benchmark reform details remain in 6.2.[22]

Local data against the global backdrop. A Polish release can coincide with foreign rate repricing or changing risk appetite. Separate those observations before attributing the zloty's move to a domestic number. Quantifying their contributions would require a stated model and sample; this lesson supplies neither percentage attribution nor a fixed domestic/global ranking.

9. Finding the source document

An economic calendar is secondary to an agency release: it gives a value but often omits seasonal treatment, vintage and definition, and may repeat the name of a discontinued release. For every number to be recorded, it helps to trace it to the primary document at least once — even simply to learn its actual name there.

Finding the source document — Institution, Release, Frequency and timing
InstitutionReleaseFrequency and timing
BLS (US)Employment Situationmonthly, usually the first Friday, 08:30 Eastern Time
BLS (US)Consumer Price Index, Producer Price Indexmonthly, around mid-month
BEA (US)Personal Income and Outlays (PCE measures)monthly, near month-end
BEA (US)Gross Domestic Productquarterly, three estimates at monthly intervals; the first about four weeks after quarter-end
Census Bureau (US)Advance Monthly Retail Trade Reportmonthly, around the 15th
ISM (US)Report on Business — manufacturing and servicesmonthly, first and third business days
EurostatHICP flash estimatemonthly, near month-end; full reading around two weeks later
Eurostatnational accounts — euro-area GDPquarterly; preliminary estimate around 30 days after quarter-end
ONS (UK)Consumer price inflationmonthly, around mid-month
ABS (Australia)Consumer Price Index, Australiamonthly; date and time according to the ABS schedule
Statistics Bureau (Japan)Tokyo-area and national price indicesmonthly; Tokyo near the reference month's end, national around the 20th of the following month
Statistics Poland (Poland)CPI flash estimate; full readingmonth-end (except January and February); full reading around the middle of the next month

Timing is indicative — the agency's release schedule, announced in advance for the year, governs. Outside the US, times differ by institution and must be checked in the schedule.

Publisher-local time → UTC → your chosen zone. Keep the publication date and America/New_York alongside 08:30 ET. This is 13:30 UTC under EST (UTC−5) or 12:30 UTC under EDT (UTC−4). Convert that instant to your chosen IANA zone; the date-specific ET converter in lesson 4.5 accepts a date, source hour and output zone. Publication time is part of the datum’s description, needed to reconstruct what was known at a particular moment.

Regional case study — Europe/Warsaw: 08:30 New York is usually 14:30 in Warsaw, or 13:30 during the US–European clock-change mismatch. This local display is an example, not the reader’s assumed location.

Three vintages of March 2024 NFP
Source: archived BLS Employment Situation releases, 5 April, 3 May and 7 June 2024. On all three dates, 08:30 America/New_York (EDT, UTC−4) = 12:30 UTC. Regional display example: 14:30 Europe/Warsaw (CEST). A later benchmark may revise the series again.

This article ends at the document. Article 6.4 covers what happens to exchange rates after publication: how responses unfold over time, why no response can also be informative and how to prepare for a particular release. It is best read once reports themselves are familiar, because every example there assumes the quantity being examined is already understood.

Check the reading before interpreting it

You have two headlines: “GDP +2.4%” and “GDP +0.6%”. Do not compare them without units. After establishing that the first is SAAR and the second q/q SA, calculate 1.024^(1/4) − 1 = 0.5947%: the pace is almost the same. Then match period, vintage and geographic coverage. Only then does the comparison describe economies rather than release formats.

A real-document exercise: which GDP number was available?

The three archived BEA releases below concern the same US quarter, Q1 2025. All were published at 08:30 America/New_York (EDT, UTC−4), or 12:30 UTC. In the regional Europe/Warsaw display example, that is 14:30 CEST. They report seasonally adjusted real GDP growth at an annual rate. This is an archive of the first three estimates, not the latest revised series.

One reference quarter, three publication dates. Source: the respective archived BEA releases.
Available fromVintageReal GDP, SAAR
30 April 2025, 08:30 EDTAdvance−0.3%
29 May 2025, 08:30 EDTSecond−0.2%
26 June 2025, 08:30 EDTThird−0.5%
  1. You are writing notes as of 1 May 2025 and 1 June 2025. Which reading belongs in each note? Keep the publication date alongside the number.
  2. Calculate each successive revision in percentage points of SAAR growth.
  3. Convert all three rates to ordinary q/q growth using 100 × [(1 + SAAR/100)1/4 −1]. Did the revision mean that more output was lost between 30 April and 26 June?

Download the three source observations as CSV (UTF-8; decimal points; reference quarter, timestamp, unit, vintage and source URL in every row).

Show the answers and limits of the calculation

The 1 May note uses −0.3% SAAR, released 30 April; the 1 June note uses −0.2% SAAR, released 29 May. The revisions are +0.1 pp, then −0.3 pp: −0.2 pp overall relative to the first estimate.

The inverse annualisation gives approximately −0.0751%, −0.0500% and −0.1252% q/q. These are calculations from rounded SAAR inputs, not extra official precision. The revisions change the estimate of output during the same January–March quarter; they do not measure production between release dates. “Third” does not mean immune to later annual updates.

No consensus or exchange-rate prices are supplied. We can measure revisions and convert units; we cannot calculate release surprises or attribute a dollar move to them. Keep those separate from the document exercise.

BEA archives: 30 April, 29 May, 26 June 2025. Conversion convention: BEA's annualisation explanation. The CSV transcribes the reported rounded values; the questions and calculations are original educational work.

Further questions

Why does the exchange rate sometimes respond opposite to the headline's implication?

There is no single “most common” cause without a defined sample. A report may have mixed components, expectations may differ from the survey, and another event may occur in the same window. These are hypotheses to test. The chart's direction alone does not choose among them.

Compare any proposed explanation with a forecast recorded before publication, the report's other fields and news in the same window. Lesson 6.4 develops the event chronology; this lesson establishes what the document measured.

Article 6.4 examines the timing and implications of responses; this article ends with reading the document itself.

Should a trader analysing PLN follow US data?

US data also provide an important reference for zloty pairs. In preliminary BIS results published on 30 September 2025, the dollar was on one side of 89.2% of OTC turnover in April 2025, compared with 88.4% in April 2022.[17] This is average daily turnover across surveyed instruments, rather than an open-position share or current measurement. Currency shares sum to 200% because every transaction has two currencies.

In practice, data shifting US rate expectations also shift the reference point for most pairs, including those without the dollar directly in the quote.

FAQ — frequently asked questions

Which macroeconomic report matters most?

There is no permanent ranking. Start with the central bank's latest statement and the risks it identifies, then ask which release can add information about those risks. For the Fed, read the statement and press conference; for the ECB, its statement and press conference; for the BoE, minutes and the Monetary Policy Report.

Where can consensus be found — and is there only one?

Consensus is not an agency statistic. It summarises a particular provider's survey: often a median, but aggregation must be checked. The panel, forecast count, collection deadline and possible updates affect the result. Two services can correctly show different values.

In practice, a reported “surprise” must identify whose consensus it uses and when that survey closed. Without this, surprise magnitude is not reproducible — yet it is the focus of most analyses, rather than the reading alone.

How does a preliminary reading differ from a final one?

In the amount of source data used. Preliminary readings use information received by the calculation cutoff; later vintages add late responses and, for benchmarking, previously unavailable administrative records.

The difference can be large. The preliminary US employment benchmark for March 2024 was −818,000 jobs, while the final revision incorporated around six months later was −598,000 unadjusted. In the next cycle the values were −911,000 and −862,000 respectively.[3] There is a second distinction: the same revision differs between adjusted and raw series — for March 2024, −589,000 and −598,000 respectively. Record both vintage and seasonal treatment for every reading.

Why can employment and unemployment both rise?

Because the two numbers come from independent surveys with different samples and observation units. Payroll employment change counts jobs from an employer survey. The unemployment rate counts people from a household survey.

For example, the May 2023 report, published on 2 June 2023, initially showed 339,000 more jobs and unemployment rising from 3.4% to 3.7%. There is no contradiction: jobs may increase while more household-survey respondents report seeking work. Participation arithmetic, described in section 5, also matters. Check the two surveys separately before treating their results as contradictory.

How much do revisions matter?

Enough to reverse an inference. If today's reading matches expectations but revisions to the previous two months total −100,000, the sequence differs from the headline's implication — and that sequence matters for assessing economic direction.

Distinguish two revision types. Routine revisions concern the previous two months and appear with every report. Benchmarks instead anchor March employment to administrative records and distribute the adjustment across months from the previous April. They are announced twice — first as a preliminary estimate that does not enter the data, then as a final revision that changes them. Although benchmarking does not describe the current month, it is not irrelevant to markets: it changes the assessment of the earlier employment trend and thus the premises behind the expected rate path. It also changes the historical picture on which retrospective analysis rests.

How do Statistics Poland and BLS reports differ?

Methodologically, both agencies follow official-statistics standards; differences concern indicator design details and schedules more than approach. For currencies, another distinction matters: the size of the economy covered and how many transactions settle in its currency.

In the Polish case, the CPI flash estimate is particularly relevant because markets use it to assess the expected rate path. It is nevertheless preliminary and may be revised in the full release — exactly the vintage distinction discussed in section 2.

Sources

Main sources

  1. Torben Andersen, Tim Bollerslev, Francis Diebold and Clara Vega, “Micro Effects of Macro Announcements: Real-Time Price Discovery in Foreign Exchange”, American Economic Review, Vol. 93, No. 1, 2003 — research on exchange-rate responses to macroeconomic releases; the role of surprise, its sign and its timing in the cycle.
  2. Domenico Giannone, Lucrezia Reichlin and David Small, “Nowcasting: The Real-Time Informational Content of Macroeconomic Data”, Journal of Monetary Economics, Vol. 55, No. 4, 2008 — analysis of successive releases' information value for nowcasting. It concerns GDP and inflation forecasting rather than exchange-rate responses and is cited only within that scope.
  3. Bureau of Labor Statistics (BLS), employment benchmark revisions (CES Preliminary Benchmark Revision and final revisions incorporated with January's Employment Situation). March 2024 cycle: preliminary −818,000 estimate on 21 August 2024; final revision on 7 February 2025 of −598,000 unadjusted and −589,000 adjusted. March 2025 cycle: preliminary −911,000 on 9 September 2025; final −862,000 on 11 February 2026 with January 2026's report, on Wednesday after rescheduling following the brief late-January/early-February funding lapse — see [23], distinguishing the two lapses and their effects. Preliminary estimates are not incorporated into the official series. Source document.
  4. Bureau of Labor Statistics (BLS), “Consumer Price Index”, methodology and monthly releases — basket construction, shelter treatment and rules for updating seasonal factors and weights. Source document.
  5. Bureau of Economic Analysis (BEA), “Personal Income and Outlays” and documentation comparing PCE and CPI — differences in scope, index formula, data sources and treatment of selected categories. Source document.
  6. Bureau of Labor Statistics (BLS), “Producer Price Indexes”, methodology — producer-price construction; selected components overlap with PCE categories, which analysts use for their own pre-BEA-release estimates.
  7. Bureau of Economic Analysis (BEA), “Gross Domestic Product” and National Income and Product Accounts (NIPA) methodology — three quarterly estimates, annualised quarterly-growth convention and demand-component breakdown. Source document.
  8. U.S. Census Bureau, “Advance Monthly Sales for Retail and Food Services”, methodological note — definitions of core sales and the control group used in GDP consumption estimates. Source document.
  9. S&P Global, “PMI Methodology and Guide to the Purchasing Managers' Index” — diffusion-index construction and component formula; weights of the five manufacturing headline components (new orders 0.30, output 0.25, employment 0.20, delivery times 0.15, inventories 0.10); response weighting by firm size and subsector importance; relationship between flash and final readings. Source document.
  10. Bureau of Labor Statistics (BLS), “Employment Situation” and technical note — establishment and household surveys, differences in observation units, coverage and revision procedures. Source document.

Additional data and documents

  1. Institute for Supply Management (ISM), “Report on Business — Manufacturing / Services”, monthly releases — survey methodology, component construction including prices paid, and equal weighting of the five headline components, differing from S&P Global's methodology. Source document.
  2. Australian Bureau of Statistics (ABS), “Consumer Price Index, Australia” and announcement of the complete monthly CPI — first release on 26 November 2025 for October 2025; the earlier incomplete monthly indicator was discontinued. Source document.
  3. Reserve Bank of Australia (RBA), Statement on Monetary Policy, November 2025 — technical note on the complete monthly CPI transition and continued quarterly trimmed-mean use for underlying inflation assessment during the transition. Source document.
  4. Statistics Bureau of Japan, “Consumer Price Index — Schedule of Release” — Tokyo and national CPI schedule; for January 2026, 30 January and 20 February 2026 respectively. Source document.
  5. Statistics Poland, “Consumer price indices” and release schedule — flash and full readings; no January or February flash estimate; annual inflation peaked at 18.4% in February 2023, the highest since December 1996. Source document.
  6. Eurostat, “HICP — flash estimate”, HICP methodology and euro-area national accounts; non-annualised quarter-on-quarter GDP growth convention.
  7. Bank for International Settlements (BIS), “Triennial Central Bank Survey: OTC foreign exchange turnover in April 2025”, 30 September 2025 — USD on one side of 89.2% of transactions, compared with 88.4% in April 2022. Source document.
  8. Board of Governors of the Federal Reserve System, “Statement on Longer-Run Goals and Monetary Policy Strategy” — 2% inflation target based on annual PCE price growth. Source document.
  9. ADP Research, ADP National Employment Report — methodology following the 2022 change: data source, weighting to quarterly administrative employment records by industry, region and establishment size, and the qualification that it is not designed to forecast the official release.
  10. U.S. Department of Labor, Unemployment Insurance Weekly Claims, weekly releases — advance value and routine revision of the previous week; periodic seasonal-factor recalculation.
  11. Statistics Poland, Labour market, released 23 July 2026 — registered unemployment of 5.8% at end-June, NSA. The BAEL definition is compared qualitatively without an unconfirmed reading. Official employment offices describe registration changes from 1 June 2025, including farmers' eligibility and regular-income conditions.
  12. Steering Committee of Poland's National Working Group on Benchmark Reform, WIBOR and WIBID reform roadmap and updates — timetable for replacement by POLSTR and winding down existing contracts.
  13. BLS, Revised news release dates following the 2025 and 2026 lapses in appropriations — Employment Situation and CPI sections reviewed. October 2025 CPS was not collected; CES was released late. Headline October CPI indices were not published, although some non-survey categories were recovered. For 2026, the document records January Employment Situation moving from 6 to 11 February and CPI from 11 to 13 February. We do not infer undocumented dates for the entire funding lapse from this table.

Your learning progress

Finished this lesson? Mark it yourself. Opening or scrolling a page never marks it complete.

Progress requires JavaScript and browser storage.

Saved only in this browser. No account or cross-device sync. Clearing site data can erase your progress.

Jarosław Wasiński

Editor-in-chief, ForexMechanics.com • Macro & FX analyst

Independent analyst and practitioner with over 20 years of experience in financial markets. Actively involved in Forex since 2007, with a focus on fundamental analysis, OTC market structure, and disciplined capital risk management.

  • Creator and editor-in-chief of MyBank.pl, providing reliable financial education since 2004.
  • Author of hundreds of in-depth market commentaries, structural analyses, and educational materials for traders and investors.
  • Advocate for market transparency, promoting education grounded in hard data and institutional reports (BIS, ESMA, CFTC).

Full author profile, credentials & published research →

All content is educational and informational only – it does not constitute investment advice or a recommendation. Remember: leveraged trading (Forex/CFD) carries a high risk of rapid capital loss.